This document contains a list of items of works for a building project and their associated costs totaling over Rs. 20 million. The items include earth work, concrete work, brick work, wood work, steel work, flooring, roofing, waterproofing, plumbing and more. Contingency and work charges were added to the total cost of over Rs. 19 million for a grand total project cost of Rs. 20 million.
This document contains a list of items of works for a building project and their associated costs totaling over Rs. 20 million. The items include earth work, concrete work, brick work, wood work, steel work, flooring, roofing, waterproofing, plumbing and more. Contingency and work charges were added to the total cost of over Rs. 19 million for a grand total project cost of Rs. 20 million.
This document contains a list of items of works for a building project and their associated costs totaling over Rs. 20 million. The items include earth work, concrete work, brick work, wood work, steel work, flooring, roofing, waterproofing, plumbing and more. Contingency and work charges were added to the total cost of over Rs. 19 million for a grand total project cost of Rs. 20 million.
NO 1 BUILDING WORKS A EARTH WORK 111085.68 B CEMENT CONCRETE WORK 3005301 C REINFORCED CEMENT CONCRETE WORK 8625671 D BRICK WORK 1921594 E WOOD WORK 373542 F STEEL WORK 803172 G ALUMINIUM WORK 820760 H FLOORING AND SKIRTING WORK 1895163 I ROOFING AND CEILING WORK 48883 J FINISHING WORK 808659 K WATER PROOFING WORK 170340 L SANITARY WORKS 364013 M WATER SUPPLY 178364 N SEWAGE AND DRAINAGE WORKS 40366 TOTAL 19166913.68 Add. 3% Contingency 575007.4104 Add 2% Work Charge Establishment 383338.2736 GRAND TOTAL 20125259.36 SAY 20130000