You are on page 1of 38

JADWAL PUBLIC TRAINING SEMANGATINDO 2018

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
MECHANICAL - ENGINEERING
1 BOILER CONTROL SYSTEMS ENGINEERING 4 02-05 05-08 05-08 02-05 07-10 04-07 02-05 06-09 03-06 01-04 05-08 10-13 7.250.000
2 PLUMBING SYSTEM AND MAINTENANCE 3 22-24 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 22-24 26-28 26-28 6.250.000
SISTEM KONTROL RHVAC (REFRIGERATION HEATING
3 5 29-02 05-09 05-09 02-06 28-01 04-08 02-06 06-10 03-07 29-02 05-09 10-14 9.150.000
VENTILATING AND AIR CONDITIONING)
4 REFRIGERATION RETROFIT 4 02-05 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 01-04 12-15 17-20 7.250.000
5 Pipeline Risk & Integrity Management 3 22-24 05-07 05-07 02-04 21-23 06-08 02-04 06-08 03-05 22-24 05-07 03-05 6.250.000
Piping & Pipeline System Design, Specification,
6 4 29-01 12-15 12-15 09-12 28-31 26-29 09-12 13-16 10-13 29-01 12-15 10-13 7.250.000
Installation & Maintenance
PLANT LIFE MANAGEMENT THROUGH RELIABILITY
7 5 08-12 19-23 19-23 16-20 07-11 04-08 16-20 27-31 17-21 01-05 19-23 17-21 9.150.000
BASED INSPECTION
8 QC for Water Network (Pipeline) Construction 3 02-04 28-02 28-30 25-27 02-04 25-27 25-27 01-03 26-28 10-12 28-30 26-28 6.250.000
9 Risk Based Inspection 3 24-26 12-14 14-16 11-13 23-25 27-29 11-13 13-15 12-14 24-26 14-16 12-14 6.250.000
10 Basic CNC 3 15-17 12-14 12-14 09-11 14-16 25-27 09-11 13-15 10-12 15-17 12-14 10-12 6.250.000
COMPRESSOR OPERATION, MAINTENANCE,
11 TROUBLESHOOTING AND DIAGNOSTIC OF FAILURE 4 22-25 19-22 19-22 16-19 21-24 04-07 16-19 27-30 17-20 22-25 19-22 17-20 7.250.000
ANALYSIS
12 MACHINERY FLUID MECHANICS 4 29-01 26-01 26-29 23-26 28-31 25-28 23-26 30-02 24-27 29-01 26-29 03-06 7.250.000
13 PELUMAS DAN SISTEM PELUMASAN 4 02-05 05-08 05-08 02-05 07-10 05-08 02-05 06-09 03-06 01-04 05-08 10-13 7.250.000
ELECTRIC CHARGING SYSTEM AND STARTING SYSTEM OF
14 4 15-18 19-22 19-22 16-19 21-24 04-07 16-19 27-30 17-20 15-18 19-22 03-06 7.250.000
HEAVY DUTY EQUIPMENT
ELECTRO-PNEUMATICS SYSTEM PRINCIPLES AND
15 4 22-25 26-01 26-29 23-26 28-31 25-28 23-26 30-02 24-27 22-25 26-29 10-13 7.250.000
APPLICATION
16 INSTRUMENTATION AND CONTROL SYSTEM 4 29-01 05-08 05-08 02-05 07-10 05-08 02-05 06-09 03-06 29-01 05-08 17-20 7.250.000
17 KONTROL ELEKTRIK 4 02-05 12-15 12-15 09-12 14-17 26-29 09-12 13-16 10-13 01-04 12-15 04-07 7.250.000
18 MECHATRONICS APPLICATION IN INDUSTRY 4 08-11 20-23 20-23 17-20 22-25 04-07 17-20 28-31 18-21 08-11 20-23 11-14 7.250.000
19 Mekatronika 4 16-19 27-02 27-30 24-27 29-01 25-28 24-27 31-03 25-28 16-19 27-30 18-21 7.250.000
20 PNEUMATIC SYSTEM AND APPLICATION 4 23-26 06-09 06-09 03-06 08-11 05-08 03-06 07-10 04-07 23-26 06-09 03-06 7.250.000
21 PROGRAMMABLE LOGIC CONTROLLER (PLC) 4 30-02 12-15 13-16 10-13 15-18 26-29 10-13 13-16 11-14 30-02 13-16 10-13 7.250.000
22 REKAYASA ELEKTRO HIDROLIK AND APLIKASI 4 02-05 19-22 19-22 16-19 21-24 04-07 16-19 27-30 17-20 02-05 19-22 17-20 7.250.000
23 REKAYASA HIDROLIK AND APLIKASI 4 09-12 26-01 26-29 23-26 28-31 25-28 23-26 30-02 24-27 09-12 26-29 04-07 7.250.000
24 INSTRUMENTATION AND BASIC CONTROL SYSTEM 3 15-17 05-07 05-07 02-04 02-04 06-08 02-04 06-08 03-05 15-17 05-07 26-28 6.250.000
25 BELT CONVEYOR OPERATION & MAINTENANCE 4 02-05 12-15 12-15 09-12 07-10 25-28 09-12 13-16 10-13 01-04 12-15 10-13 7.250.000
26 MANAJEMEN MATERIAL 4 15-18 26-01 26-29 23-26 21-24 26-29 23-26 30-02 24-27 15-18 26-29 03-06 7.250.000
27 Manajemen Perbengkelan 4 22-25 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 22-25 05-08 11-14 7.250.000
28 PENGETAHUAN MATERIAL HANDLING & APLIKASI 4 29-01 12-15 13-16 10-13 08-11 25-28 10-13 13-16 11-14 29-01 13-16 18-21 7.250.000
AC & REFRIGERATION PRINCIPLES, OPERATION AND
29 4 15-18 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 15-18 05-08 10-13 7.250.000
TROUBLESHOOTING
30 ADVANCED VIBRATION MONITORING TECHNIQUE 4 29-01 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 29-01 19-22 03-06 7.250.000
31 BEARING TECHNOLOGY AND LUBRICATION SYSTEM 4 30-02 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 30-02 27-30 17-20 7.250.000
32 CENTRIFUGAL GAS COMPRESSOR Anti Surge Control 4 15-18 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 15-18 19-22 18-21 7.250.000
CENTRIFUGAL GAS COMPRESSOR OPERATION &
33 4 22-25 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 22-25 26-29 04-07 7.250.000
MAINTENANCE
34 CENTRIFUGAL PUMP OPERATION AND MAINTENANCE 4 29-01 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 29-01 06-09 10-13 7.250.000
COLD STORAGE PRINCIPLE, OPERATION &
35 4 16-19 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 16-19 27-30 11-14 7.250.000
TROUBLESHOOTING
36 DIESEL ENGINES OPERATION AND MAINTENANCE 4 02-05 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 02-05 19-22 10-13 7.250.000
GAS TURBINE OPERATION, PERFORMANCE &
37 4 16-19 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 16-19 12-15 17-20 7.250.000
TROUBLESHOOTING
38 HYDRAULICS SYSTEMS Engineering Applications 4 02-05 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 02-05 06-09 18-21 7.250.000
HYDRAULICS SYSTEMS MAINTENANCE &
39 4 09-12 12-15 13-16 10-13 22-25 25-28 10-13 07-10 11-14 09-12 13-16 04-07 7.250.000
TROUBLESHOOTING
40 MATERIAL ATTITUDE USES AND PROBLEMS 4 23-26 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 23-26 06-09 10-13 7.250.000

41 MATERIAL IDENTIFICATION 4 30-02 12-15 13-16 10-13 22-25 25-28 10-13 07-10 11-14 30-02 13-16 17-20 7.250.000
42 METALLURGY FOR NON METALLURGIST 4 09-12 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 09-12 27-30 11-14 7.250.000
43 MOTOR CONTROL CENTER OPERATION & MAINTENANCE 4 15-18 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 15-18 05-08 18-21 7.250.000
OPERATING AND MAINTENANCE OF HEAVY DUTY
44 4 29-01 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 29-01 19-22 10-13 7.250.000
EQUIPMENTS
45 PIPING SYSTEM MATERIAL DESIGN AND MAINTENANCE 4 16-19 12-15 13-16 10-13 22-25 25-28 10-13 07-10 11-14 16-19 13-16 11-14 7.250.000
46 PRACTICAL WELDING 4 09-12 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 09-12 12-15 17-20 7.250.000
47 PRACTICE CONSIDERATIONS OF ARC WELDING 4 15-18 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 15-18 19-22 03-06 7.250.000
48 ROTOR BALANCING AND SHAFT ALIGNMENT 4 02-05 12-15 13-16 10-13 22-25 25-28 10-13 07-10 11-14 01-04 13-16 04-07 7.250.000
49 Welding 4 29-01 20-23 20-23 17-20 29-01 05-08 17-20 13-16 18-21 29-01 20-23 03-06 7.250.000
50 Welding Joint Inspection 4 02-05 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 01-04 27-30 11-14 7.250.000
51 Welding Metallurgy 4 08-11 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 08-11 05-08 18-21 7.250.000
52 Welding Oxy Acetylene 4 16-19 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 16-19 12-15 04-07 7.250.000
53 MANAJEMEN BENGKEL 4 02-05 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 01-04 05-08 03-06 7.250.000
54 THERMAL SPRAY COATING 4 02-05 12-15 12-15 09-12 14-17 25-28 09-12 06-09 10-13 01-04 12-15 10-13 7.250.000
55 MATERIAL HANDLING & PACKAGING 4 08-11 26-01 26-29 23-26 14-17 25-28 23-26 13-16 24-27 08-11 26-29 17-20 7.250.000
56 AEROENGINE BEARING INSPECTION 3 29-31 19-21 19-21 16-18 02-04 04-06 16-18 27-29 17-19 29-31 19-21 26-28 6.250.000
57 AIR COMPRESSOR 3 02-04 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 01-03 26-28 26-28 6.250.000
58 ALIGNMENT AND BALANCING IN ROTATING EQUIPMENT 3 08-10 05-07 05-07 02-04 02-04 06-08 02-04 06-08 03-05 08-10 05-07 26-28 6.250.000
59 BEARING LUBRICATION TECHNOLOGY 4 15-18 12-15 12-15 09-12 21-24 26-29 09-12 13-16 10-13 15-18 12-15 03-06 7.250.000
60 Compressor and Prime Mover Operation & Maintenance 3 31-02 28-02 28-30 25-27 02-04 25-27 25-27 01-03 26-28 31-02 28-30 26-28 6.250.000
61 GAS TURBINE OPERATION & MAINTENANCE 4 09-12 12-15 13-16 10-13 07-10 26-29 10-13 13-16 11-14 09-12 13-16 17-20 7.250.000
62 Machinery Diagnostic 4 16-19 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 16-19 19-22 04-07 7.250.000
63 MANAGING THE INTEGRITY OF GAS PIPELINE SYSTEM 3 24-26 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 24-26 26-28 26-28 6.250.000
64 PIPELINE PIGGING OPERATIONS AND EQUIPMENT 3 29-31 05-07 05-07 02-04 02-04 06-08 02-04 06-08 03-05 29-31 05-07 26-28 6.250.000
65 Vibration Monitoring & Control System 3 31-02 13-15 14-16 11-13 02-04 27-29 11-13 14-16 12-14 31-02 14-16 26-28 6.250.000
MANAJEMEN POST WELD HEAT TREATMENT TEORI,
66 3 29-31 19-21 19-21 16-18 28-30 04-06 16-18 13-15 17-19 29-31 19-21 17-19 6.250.000
STANDARD PROSEDUR DAN APLIKASI
MATERIAL CERTIFICATION REQUIREMENT FOR OIL AND
67 3 08-10 05-07 05-07 02-04 07-09 06-08 02-04 30-01 03-05 08-10 05-07 03-05 6.250.000
GAS INDUSTRY
PROTECTIVE COATING TECHNOLOGY FOR CORROSION
68 3 15-17 13-15 14-16 11-13 14-16 25-27 11-13 08-10 12-14 15-17 14-16 12-14 6.250.000
CONTROL
69 ROTATING EQUIPMENTS 3 24-26 28-02 28-30 25-27 23-25 25-27 25-27 29-31 26-28 24-26 28-30 26-28 6.250.000
70 ANALISIS VIBRASI 4 02-05 05-08 05-08 02-05 07-10 04-07 02-05 13-16 03-06 01-04 05-08 03-06 6.250.000
71 PIPING SYSTEM 4 08-11 12-15 12-15 09-12 14-17 25-28 09-12 27-30 10-13 08-11 12-15 10-13 6.250.000
MOTOR DIESEL PRINSIP DASAR, OPERASI DAN
72 4 22-25 19-22 19-22 16-19 21-24 04-07 16-19 30-02 17-20 22-25 19-22 17-20 6.250.000
PERAWATAN
73 PELUMASAN MESIN 4 29-01 26-01 26-29 23-26 28-31 25-28 23-26 06-09 24-27 29-01 26-29 03-06 7.250.000
74 PEMBANGKIT UAP (BOILER) 4 02-05 05-08 05-08 02-05 07-10 05-08 02-05 13-16 03-06 01-04 05-08 10-13 7.250.000
75 PENGGERAK MULA (PRIME MOVER) 4 08-11 12-15 12-15 09-12 14-17 26-29 09-12 27-30 10-13 08-11 12-15 18-21 7.250.000
76 TURBIN GAS 4 15-18 20-23 20-23 17-20 22-25 04-07 17-20 31-03 18-21 15-18 20-23 04-07 7.250.000
77 TURBIN UAP 4 23-26 27-02 27-30 24-27 29-01 25-28 24-27 07-10 25-28 23-26 27-30 11-14 7.250.000
PIPELINE INTERNAL CORROSION CONTROL AND
78 4 29-01 19-22 19-22 16-19 14-17 05-08 16-19 13-16 17-20 29-01 19-22 11-14 7.250.000
MONITORING
79 Chiller and Cooling Tower Design and Operation 3 08-10 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 08-10 05-07 26-28 6.250.000
DESIGN OF HEATING, VENTILATION AND AIR
80 5 15-19 19-23 12-16 09-13 28-01 25-29 09-13 06-10 10-14 15-19 12-16 03-07 6.250.000
CONDITIONING SYSTEM
81 HVAC SYSTEM Operation & Maintenance 4 22-25 12-15 19-22 16-19 07-10 05-08 16-19 13-16 17-20 22-25 19-22 10-13 7.250.000
PETROLEUM INDUSTRIAL REFRIGERATION OPERATION
82 4 29-01 26-01 26-29 23-26 14-17 25-28 23-26 27-30 24-27 29-01 26-29 17-20 7.250.000
AND MAINTENANCE
83 Practical and Advanced Course on HVAC Systems 4 02-05 06-09 06-09 03-06 21-24 04-07 03-06 31-03 04-07 01-04 06-09 03-06 7.250.000
CENTRIFUGAL PUMP Selection, Operation, and
84 5 08-12 19-23 12-16 09-13 28-01 25-29 09-13 06-10 10-14 08-12 12-16 10-14 9.250.000
Maintenance
Gas Compressor Operation, Maintenance &
85 4 15-18 12-15 19-22 16-19 07-10 04-07 16-19 13-16 17-20 15-18 19-22 17-20 7.250.000
Troubleshooting
86 Hydraulics Power System 5 22-26 26-02 26-30 23-27 14-18 25-29 23-27 27-31 24-28 22-26 26-30 03-07 9.250.000
KOMPRESOR SENTRIFUGAL OPERASI, PEMELIHARAAN,
87 4 29-01 05-08 05-08 02-05 21-24 05-08 02-05 30-02 03-06 29-01 05-08 10-13 7.250.000
DAN TROUBLESHOOTING
PUMP AND COMPRESSOR OPERATION, MAINTENANCE &
88 5 08-12 19-23 12-16 09-13 28-01 25-29 09-13 06-10 10-14 01-05 12-16 17-21 9.250.000
TROUBLESHOOTING
89 SISTEM HIDROLIK DAN PNEUMATIK 4 02-05 12-15 20-23 17-20 08-11 04-07 17-20 13-16 18-21 08-11 20-23 03-06 7.250.000
90 NON DESTRUCTIVE TEST(NDT) 4 29-01 19-22 19-22 16-19 28-31 04-07 16-19 06-09 17-20 29-01 19-22 17-20 7.250.000
91 ASME PTC 4 – 1 4 08-11 05-08 05-08 02-05 07-10 04-07 02-05 27-30 03-06 08-11 05-08 03-06 7.250.000
92 BASIC GAS ENGINE 4 15-18 12-15 12-15 09-12 14-17 25-28 09-12 30-02 10-13 15-18 12-15 10-13 7.250.000
Belt Conveyor Technology, Design Cacilation and
93 4 22-25 19-22 19-22 16-19 21-24 05-08 16-19 06-09 17-20 22-25 19-22 17-20 7.250.000
Troubleshooting
BOILER OPERATION, MAINTENANCE &
94 4 29-01 26-01 26-29 23-26 28-31 26-29 23-26 13-16 24-27 29-01 26-29 04-07 7.250.000
TROUBLESHOOTING
COAL FIRED POWER PLANT COMBUSTION OPERATION &
95 4 02-05 06-09 06-09 03-06 08-11 04-07 03-06 28-31 04-07 01-04 06-09 11-14 7.250.000
MAINTENANCE
96 DIESEL ENGINE OPERATION AND MAINTENANCE 4 09-12 12-15 13-16 10-13 15-18 25-28 10-13 31-03 11-14 09-12 13-16 18-21 7.250.000
97 DIESEL GUNSET OPERATION AND MAINTENANCE 4 16-19 20-23 20-23 17-20 22-25 05-08 17-20 07-10 18-21 16-19 20-23 03-06 7.250.000
GAS TURBINE OPERATION, MAINTENANCE AND
98 4 23-26 27-02 27-30 24-27 29-01 26-29 24-27 13-16 25-28 23-26 27-30 10-13 7.250.000
TROUBLESHOOTING
99 OPERATION & MAINTENANCE OF BOILER 4 30-02 05-08 05-08 02-05 07-10 04-07 02-05 27-30 03-06 30-02 05-08 17-20 7.250.000
100 OPERATION, MAINTENANCE AND TROUBLESHOOTING 4 02-05 12-15 12-15 09-12 14-17 25-28 09-12 30-02 10-13 02-05 12-15 04-07 7.250.000
OF GAS TURBINE
101 Perawatan Belt Conveyor 3 08-10 19-21 19-21 16-18 02-04 06-08 16-18 06-08 17-19 08-10 19-21 26-28 6.250.000
102 STEAM GENERATOR AND TURBINE OPERATION AND 4 15-18 26-01 26-29 23-26 21-24 26-29 23-26 13-16 24-27 15-18 26-29 11-14 7.250.000
MAINTENANCE
103 TRANSMISI DAYA MEKANIK (MECHANICAL POWER 4 29-01 12-15 13-16 10-13 08-11 25-28 10-13 31-03 11-14 29-01 13-16 03-06 7.250.000
TRANSMISSION)
104 VALVE 4 02-05 20-23 20-23 17-20 15-18 05-08 17-20 07-10 18-21 01-04 20-23 10-13 7.250.000
105 Turbomachinery Operation, Maintenance and 4 09-12 27-02 27-30 24-27 22-25 26-29 24-27 13-16 25-28 09-12 27-30 17-20 7.250.000
Troubleshooting
106 PRESSURE VESSEL DESIGN, OPERATION & MAINTENANCE 4 16-19 05-08 05-08 02-05 29-01 04-07 02-05 27-30 03-06 16-19 05-08 04-07 7.250.000
107 ALIGNMENT AND VIBRATION INSPECTION SYSTEM 4 02-05 26-01 26-29 23-26 07-10 25-28 23-26 13-16 24-27 01-04 26-29 03-06 7.250.000
108 AUTOMOTIVE (CARS) AIR CONDITIONING (AC) SYSTEM 4 08-11 05-08 05-08 02-05 14-17 04-07 02-05 27-30 03-06 08-11 05-08 10-13 7.250.000

109 BOILER (KETEL UAP) DAN TURBIN UAP OPERASI, 4 15-18 12-15 12-15 09-12 21-24 26-29 09-12 30-02 10-13 15-18 12-15 17-20 7.250.000
PERAWATAN DAN TROUBLESHOOTING
110 POMPA DAN KOMPRESOR OPERASI, PERAWATAN DAN 4 02-05 06-09 06-09 03-06 15-18 04-07 03-06 28-31 04-07 02-05 06-09 18-21 7.250.000
TROUBLESHOOTING
111 Pump Operation, Maintenance & Troubleshooting 4 16-19 20-23 20-23 17-20 29-01 05-08 17-20 07-10 18-21 16-19 20-23 10-13 7.250.000
112 OPERATION AND MAINTENANCE OF HEAVY DUTY 4 15-18 26-01 26-29 23-26 07-10 25-28 23-26 13-16 24-27 15-18 26-29 03-06 7.250.000
EQUIPMENT
113 ALIGNMENT, LEVELLING AND ROTOR BALANCING 3 29-31 19-21 19-21 16-18 28-30 04-06 16-18 13-15 17-19 29-31 19-21 17-19 6,250,000
114 BEARING AND OIL LUBRICATION FOR MACHINERY 3 02-04 26-28 26-28 23-25 02-04 25-27 23-25 27-29 24-26 01-03 26-28 26-28 6.250.000
115 BOILER OPERATION, MAINTENANCE & 4 15-18 12-15 12-15 09-12 14-17 25-28 09-12 06-09 10-13 15-18 12-15 10-13 7.250.000
TROUBLESHOOTING
116 COMPRESSOR Operation, Maintenance and 3 22-24 19-21 19-21 16-18 21-23 04-06 16-18 13-15 17-19 22-24 19-21 17-19 6.250.000
Troubleshooting
117 GAS AND STEAM TURBINE Operation, Maintenance And 4 29-01 26-01 26-29 23-26 28-31 26-29 23-26 27-30 24-27 29-01 26-29 03-06 7.250.000
Troubleshooting
118 GAS TURBINE PRINCIPLES, INSPECTION, OPERATION, 4 02-05 05-08 05-08 02-05 07-10 05-08 02-05 30-02 03-06 01-04 05-08 11-14 7.250.000
MAINTENANCE AND TROUBLESHOOTING
119 HEAT EXCHANGERS Operation, maintenance and 4 08-11 12-15 13-16 10-13 15-18 25-28 10-13 07-10 11-14 08-11 13-16 18-21 7.250.000
troubleshooting
120 HIGH PRESSURE PUMP (HPP) OPERATION, 4 16-19 20-23 20-23 17-20 22-25 04-07 17-20 13-16 18-21 16-19 20-23 04-07 7.250.000
MAINTENANCE AND TROUBLESHOOTING
121 Lubrication and Bearing Technology 4 23-26 27-02 27-30 24-27 29-01 26-29 24-27 28-31 25-28 23-26 27-30 10-13 7.250.000
122 LUBRIKASI Prinsip Dasar dan Aplikasi 3 31-02 07-09 07-09 04-06 02-04 06-08 04-06 01-03 05-07 31-02 07-09 26-28 7.250.000
123 OIL FILM BEARING (JOURNAL DAN THRUST BEARING 4 02-05 12-15 12-15 09-12 08-11 25-28 09-12 06-09 10-13 02-05 12-15 17-20 7.250.000
HYDRODYNAMIC BEARINGS)
124 PIPELINE Design, Testing, Inspection And Maintenance 4 09-12 19-22 19-22 16-19 14-17 04-07 16-19 13-16 17-20 09-12 19-22 03-06 7.250.000

125 Pressure Vessel Calculation, Codes, Production, 4 15-18 26-01 26-29 23-26 21-24 26-29 23-26 27-30 24-27 15-18 26-29 11-14 7.250.000
Operation, Control & Safeties
126 PUMP OPERATION, MAINTENANCE AND 4 22-25 05-08 05-08 02-05 28-31 05-08 02-05 30-02 03-06 22-25 05-08 18-21 7.250.000
TROUBLESHOOTING
127 PUMP AND COMPRESSOR OPERATION, MAINTENANCE 4 29-01 12-15 13-16 10-13 07-10 25-28 10-13 07-10 11-14 29-01 13-16 04-07 7.250.000
AND TROUBLESHOOTING
128 Refractory and Heat Insulation 4 02-05 20-23 20-23 17-20 15-18 04-07 17-20 13-16 18-21 01-04 20-23 10-13 7.250.000
129 REFRIGERATION OPERATION, MAINTENANCE AND 4 08-11 27-02 27-30 24-27 22-25 26-29 24-27 28-31 25-28 08-11 27-30 17-20 7.250.000
TROUBLESHOOTING
130 ROTATING EQUIPMENT 4 16-19 06-09 06-09 03-06 29-01 05-08 03-06 31-03 04-07 16-19 06-09 03-06 7.250.000
131 STEAM TURBINE OPERATION, MAINTENANCE AND 4 23-26 12-15 12-15 09-12 08-11 25-28 09-12 06-09 10-13 23-26 12-15 11-14 7.250.000
TROUBLESHOOTING
132 ELECTROPLATING 4 02-05 05-08 05-08 02-05 07-10 04-07 02-05 06-09 03-06 01-04 05-08 03-06 7.250.000
133 FAILURE ANALYSIS METHODS AND CASES 4 08-11 12-15 12-15 09-12 14-17 25-28 09-12 13-16 10-13 08-11 12-15 10-13 7.250.000
134 PROSES PENGERJAAN AKHIR DENGAN PELAPIS LOGAM 4 15-18 19-22 19-22 16-19 21-24 05-08 16-19 27-30 17-20 15-18 19-22 17-20 7.250.000
(ELECTROPLATING)
135 ALAT PENUKAR KALOR (HEAT EXCHANGER) OPERASI DAN 4 22-25 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 22-25 26-29 03-06 7.250.000
PERAWATAN

136 ANALISIS DAN PENGUKURAN GETARAN MEKANIK 4 29-01 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 29-01 05-08 10-13 7.250.000
(ANALYSIS AND MEASURING OF VIBRATION MACHINERY)
137 BEARING AND OIL LUBRICATION FOR MACHINERY 4 08-11 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 08-11 20-23 04-07 7.250.000
138 COATING SYSTEM AND PROTECTION CORROSION 4 30-02 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 30-02 13-16 03-06 7.250.000
139 CONVEYOR OPERASI DAN PERAWATAN 4 15-18 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 15-18 05-08 04-07 7.250.000
140 DISAIN ALAT BANTU CEKAM DAN PEGANG (DESIGN OF 4 22-25 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 22-25 12-15 11-14 7.250.000
JIGS AND FIXTURES)
141 DISAIN ALAT PENEKAN DAN PEMBENTUK 4 29-01 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 29-01 20-23 17-20 7.250.000
142 DISAIN KONSTRUKSI MESIN DAN PERALATAN INDUSTRI 4 02-05 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 01-04 27-30 03-06
7.250.000
143 DYNAMIC OF MACHINE TOOLS 4 08-11 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 08-11 06-09 10-13 7.250.000
144 HAND TOOL UTILIZATION 4 30-02 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 30-02 26-29 11-14 7.250.000
145 HEAVY DUTY EQUIPMENT 4 02-05 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 02-05 05-08 17-20 7.250.000
146 HYDRAULIC CONTROL SYSTEM 4 09-12 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 09-12 12-15 03-06 7.250.000
147 KINEMATIKA DAN DINAMIKA MESIN (KINEMATICS AND 4 02-05 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 01-04 13-16 11-14
DYNAMICS OF MACHINERIES) 7.250.000
148 MACHINERY NOISE AND PROBLEM SOLVING 4 08-11 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 08-11 19-22 17-20
149 MANUFACTURING PROCESS TO USE CNC MACHINING 4 02-05 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 02-05 20-23 04-07 7.250.000

150 MANUFACTURING PROCESSES TO USE CASTING 4 09-12 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 09-12 27-30 11-14 7.250.000
151 MANUFACTURING PROCESSES TO USE METAL FORMING 4 15-18 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 15-18 06-09 17-20 7.250.000

152 MEASUREMENT TECHNIQUE FOR MAINTENANCE AND 4 29-01 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 29-01 19-22 10-13 7.250.000
OPERATION LATHE MACHINE
153 NON DESTRUCTIVE TEST 4 08-11 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 08-11 05-08 04-07 7.250.000
154 OXY ACETYLENE WELDING 4 30-02 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 30-02 27-30 03-06 7.250.000
155 PEMILIHAN MATERIAL KOMPONEN MESIN (MATERIAL 4 02-05 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 02-05 06-09 10-13 7.250.000
SELECTION)
156 PENGEMBANGAN TEKNOLOGI DAN STANDAR MATERIAL 4 09-12 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 09-12 13-16 18-21 7.250.000

157 PENGUJIAN MATERIAL BERSIFAT MERUSAK 4 15-18 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 15-18 19-22 04-07 7.250.000
(DESTRUCTIVE TEST)
158 PERLAKUAN PANAS LOGAM (HEAT TREATMENT FOR 4 02-05 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 01-04 12-15 03-06 7.250.000
METAL)
159 PNEUMATIC CONTROL SYSTEM 4 08-11 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 08-11 20-23 10-13 7.250.000
160 PRODUCTION OF HELICAL GEAR 4 09-12 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 09-12 26-29 03-06 7.250.000
161 PROSES PEMESINAN (MACHINING) 4 29-01 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 29-01 20-23 04-07 7.250.000
162 PUMP OPERATION AND MAINTENANCE 4 02-05 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 01-04 27-30 11-14 7.250.000
163 SISTEM PEMIPAAN (PIPING) 4 30-02 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 30-02 26-29 18-21 7.250.000
164 TESTING OF MACHINE TOOLS 4 22-25 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 22-25 27-30 03-06 7.250.000
165 Transmisi Daya Mekanik (Mechanical Power 4 02-05 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 01-04 13-16 18-21 7.250.000
Transmission)
166 TROUBLE SHOOTING, INSPECTION, AND MONITORING 4 08-11 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 08-11 19-22 04-07 7.250.000
OF MACHINERY
167 BASIC WELDING 4 08-11 19-22 19-22 16-19 07-10 04-07 16-19 06-09 17-20 08-11 19-22 17-20 7.250.000
168 GAS METAL ARC WELDING (LAS MIGMAG) 4 15-18 26-01 26-29 23-26 14-17 25-28 23-26 13-16 24-27 15-18 26-29 03-06 7.250.000
169 GAS TUNGSTEN ARC WELDING (LAS TIG) 4 22-25 05-08 05-08 02-05 21-24 05-08 02-05 27-30 03-06 22-25 05-08 10-13 7.250.000
170 MANUAL METAL ARC WELDING (LAS LISTRIK) 4 29-01 12-15 12-15 09-12 28-31 26-29 09-12 30-02 10-13 29-01 12-15 18-21 7.250.000
171 OXY ACETYLENE WELDING (LAS ASETILIN) 4 02-05 20-23 20-23 17-20 08-11 04-07 17-20 07-10 18-21 01-04 20-23 04-07 7.250.000
172 WELDING INSPECTION 4 09-12 27-02 27-30 24-27 15-18 25-28 24-27 13-16 25-28 09-12 27-30 11-14 7.250.000
173 WELDING METALLURGY 4 16-19 06-09 06-09 03-06 22-25 05-08 03-06 28-31 04-07 16-19 06-09 17-20 7.250.000
174 WELDING SAFETY 3 24-26 12-14 14-16 11-13 02-04 27-29 11-13 01-03 12-14 24-26 14-16 26-28 7.250.000
175 WELDING TECHNOLOGY 4 30-02 19-22 19-22 16-19 29-01 04-07 16-19 06-09 17-20 30-02 19-22 03-06 6.250.000
176 BRAZING 4 02-05 26-01 26-29 23-26 07-10 25-28 23-26 13-16 24-27 02-05 26-29 10-13 7.250.000
177 ANALISIS GETARAN DALAM PERAWATAN ROTARY 4 15-18 12-15 12-15 09-12 14-17 25-28 09-12 30-02 10-13 15-18 12-15 17-20 7.250.000
EQUIPMENT
178 BENGKEL ALAT BERAT 4 22-25 19-22 19-22 16-19 21-24 04-07 16-19 06-09 17-20 22-25 19-22 03-06 7.250.000
179 BOILER WATER TREATMENT 4 29-01 26-01 26-29 23-26 28-31 26-29 23-26 13-16 24-27 29-01 26-29 10-13 7.250.000
180 CENTRIFUGAL COMPRESSOR 4 02-05 05-08 05-08 02-05 07-10 05-08 02-05 27-30 03-06 01-04 05-08 18-21 7.250.000
181 CENTRIFUGAL COMPRESSOR & STEAM TURBINE 4 08-11 12-15 13-16 10-13 15-18 25-28 10-13 31-03 11-14 08-11 13-16 04-07 7.250.000
PERFORMANCE
182 CENTRIFUGAL PUMP AND SEAL 4 16-19 20-23 20-23 17-20 22-25 04-07 17-20 07-10 18-21 16-19 20-23 11-14 7.250.000
183 CORROSION AND CATHODIC PROTECTION 4 23-26 27-02 27-30 24-27 29-01 26-29 24-27 13-16 25-28 23-26 27-30 17-20 7.250.000
184 HEAVY EQUIPMENT MANAGEMENT 4 02-05 12-15 12-15 09-12 14-17 25-28 09-12 30-02 10-13 02-05 12-15 10-13 7.250.000
185 HYDRAULIC PNEUMATIC & ELECTRIC CONTROL SYSTEM 4 09-12 19-22 19-22 16-19 21-24 04-07 16-19 06-09 17-20 09-12 19-22 18-21 7.250.000
186 NON DESTRUCTIVE TESTING (NDT) 4 15-18 26-01 26-29 23-26 28-31 26-29 23-26 13-16 24-27 15-18 26-29 04-07 7.250.000
187 OPERASI DAN PEMELIHARAAN TURBIN GAS DAN 4 22-25 05-08 05-08 02-05 07-10 05-08 02-05 27-30 03-06 22-25 05-08 11-14 7.250.000
GENERATOR
188 POMPA OPERASI DAN PERAWATAN 4 29-01 12-15 13-16 10-13 15-18 25-28 10-13 31-03 11-14 29-01 13-16 17-20 7.250.000
189 ROTATING EQUIPMENTS 4 16-19 06-09 06-09 03-06 08-11 05-08 03-06 28-31 04-07 16-19 06-09 18-21 7.250.000
190 TURBIN & GENERATOR OPERATION 4 02-05 26-01 26-29 23-26 28-31 26-29 23-26 13-16 24-27 02-05 26-29 17-20 7.250.000
191 VALVE (CHOKE & CONTROL VALVE) 4 09-12 05-08 05-08 02-05 07-10 05-08 02-05 27-30 03-06 09-12 05-08 03-06 7.250.000
192 WELDING INSPECTION 4 15-18 12-15 13-16 10-13 15-18 25-28 10-13 31-03 11-14 15-18 13-16 10-13 7.250.000
193 LIQUID PENETRANT TESTING 5 29-02 05-09 05-09 02-06 07-11 04-08 02-06 30-03 03-07 29-02 05-09 17-21 9.500.000
194 MAGNETIC PARTICLE TESTING 5 08-12 19-23 12-16 09-13 14-18 25-29 09-13 06-10 10-14 01-05 12-16 03-07 9.500.000
195 PENGENDALIAN MOTOR LISTRIK SECARA ELEKTRONIK 4 02-05 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 01-04 26-29 17-20 7.250.000
196 GENSET TEKNOLOGI, PERAWATAN DAN OPERASI 4 22-25 19-22 19-22 16-19 28-31 05-08 16-19 06-09 17-20 22-25 19-22 04-07 7.250.000
197 SISTEM KONTROL MOTOR LISTRIK 4 23-26 12-15 12-15 09-12 14-17 25-28 09-12 30-02 10-13 23-26 12-15 04-07 7.250.000
198 TRAFO PRINCIPLES, APPLICATION AND MAINTENANCE 4 30-02 19-22 19-22 16-19 21-24 04-07 16-19 06-09 17-20 30-02 19-22 11-14 7.250.000

199 ENGINEERING MATERIAL KNOWLEDGE FOR WAREHOUSE 3 22-24 12-14 12-14 09-11 21-23 25-27 09-11 06-08 10-12 22-24 12-14 10-12 6.250.000
PEOPLE
200 PETROLEUM PLANT & PIPELINE SECURITY 3 15-17 26-28 26-28 23-25 14-16 25-27 23-25 30-01 24-26 15-17 26-28 26-28 6.250.000
MANAGEMENT

201 PEMBANGKITAN ALIRAN PERMUKAAN UNTUK OIL SPILL 4 29-01 27-02 27-30 24-27 08-11 25-28 24-27 13-16 25-28 29-01 27-30 11-14 7.250.000
(OIL FENCE) SEBAGAI PENGUMPUL TUMPAHAN MINYAK
202 Oil Transportation Piping 4 16-19 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 16-19 12-15 11-14 7.250.000
203 GAS DISPERSION ANALYSIS 3 08-10 19-21 19-21 16-18 02-04 04-06 16-18 27-29 17-19 08-10 19-21 26-28 6.250.000
204 Electric motor Operation, Maintenance & 4 15-18 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 15-18 06-09 03-06 7.250.000
Troubleshooting
205 Gas, Oil and Water Pipeline Design and Maintenance 4 09-12 27-02 27-30 24-27 22-25 26-29 24-27 28-31 25-28 09-12 27-30 10-13 7.250.000
206 WELDING SAFETY 2 04-05 12-13 12-13 09-10 02-03 26-27 09-10 20-21 10-11 11-12 12-13 10-11 4.950.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
ENGINEERING - MAINTENANCE
1 RELIABILITY, AVAILABILITY & MAINTAINABILITY ANALYSIS 3 17-19 07-09 07-09 04-06 16-18 04-06 04-06 08-10 05-07 17-19 07-09 05-07 6.250.000
2 RELIABILITY ENGINEERING (TEKNIK KEANDALAN) 2 15-16 26-27 26-27 23-24 14-15 28-29 23-24 15-16 24-25 15-16 26-27 27-28 4.950.000
3 ADVANCED MAINTENANCE MANAGEMENT 4 22-25 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 22-25 12-15 17-20 7.250.000
MACHINERY CONDITION MONITORING FOR PREDICTIVE
4 4 08-11 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 08-11 19-22 18-21 7.250.000
AND PREVENTIVE MAINTENANCE
MAINTENANCE PLANNING SCHEDULING AND
5 4 16-19 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 16-19 26-29 04-07 7.250.000
COORDINATING
MAINTENANCE MANAGEMENT SYSTEM FOR
6 4 29-01 26-01 26-29 23-26 07-10 25-28 23-26 27-30 24-27 29-01 26-29 17-20 7.250.000
SUPERVISOR
7 MAINTENANCE AND SPARE PART MANAGEMENT 4 29-01 12-15 12-15 09-12 28-31 25-28 09-12 30-02 10-13 29-01 12-15 03-06 7.250.000
8 FAULT FINDING SKILLS TECHNICAL TROUBLESHOOTING 3 03-05 07-09 07-09 04-06 02-04 06-08 04-06 08-10 05-07 03-05 07-09 26-28 6.250.000
9 Production Optimization and Minimize Down Time 3 02-04 12-14 12-14 09-11 02-04 27-29 09-11 13-15 10-12 01-03 12-14 26-28 6.250.000
10 RELIABILITY CENTERED MAINTENANCE (RCM) 3 15-17 28-02 28-30 25-27 02-04 25-27 25-27 01-03 26-28 15-17 28-30 26-28 6.250.000
RELIABILITY CENTERED MAINTENANCE (RCM) Increasing
11 3 22-24 07-09 07-09 04-06 02-04 06-08 04-06 08-10 05-07 22-24 07-09 26-28 6.250.000
Safety & Reliability in Gas Pipeline System
12 MAINTENANCE MANAGEMENT 3 03-05 19-21 19-21 16-18 02-04 04-06 16-18 27-29 17-19 03-05 19-21 26-28 6.250.000
13 SPARE PARTS MAINTENANCE MANAGEMENT 3 10-12 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 10-12 26-28 26-28 6.250.000
EFFECTIVENESS DESIGN OF MAINTENANCE
14 3 17-19 13-15 14-16 11-13 14-16 25-27 11-13 14-16 12-14 17-19 14-16 26-28 6.250.000
ORGANIZATION AND ADMINISTRATION
15 MAINTENANCE CONTROL AND MONITORING 3 10-12 12-14 12-14 09-11 02-04 25-27 09-11 13-15 10-12 10-12 12-14 26-28 6.250.000
16 THE ECONOMICS OF MAINTENANCE MANAGEMENT 3 31-02 12-14 12-14 09-11 30-01 25-27 09-11 06-08 10-12 31-02 12-14 10-12 6.250.000
17 MAINTENANCE PLANNING AND SCHEDULING 3 02-04 05-07 05-07 02-04 02-04 06-08 02-04 30-01 03-05 01-03 05-07 03-05 6.250.000
18 PREVENTIVE & PREDICTIVE MAINTENANCE (PPM) 4 08-11 12-15 12-15 09-12 07-10 26-29 09-12 06-09 10-13 08-11 12-15 10-13 7.250.000
19 RELIABILITY CENTERED MAINTENANCE 3 15-17 21-23 21-23 18-20 14-16 04-06 18-20 14-16 19-21 15-17 21-23 19-21 6.250.000
20 Integrated Maintenance Management 4 02-05 20-23 20-23 17-20 07-10 04-07 17-20 30-02 18-21 02-05 20-23 18-21 7.250.000
21 Effective and Efficient of Maintenance Management 3 10-12 28-02 28-30 25-27 02-04 25-27 25-27 08-10 26-28 10-12 28-30 26-28 7.250.000
22 Total Productive Maintenance (TPM) 4 22-25 06-09 06-09 03-06 28-31 04-07 03-06 28-31 04-07 22-25 06-09 18-21 7.250.000
PREVENTIVE MAINTENANCE (SCHEDULE & PREDICTIVE
23 4 09-12 12-15 13-16 10-13 22-25 26-29 10-13 31-03 11-14 09-12 13-16 03-06 7.250.000
MAINTENANCE)
TEKNIK PEMELIHARAAN KENDARAAN (PREVENTIVE
24 4 30-02 05-08 05-08 02-05 14-17 04-07 02-05 27-30 03-06 30-02 05-08 04-07 7.250.000
MAINTENANCE UNTUK KENDARAAN)
25 TEKNIK PERAWATAN MEKANIK 4 02-05 12-15 12-15 09-12 21-24 26-29 09-12 30-02 10-13 01-04 12-15 11-14 7.250.000
26 MAINTENANCE OF MACHINE TOOLS 4 08-11 05-08 05-08 02-05 07-10 05-08 02-05 30-02 03-06 08-11 05-08 03-06 7.250.000
COMPETITIVE MAINTENANCE & SPARE PARTS
27 4 15-18 19-22 19-22 16-19 21-24 04-07 16-19 30-02 17-20 15-18 19-22 03-06 7.250.000
MANAGEMENT
28 Maintenance Strategic Planning 4 23-26 06-09 06-09 03-06 22-25 05-08 03-06 13-16 04-07 23-26 06-09 04-07 7.250.000
29 MAINTENANCE SYSTEM AND DOCUMENTATION 4 30-02 12-15 13-16 10-13 29-01 26-29 10-13 28-31 11-14 30-02 13-16 11-14 7.250.000
30 MANAGING MAINTENANCE RESOURCES 4 02-05 19-22 19-22 16-19 08-11 04-07 16-19 30-02 17-20 02-05 19-22 18-21 7.250.000
RELIABILITY CENTERED MAINTENANCE & RISK BASED
31 5 22-26 19-23 12-16 09-13 21-25 25-29 09-13 27-31 10-14 22-26 12-16 10-14 9.500.000
INSPECTION
32 ROOT CAUSE ANALYSIS 4 29-01 12-15 20-23 17-20 28-31 04-07 17-20 13-16 18-21 29-01 20-23 17-20 7.250.000
33 Spare Part Management 4 02-05 27-02 27-30 24-27 07-10 25-28 24-27 31-03 25-28 01-04 27-30 04-07 7.250.000
34 ADVANCED MAINTENANCE MANAGEMENT 4 15-18 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 15-18 19-22 17-20 7.250.000
35 CONDITIONS BASE INSPECTION AND MAINTENANCE 4 02-05 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 02-05 19-22 10-13 7.250.000
36 MAINTENANCE MANAGEMENT 4 16-19 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 16-19 26-29 03-06 7.250.000
37 MAINTENANCE OF MACHINE COMPONENTS 4 23-26 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 23-26 05-08 10-13 7.250.000
38 MAINTENANCE SYSTEM AND COST 4 30-02 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 30-02 12-15 18-21 7.250.000
39 MODERN MAINTENANCE MANAGEMENT 4 02-05 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 01-04 26-29 18-21 7.250.000
PERENCANAAN DAN PENJADWALAN PERAWATAN
40 4 29-01 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 29-01 05-08 17-20 7.250.000
(MAINTENANCE PLANNING AND SCHEDULING)
41 PREDICTIVE MAINTENANCE 4 16-19 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 16-19 27-30 18-21 7.250.000
42 RELIABILITY CENTERED MAINTENANCE (RCM) 4 23-26 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 23-26 19-22 10-13 7.250.000
43 TEKNOLOGI PERAWATAN MESIN 4 15-18 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 15-18 20-23 17-20 7.250.000
44 Total Productive Maintenance (TPM) 4 29-01 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 29-01 06-09 10-13 7.250.000
45 PREVENTIVE MAINTENANCE 4 02-05 20-23 20-23 17-20 22-25 04-07 17-20 07-10 18-21 01-04 20-23 03-06 7.250.000
46 PREVENTIVE MAINTENANCE GENERATOR 4 08-11 27-02 27-30 24-27 29-01 26-29 24-27 13-16 25-28 08-11 27-30 10-13 7.250.000
CULTURE CHANGE FOR MAINTENANCE AND RELIABILITY
47 3 22-24 19-21 19-21 16-18 21-23 04-06 16-18 13-15 17-19 22-24 19-21 17-19 6.250.000
IMPROVEMENT
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
ENGINEERING - ELECTRICAL
1 ADVANCED CONTROL FOUNDATION 4 29-01 26-01 26-29 23-26 28-31 25-28 23-26 30-02 24-27 29-01 26-29 03-06 7.250.000
2 FLOWMETERING AND CUSTODY TRANSFER 4 08-11 12-15 12-15 09-12 14-17 26-29 09-12 13-16 10-13 08-11 12-15 17-20 7.250.000
3 PRACTICAL PROCESS CONTROL 4 15-18 19-22 19-22 16-19 21-24 05-08 16-19 27-30 17-20 15-18 19-22 04-07 7.250.000
Implementasi DSP (digital signal processing) Dalam
4 4 22-25 12-15 12-15 09-12 07-10 25-28 09-12 13-16 10-13 22-25 12-15 10-13
Sistem Komunikasi 7.250.000
INDUSTRIAL ROBOTICS SENSING, PLANNING, AND
5 4 08-11 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 08-11 26-29 10-13 7.250.000
CONTROL
AUTOMATIC VOLTAGE REGULATOR(AVR) OPERATION
6 4 08-11 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 08-11 06-09 18-21 7.250.000
AND MAINTENANCE
GENERATOR OPERATION, MAINTENANCE &
7 4 23-26 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 23-26 19-22 03-06
TROUBLESHOOTING 7.250.000
8 PLC ( Tingkat dasar ) 4 23-26 20-23 20-23 17-20 29-01 05-08 17-20 13-16 18-21 23-26 20-23 18-21 7.250.000
9 PLC (TINGKAT MAHIR) 4 30-02 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 30-02 27-30 04-07 7.250.000
10 POWER FACTOR IMPROVEMENT 4 02-05 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 02-05 05-08 10-13 7.250.000
11 PROTEKSI TERHADAP GANGGUAN SAMBARAN PETIR 4 29-01 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 29-01 06-09 18-21 7.250.000
SISTEM INSTALASI DAN PROTEKSI JARINGAN TENAGA
12 4 08-11 20-23 20-23 17-20 29-01 05-08 17-20 13-16 18-21 08-11 20-23 10-13 7.250.000
LISTRIK
13 SISTEM INSTALASI TENAGA LISTRIK 4 16-19 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 16-19 27-30 17-20 7.250.000
14 TRANFORMER OPERATION & MAINTENANCE 4 09-12 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 09-12 26-29 04-07 7.250.000
15 Uninterupted Power Suply 4 15-18 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 15-18 06-09 10-13 7.250.000
PERFORMANCE ANALISYS AND MAINTENANCE OF
16 4 08-11 12-15 12-15 09-12 21-24 26-29 09-12 06-09 10-13 08-11 12-15 10-13 7.250.000
ELECTRICAL DISTRIBUTION NETWORKS FOR SUPERVISOR

PERFORMANCE ANALISYS AND OPERATING OF


17 4 15-18 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 15-18 19-22 18-21
GENERATOR SET FOR SENIOR OPERATOR AND ENGINEER
7.250.000
PERFORMANCE ANALISYS AND OPERATING OF
18 INDUCTION MOTOR FOR SENIOR OPERATOR AND 4 22-25 27-02 27-30 24-27 08-11 25-28 24-27 28-31 25-28 22-25 27-30 04-07 7.250.000
JUNIOR SUPERVISOR
DISTRIBUTED CONTROL SYSTEM (DCS) PRINCIPLES,
19 MAINTENANCE, OPERATION, PROGRAMMING & 5 29-02 19-23 19-23 16-20 07-11 04-08 16-20 27-31 17-21 29-02 19-23 03-07 9.250.000
TROUBLESHOOTING
20 DISTRIBUTED CONTROL SYSTEMS (DCS) FUNDAMENTAL 4 02-05 27-02 27-30 24-27 15-18 25-28 24-27 13-16 25-28 02-05 27-30 11-14 7.250.000
21 Electrical Control Wiring 4 09-12 06-09 06-09 03-06 22-25 04-07 03-06 31-03 04-07 09-12 06-09 17-20 7.250.000
22 PLC COMMUNICATION AND LAN 4 22-25 27-02 27-30 24-27 15-18 25-28 24-27 28-31 25-28 22-25 27-30 03-06 7.250.000
PLC OPERATION, PROGRAMMING, TROUBLESHOOTING
23 4 30-02 05-08 05-08 02-05 21-24 05-08 02-05 30-02 03-06 30-02 05-08 10-13 7.250.000
AND MAINTENANCE
24 ACDC ELECTRICAL MOTOR CONTROL 4 29-01 19-22 19-22 16-19 28-31 04-07 16-19 06-09 17-20 29-01 19-22 17-20 7.250.000
25 BASIC ELECTRICAL 3 02-04 26-28 26-28 23-25 02-04 25-27 23-25 13-15 24-26 01-03 26-28 26-28 6.250.000
26 BASIC ELECTRICAL FOR NON ELECTRICIAN 4 08-11 05-08 05-08 02-05 07-10 05-08 02-05 27-30 03-06 08-11 05-08 03-06 7.250.000
27 DISTRIBUTION SYSTEM PROTECTION 4 15-18 12-15 12-15 09-12 14-17 26-29 09-12 30-02 10-13 15-18 12-15 10-13 7.250.000
28 Electric Installation In Hazardous Area 4 22-25 20-23 20-23 17-20 21-24 04-07 17-20 07-10 18-21 22-25 20-23 18-21 7.250.000
29 ELECTRICAL CALIBRATION 3 31-02 28-02 28-30 25-27 30-01 25-27 25-27 14-16 26-28 31-02 28-30 26-28 6.250.000
30 ELECTRICAL EQUIPMENT SYSTEM AND MAINTENANCE 4 02-05 06-09 06-09 03-06 08-11 05-08 03-06 28-31 04-07 02-05 06-09 04-07 7.250.000
ELECTRICAL POWER GENERATOR OPERATION,
31 5 08-12 19-23 12-16 09-13 14-18 25-29 09-13 30-03 10-14 08-12 12-16 10-14 9.500.000
PROTECTION AND MAINTANANCE
32 ELECTRICAL POWER SYSTEM ANALYSIS 4 16-19 12-15 19-22 16-19 22-25 04-07 16-19 06-09 17-20 16-19 19-22 17-20 7.250.000
ELECTRICAL POWER SYSTEM ANALYSIS USING
33 4 23-26 26-01 26-29 23-26 28-31 25-28 23-26 13-16 24-27 23-26 26-29 03-06 7.250.000
SOFTWARE APPLICATION
34 ELECTRICAL POWER SYSTEM PROTECTION 4 29-01 05-08 05-08 02-05 07-10 05-08 02-05 27-30 03-06 29-01 05-08 10-13 7.250.000
35 ELECTRICAL SYSTEM GENERATORSET 4 02-05 12-15 12-15 09-12 14-17 26-29 09-12 30-02 10-13 01-04 12-15 18-21 7.250.000
36 ELECTRONIC SHUTDOWN AND LOGIC SYSTEM 4 08-11 19-22 20-23 17-20 21-24 04-07 17-20 07-10 18-21 08-11 20-23 04-07 7.250.000
37 GENERATOR EXCITATION SYSTEM 4 15-18 27-02 27-30 24-27 29-01 25-28 24-27 13-16 25-28 15-18 27-30 11-14 7.250.000
38 GROUNDING SYSTEM AND LIGHTNING PROTECTION 4 22-25 06-09 06-09 03-06 08-11 05-08 03-06 28-31 04-07 22-25 06-09 17-20 7.250.000
High Voltage Electrical Equipmment Operation,
39 5 29-02 19-23 12-16 09-13 14-18 25-29 09-13 30-03 10-14 29-02 12-16 03-07 9.500.000
Maintenance and Repair
INSTRUMENTATION ELECTRIC Operation and
40 4 02-05 12-15 19-22 16-19 22-25 04-07 16-19 06-09 17-20 02-05 19-22 10-13
Maintenance 7.250.000
41 LV AND MV GENERATOR 4 09-12 26-01 26-29 23-26 28-31 25-28 23-26 13-16 24-27 09-12 26-29 18-21 7.250.000
42 LV ELECTRICAL POWER DISTRIBUTION SYSTEM 4 16-19 05-08 05-08 02-05 07-10 05-08 02-05 27-30 03-06 16-19 05-08 03-06 7.250.000
43 LV SWITCHGEAR MAINTENANCE AND COORDINATION 4 23-26 12-15 12-15 09-12 14-17 26-29 09-12 30-02 10-13 23-26 12-15 11-14
7.250.000
44 POWER ELECTRICAL INSTALLATION SYSTEM 4 29-01 19-22 20-23 17-20 21-24 04-07 17-20 07-10 18-21 29-01 20-23 17-20 7.250.000
45 POWER ELECTRONICS 4 02-05 27-02 27-30 24-27 29-01 25-28 24-27 13-16 25-28 01-04 27-30 04-07 7.250.000
46 POWER PROTECTION RELAY SYSTEM 4 08-11 06-09 06-09 03-06 08-11 05-08 03-06 28-31 04-07 08-11 06-09 10-13 7.250.000
47 POWER TRANSFORMER 4 15-18 12-15 13-16 10-13 15-18 26-29 10-13 31-03 11-14 15-18 13-16 18-21 7.250.000
48 PROGRAMMABLE LOGIC CONTROLLER(PLC) 4 22-25 20-23 19-22 16-19 22-25 04-07 16-19 06-09 17-20 22-25 19-22 03-06 7.250.000
49 Soft Starter (Operation, Protection and Maintanance) 3 31-02 26-28 26-28 23-25 02-04 25-27 23-25 13-15 24-26 31-02 26-28 26-28 6.250.000
TRANSMISSION AND DISTRIBUTION OPERATION AND
50 4 02-05 05-08 05-08 02-05 28-31 05-08 02-05 27-30 03-06 02-05 05-08 11-14 7.250.000
MAINTENANCE
Uninterruptible Power Suply Operation and
51 4 09-12 12-15 12-15 09-12 07-10 26-29 09-12 30-02 10-13 09-12 12-15 17-20 7.250.000
Maintenance
52 VARIABLE FREQUENCY DRIVES 4 16-19 19-22 20-23 17-20 14-17 04-07 17-20 07-10 18-21 16-19 20-23 04-07 7.250.000
53 VARIABLE SPEED DRIVES 4 23-26 27-02 27-30 24-27 21-24 25-28 24-27 13-16 25-28 23-26 27-30 10-13 7.250.000
54 POWER DISTRIBUTION TRANSFORMER 4 29-01 06-09 06-09 03-06 29-01 05-08 03-06 28-31 04-07 29-01 06-09 18-21 7.250.000
55 PEMELIHARAAN MOTOR MOTOR LISTRIK 4 02-05 12-15 13-16 10-13 08-11 26-29 10-13 31-03 11-14 01-04 13-16 03-06 7.250.000
56 TRANSFORMATOR DAYA OPERASI DAN PEMELIHARAAN 3 08-10 21-23 19-21 16-18 02-04 04-06 16-18 06-08 17-19 08-10 19-21 26-28 6.250.000

57 ELECTRONIC SWITCHBOARD RESCUE 3 15-17 26-28 26-28 23-25 02-04 25-27 23-25 13-15 24-26 15-17 26-28 26-28 6.250.000
58 GARDU INDUK 3 22-24 05-07 05-07 02-04 02-04 06-08 02-04 27-29 03-05 22-24 05-07 26-28 6.250.000
59 Electrical Panel Design 3 31-02 12-14 12-14 09-11 02-04 27-29 09-11 30-01 10-12 31-02 12-14 26-28 6.250.000
60 Electrical Safety For Electrical Technician 4 02-05 19-22 20-23 17-20 15-18 04-07 17-20 07-10 18-21 02-05 20-23 11-14 6.250.000
61 Motor Rewinding 3 10-12 28-02 28-30 25-27 02-04 25-27 25-27 14-16 26-28 10-12 28-30 26-28 6.250.000
Perhitungan Perkiraan Biaya Proyek Mekanikal Elektrikal
62 2 18-19 08-09 08-09 05-06 02-03 07-08 05-06 20-21 06-07 18-19 08-09 26-27 4.950.000
Untuk Bangunan Gedung
Power Transformer (Operation, Testing, Asessment And
63 4 23-26 12-15 13-16 10-13 22-25 26-29 10-13 28-31 11-14 23-26 13-16 17-20 7.250.000
Maintenance)
64 ELECTRICAL SAFETY FOR POWER LINE 3 29-31 21-23 19-21 16-18 28-30 04-06 16-18 01-03 17-19 29-31 19-21 26-28 6.250.000
TEKNIK KONSERVASI ENERGI MELALUI AUDIT ENERGI
65 4 23-26 26-01 26-29 23-26 07-10 25-28 23-26 13-16 24-27 23-26 26-29 17-20 7.250.000
PADA BANGUNAN GEDUNG
66 Data Akuisisi, Interfacing, dan Sistem Monitoring 3 02-04 05-07 05-07 02-04 02-04 04-06 02-04 27-29 03-05 01-03 05-07 03-05 6.250.000
Pemrograman Mikrokontroler AVR dengan
67 3 08-10 12-14 12-14 09-11 07-09 25-27 09-11 30-01 10-12 08-10 12-14 10-12 6.250.000
CodeVisionAVR
68 Pemrograman Mikrokontroler untuk Robotika 3 15-17 19-21 19-21 16-18 14-16 06-08 16-18 06-08 17-19 15-17 19-21 17-19 6.250.000
ADVANCE COURSE ON LIGHTNING PROTECTION AND
69 5 15-19 26-02 26-30 23-27 14-18 25-29 23-27 30-03 24-28 15-19 26-30 03-07 9.250.000
GROUNDING SYSTEM
Lightning Protection and Grounding System for Oil & Gas
70 3 22-24 05-07 05-07 02-04 21-23 04-06 02-04 06-08 03-05 22-24 05-07 26-28 6.250.000
Refinery and Petrochemical Installation
LIGHTNING PROTECTION AND GROUNDING SYSTEM FOR
71 POWER PLANT, TRANSMISSION, DISTRIBUTION AND 3 29-31 12-14 12-14 09-11 28-30 25-27 09-11 13-15 10-12 29-31 12-14 10-12 6.250.000
LARGE INDUSTRY
72 ADVANCED PLC PROGRAMMING AND IMPLEMENTATION 4 22-25 19-22 19-22 16-19 21-24 04-07 16-19 30-02 17-20 22-25 19-22 17-20 7.250.000
73 PLC INTEGRATION TO LOCAL AREA NETWORK (LAN) 4 29-01 26-01 26-29 23-26 28-31 25-28 23-26 06-09 24-27 29-01 26-29 03-06 7.250.000
PLC (ROGRAMMABLE LOGIC CONTROLLER) PRINCIPLES,
74 4 02-05 05-08 05-08 02-05 07-10 05-08 02-05 13-16 03-06 01-04 05-08 10-13 7.250.000
OPERATION AND PROGRAMMING
SCADA (SUPERVISORY CONTROL AND DATA
75 ACQUISITION) PRINCIPLES, HARDWARE SYSTEM, 4 08-11 12-15 12-15 09-12 14-17 26-29 09-12 27-30 10-13 08-11 12-15 18-21 7.250.000
OPERATION & PROGRAMMING
76 NUMERICAL CONTROL AND ROBOTIC 4 22-25 26-01 26-29 23-26 28-31 25-28 23-26 30-02 24-27 22-25 26-29 03-06 7.250.000
77 PROGRAMMABLE LOGIC CONTROLLER (PLC) 4 22-25 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 22-25 12-15 18-21 7.250.000
Electric motor Operation, Maintenance &
78 4 15-18 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 15-18 06-09 03-06 7.250.000
Troubleshooting
79 PENGENDALIAN MOTOR LISTRIK SECARA ELEKTRONIK 4 02-05 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 01-04 26-29 17-20 7.250.000
80 GENSET TEKNOLOGI, PERAWATAN DAN OPERASI 4 22-25 19-22 19-22 16-19 28-31 05-08 16-19 06-09 17-20 22-25 19-22 04-07 7.250.000
81 SISTEM KONTROL MOTOR LISTRIK 4 23-26 12-15 12-15 09-12 14-17 25-28 09-12 30-02 10-13 23-26 12-15 04-07 7.250.000
82 TRAFO PRINCIPLES, APPLICATION AND MAINTENANCE 4 30-02 19-22 19-22 16-19 21-24 04-07 16-19 06-09 17-20 30-02 19-22 11-14 7.250.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
ENGINEERING - IT
1 AUTOCAD COSTUMIZATION 4 02-05 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 01-04 26-29 11-14 7.250.000
2 INFORMATION TECHNOLOGY & TELECOMUNICATION 4 22-25 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 22-25 27-30 17-20 7.250.000

3 Holistic Information Security 3 29-31 05-07 05-07 02-04 28-30 04-06 02-04 30-01 03-05 29-31 05-07 03-05 6.250.000
4 Information Security System 3 02-04 12-14 12-14 09-11 02-04 25-27 09-11 06-08 10-12 01-03 12-14 10-12 6.250.000
5 OPTIMALISASI CYBER PUBLIC RELATION 3 08-10 19-21 19-21 16-18 07-09 06-08 16-18 13-15 17-19 08-10 19-21 17-19 6.250.000
6 PENGEMBANGAN KONTEN SITUS WEB PERUSAHAAN 3 15-17 26-28 26-28 23-25 14-16 27-29 23-25 27-29 24-26 15-17 26-28 26-28 6.250.000
7 TEKNIK DESAIN GRAFIS PADA WEB 3 22-24 07-09 07-09 04-06 21-23 04-06 04-06 01-03 05-07 22-24 07-09 05-07 6.250.000
8 TEKNIK DESAIN WEB 3 31-02 13-15 14-16 11-13 30-01 25-27 11-13 08-10 12-14 31-02 14-16 12-14 6.250.000
9 ADVANCE MICROSOFT EXCEL 3 22-24 19-21 19-21 16-18 02-04 04-06 16-18 06-08 17-19 22-24 19-21 26-28 6.250.000
10 ADVANCE MICROSOFT POWERPOINT 3 08-10 28-02 28-30 25-27 07-09 25-27 25-27 14-16 26-28 08-10 28-30 26-28 6.250.000
11 ADVANCE MICROSOFT WORD 3 15-17 07-09 07-09 04-06 14-16 06-08 04-06 29-31 05-07 15-17 07-09 05-07 6.250.000
MICROSOFT EXCEL VISUAL BASIC For Application (VBA-
12 3 24-26 13-15 14-16 11-13 21-23 27-29 11-13 01-03 12-14 24-26 14-16 12-14 6.250.000
MACRO)
BASIC AUTOCAD 2D (2D TECHNICAL DRAWING WITH
13 5 15-19 05-09 05-09 02-06 14-18 04-08 02-06 30-03 03-07 15-19 05-09 03-07 9.500.000
AUTOCAD)
BASIC AUTOCAD 3D (3D TECHNICAL DRAWING WITH
14 2 22-23 12-13 12-13 09-10 21-22 25-26 09-10 20-21 10-11 22-23 12-13 10-11 4.950.000
AUTOCAD)
15 BASIC TELECOMMUNICATION PABX 3 15-17 26-28 26-28 23-25 02-04 25-27 23-25 27-29 24-26 15-17 26-28 26-28 6.250.000
16 BASIC VSAT SYSTEM 3 22-24 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 22-24 05-07 26-28 6.250.000
17 FIBER OPTIC SYSTEM 3 02-04 19-21 19-21 16-18 02-04 06-08 16-18 13-15 17-19 01-03 19-21 26-28 6.250.000
18 Fraud Management in telecommunication business 3 08-10 28-02 28-30 25-27 02-04 25-27 25-27 29-31 26-28 08-10 28-30 26-28 6.250.000

19 INTERNETWORKING DENGAN TCP IP 3 17-19 07-09 07-09 04-06 14-16 04-06 04-06 01-03 05-07 17-19 07-09 26-28 6.250.000
20 IPTV - TEKNOLOGI, PELUANG BISNIS DAN REGULASI 3 24-26 13-15 14-16 11-13 21-23 27-29 11-13 08-10 12-14 24-26 14-16 10-12 6.250.000
NETWORK MANAGEMENT AND OPERATIONS SUPPORT
21 3 31-02 21-23 21-23 18-20 28-30 06-08 18-20 14-16 19-21 31-02 21-23 17-19 6.250.000
SYSTEM
22 POWER LINE CARRIER 3 03-05 26-28 26-28 23-25 02-04 25-27 23-25 27-29 24-26 03-05 26-28 26-28 6.250.000
23 Teknologi dan Bisnis di WiMAX dan Sub WiMAX 3 10-12 05-07 05-07 02-04 07-09 04-06 02-04 30-01 03-05 10-12 05-07 03-05 6.250.000
24 MANAJEMEN KABEL PADA JARINGAN TELEKOMUNIKASI 4 15-18 12-15 12-15 09-12 15-18 26-29 09-12 06-09 10-13 15-18 12-15 11-14 7.250.000
25 MIKROTIK FUNDAMENTAL 3 29-31 28-02 28-30 25-27 30-01 25-27 25-27 29-31 26-28 29-31 28-30 26-28 6.250.000
26 FUNDAMENTAL OF RADIO COMMUNICATIONS 3 02-04 07-09 07-09 04-06 02-04 04-06 04-06 01-03 05-07 01-03 07-09 05-07 6.250.000
INFORMATION TECHNOLOGY INFRASTRUCTURE LIBRARY
27 4 15-18 27-02 27-30 24-27 14-17 25-28 24-27 30-02 25-28 15-18 27-30 04-07 7.250.000
(I T I L) VERSION 3.1
28 MASTERING MICROSOFT EXCEL 2007 2 11-12 26-27 26-27 23-24 10-11 25-26 23-24 20-21 24-25 11-12 26-27 26-27 4.950.000
CAD BIDANG TEKNIK MESIN (CAD FOR MECHANICAL
29 4 16-19 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 16-19 27-30 11-14 7.250.000
AUTOCAD OR CATIA)
30 Teknologi CAD CAM 4 09-12 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 09-12 12-15 11-14 7.250.000
31 PENGEMBANGAN SITUS WEB 3 22-24 12-14 12-14 09-11 02-04 25-27 09-11 06-08 10-12 22-24 12-14 26-28 6.250.000
COLLABORATION MS Office AND EFFECTIVE
32 3 02-04 21-23 21-23 18-20 02-04 04-06 18-20 08-10 19-21 01-03 21-23 17-19 6.250.000
PRESENTATION
PRESENTATION SKILL FOR PUBLIC RELATIONS &
33 2 22-23 22-23 22-23 19-20 21-22 07-08 19-20 20-21 20-21 22-23 22-23 20-21 4.950.000
MARKETING STAFF (USING MICROSOFT POWER POINT)
34 IT AUDIT PRACTICES 3 08-10 21-23 21-23 18-20 07-09 04-06 18-20 01-03 19-21 08-10 21-23 17-19 6.250.000
35 IT HELPDESK 3 17-19 28-02 28-30 25-27 14-16 25-27 25-27 08-10 26-28 17-19 28-30 26-28 6.250.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
ENGINEERING - MINING
1 BATUBARA 3 02-04 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 01-03 05-07 03-05 6.250.000
2 COAL EXPLORATION (EKSPLORASI BATUBARA) 4 08-11 12-15 12-15 09-12 07-10 25-28 09-12 06-09 10-13 08-11 12-15 10-13 7.250.000
3 GEOLOGY FOR NON GEOLOGIST 4 15-18 19-22 19-22 16-19 14-17 05-08 16-19 13-16 17-20 15-18 19-22 17-20 7.250.000
4 PEMBORAN DAN PELEDAKAN UNTUK PERTAMBANGAN 3 22-24 26-28 26-28 23-25 21-23 27-29 23-25 27-29 24-26 22-24 26-28 26-28
6.250.000
5 PEMINDAHAN TANAH MEKANIS 3 29-31 07-09 07-09 04-06 28-30 04-06 04-06 01-03 05-07 29-31 07-09 05-07 6.250.000
6 VENTILASI TAMBANG 3 03-05 12-14 14-16 11-13 02-04 25-27 11-13 08-10 12-14 03-05 14-16 12-14 6.250.000
EVALUASI STUDI KELAYAKAN DALAM USAHA
7 3 10-12 21-23 21-23 18-20 09-11 06-08 18-20 13-15 19-21 10-12 21-23 19-21
PERTAMBANGAN 6.250.000
8 PERENCANAAN TAMBANG TERBUKA 3 17-19 28-02 28-30 25-27 16-18 27-29 25-27 29-31 26-28 17-19 28-30 26-28 6.250.000
9 PEMBORAN EKSPLORASI BATUBARA 3 24-26 05-07 05-07 02-04 23-25 04-06 02-04 30-01 03-05 24-26 05-07 03-05 6.250.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
ENGINEERING - MIGAS
1 GAS PROCESSING AND EQUIPMENT 4 08-11 19-22 19-22 16-19 07-10 04-07 16-19 06-09 17-20 08-11 19-22 17-20 7.250.000
BASIC OF SURFACE OPERATION AND MAINTENANCE FOR
2 4 23-26 20-23 20-23 17-20 29-01 05-08 17-20 13-16 18-21 23-26 20-23 10-13 7.250.000
OIL AND GAS INDUSTRIES
PENGETAHUAN TEKNIK PERMINYAKAN UNTUK
3 4 08-11 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 08-11 06-09 03-06 7.250.000
MANAJERIAL
4 Oil and Gas Measurements 4 08-11 06-09 06-09 03-06 15-18 04-07 03-06 28-31 04-07 08-11 06-09 11-14 7.250.000
5 GAS DEHYDRATION AND GLYCOL REGENERATION 4 30-02 12-15 13-16 10-13 08-11 25-28 10-13 07-10 11-14 30-02 13-16 18-21 7.250.000
GAS SWEETENING H2S AND CO2 REMOVAL IN
6 4 02-05 20-23 20-23 17-20 15-18 05-08 17-20 13-16 18-21 02-05 20-23 03-06
CHEMICAL, OIL AND GAS 7.250.000
GAS HANDLING, CONDITIONING, AND PROCESSING
7 4 15-18 05-08 05-08 02-05 14-17 04-07 02-05 13-16 03-06 15-18 05-08 03-06
FACILITIES 7.250.000
8 OIL AND GAS HANDLING FACILITIES 4 16-19 12-15 13-16 10-13 22-25 25-28 10-13 28-31 11-14 16-19 13-16 18-21 7.250.000
OIL AND GAS PROCESSING PLANT DESIGN AND
9 4 23-26 20-23 20-23 17-20 29-01 05-08 17-20 31-03 18-21 23-26 20-23 03-06
OPERATION 7.250.000
10 Drilling operations for operator in oil and gas industries 4 29-01 05-08 05-08 02-05 07-10 04-07 02-05 06-09 03-06 29-01 05-08 10-13 7.250.000
NATURAL GAS PROCESSING - FRACTINATION AND
11 4 08-11 19-22 19-22 16-19 21-24 05-08 16-19 27-30 17-20 08-11 19-22 03-06 7.250.000
REFREGERATION
PETROLEUM ENGINEERING FOR NON PETROLEUM
12 4 15-18 26-01 26-29 23-26 28-31 26-29 23-26 30-02 24-27 15-18 26-29 11-14 7.250.000
EMPLOYEE
PRACTICAL ASPECT OF ARTIFIAL LIFT METHODS FOR
13 4 30-02 12-15 13-16 10-13 15-18 25-28 10-13 13-16 11-14 30-02 13-16 04-07 7.250.000
PETROLEUM PRODUCTION SYSTEM
14 PRODUCTION LOGGING 4 02-05 20-23 20-23 17-20 22-25 05-08 17-20 28-31 18-21 02-05 20-23 10-13 7.250.000
SUPPLY CHAIN MANAGEMENT IN THE UPSTREAM OIL &
15 3 10-12 28-02 28-30 25-27 02-04 27-29 25-27 01-03 26-28 10-12 28-30 26-28 6.250.000
GAS INDUSTRY
16 WATER FLOODING 4 16-19 05-08 05-08 02-05 29-01 04-07 02-05 06-09 03-06 16-19 05-08 17-20 7.250.000
17 WP&B, AFE and POD 4 23-26 12-15 12-15 09-12 07-10 25-28 09-12 13-16 10-13 23-26 12-15 03-06 7.250.000
18 ARTIFICIAL LIFT 4 29-01 19-22 19-22 16-19 14-17 05-08 16-19 27-30 17-20 29-01 19-22 11-14 7.250.000
OFFSHORE WELLHEAD FUNCTION AND
19 4 02-05 26-01 26-29 23-26 21-24 26-29 23-26 30-02 24-27 01-04 26-29 18-21 7.250.000
TROUBLESHOOTING
20 Advanced Oil and Gas Production System 3 29-31 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 29-31 26-28 26-28 6.250.000
BASIC DRILLING ENGINEERING AND HEALTH, SAFETY &
21 3 02-04 05-07 05-07 02-04 02-04 04-06 02-04 06-08 03-05 01-03 05-07 26-28 6.250.000
ENVIRONMENTAL CONSIDERATION
22 Basic Petroleum Engineering 3 08-10 12-14 12-14 09-11 02-04 27-29 09-11 13-15 10-12 08-10 12-14 26-28 6.250.000
23 Basic Reservoir Engineering for Non Petroleum Engineer 3 15-17 19-21 19-21 16-18 14-16 06-08 16-18 27-29 17-19 15-17 19-21 17-19 6.250.000
ELECTRIC SUBMERSIBLE PUMP PRINCIPLES,
24 INSTALLATION, OPERATION, MAINTENANCE AND 3 31-02 07-09 07-09 04-06 28-30 04-06 04-06 08-10 05-07 31-02 07-09 03-05 6.250.000
TROUBLESHOOTING
25 FORMATION DAMAGE AND WELL STIMULATION 3 03-05 13-15 14-16 11-13 02-04 27-29 11-13 14-16 12-14 03-05 14-16 10-12 6.250.000
NATURAL GAS RESERVOIR, PROCESSING AND
26 3 10-12 21-23 21-23 18-20 07-09 06-08 18-20 29-31 19-21 10-12 21-23 19-21 6.250.000
ECONOMICS ASPECTS
27 Oil & Gas Production System 3 17-19 26-28 26-28 23-25 16-18 25-27 23-25 30-01 24-26 17-19 26-28 26-28 6.250.000
28 OIL & GAS MEASUREMENT AND CALCULATION 3 24-26 05-07 05-07 02-04 23-25 04-06 02-04 06-08 03-05 24-26 05-07 05-07 6.250.000
29 OIL AND GAS HANDLING FACILITIES 3 29-31 12-14 12-14 09-11 30-01 27-29 09-11 13-15 10-12 29-31 12-14 12-14 6.250.000
OIL AND GAS WELLS STIMULATION BY ACIDIZING AND 6.250.000
30 3 02-04 19-21 19-21 16-18 02-04 06-08 16-18 27-29 17-19 01-03 19-21 17-19
HYDRAULIC FRACTURING
Oil Field, and 100 Methods to Maintain and Increase 6.250.000
31 3 08-10 28-02 28-30 25-27 09-11 25-27 25-27 01-03 26-28 08-10 28-30 26-28
Production
PETROLEUM ENGINEERING FOR NON PETROLEUM 6.250.000
32 3 15-17 07-09 07-09 04-06 14-16 04-06 04-06 08-10 05-07 15-17 07-09 03-05
ENGINEERS
PRODUCTION DOWNHOLE AND SUBSURFACE
33 3 22-24 13-15 14-16 11-13 21-23 27-29 11-13 14-16 12-14 22-24 14-16 10-12 6.250.000
EQUIPMENTS
PRODUCTION OPERATION MANAGEMENT FOR 6.250.000
34 3 31-02 21-23 21-23 18-20 28-30 06-08 18-20 29-31 19-21 31-02 21-23 19-21
MANAGERS
Pump Selection, Design and Operation for Oil and Gas 6.250.000
35 3 03-05 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 03-05 26-28 26-28
Surface Production Facilities
SUCKER ROD PUMP DESIGN, OPERATION AND
36 3 10-12 05-07 05-07 02-04 07-09 04-06 02-04 06-08 03-05 10-12 05-07 05-07 6.250.000
TROUBLESHOOTING
37 Surface Production Operation and Equipments 3 17-19 12-14 12-14 09-11 16-18 27-29 09-11 13-15 10-12 17-19 12-14 12-14 6.250.000
38 WELL COMPLETION AND WORK OVER 3 24-26 19-21 19-21 16-18 23-25 06-08 16-18 27-29 17-19 24-26 19-21 17-19 6.250.000
39 BLOWOUT PREVENTION AND WELL CONTROL 3 29-31 28-02 28-30 25-27 30-01 25-27 25-27 01-03 26-28 29-31 28-30 26-28 6.250.000
40 ARUS MINYAK KORPORATE 3 02-04 07-09 07-09 04-06 02-04 04-06 04-06 08-10 05-07 01-03 07-09 03-05 6.250.000
MODERN HYDROCARBON WELL PRODUCTION LOGGING
41 3 08-10 13-15 14-16 11-13 09-11 27-29 11-13 14-16 12-14 08-10 14-16 10-12 6.250.000
DATA ANALYSIS AND INTERPRETATION
OIL SPILL - OIL BOOM AND ENVIRONMENTAL
42 4 23-26 12-15 12-15 09-12 07-10 25-28 09-12 06-09 10-13 23-26 12-15 04-07 7.250.000
MANAGEMENT
43 BASIC SURFACE SAFETY SYSTEM 3 22-24 28-02 28-30 25-27 21-23 25-27 25-27 01-03 26-28 22-24 28-30 26-28 6.250.000
PETROLEUM FINANCE, COST CONTROL & RESERVOIR
44 4 22-25 06-09 06-09 03-06 08-11 04-07 03-06 07-10 04-07 22-25 06-09 18-21 7.250.000
MANAJEMEN (Petroleum Economics)
45 Gas, Oil and Water Pipeline Design and Maintenance 4 09-12 27-02 27-30 24-27 22-25 26-29 24-27 28-31 25-28 09-12 27-30 10-13 7.250.000
PETROLEUM PLANT & PIPELINE SECURITY
46 3 15-17 26-28 26-28 23-25 14-16 25-27 23-25 30-01 24-26 15-17 26-28 26-28 7.250.000
MANAGEMENT
PEMBANGKITAN ALIRAN PERMUKAAN UNTUK OIL SPILL
47 4 29-01 27-02 27-30 24-27 08-11 25-28 24-27 13-16 25-28 29-01 27-30 11-14 7.250.000
(OIL FENCE) SEBAGAI PENGUMPUL TUMPAHAN MINYAK
48 Oil Transportation Piping 4 16-19 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 16-19 12-15 11-14 7.250.000
49 GAS DISPERSION ANALYSIS 3 08-10 19-21 19-21 16-18 02-04 04-06 16-18 27-29 17-19 08-10 19-21 26-28 6.250.000
50 H2S AWARENESS 3 02-04 12-14 14-16 11-13 02-04 25-27 11-13 29-31 12-14 01-03 14-16 26-28 6.250.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
HSE
1 MANAJEMEN LINGKUNGAN 4 08-11 12-15 12-15 09-12 14-17 25-28 09-12 13-16 10-13 08-11 12-15 17-20 7.250.000
2 AHLI HIGIENE INDUSTRI MADYA (HIMA) 5 15-19 26-02 26-30 23-27 14-18 25-29 23-27 27-31 24-28 15-19 26-30 03-07 8.950.000
AMDAL ( ENVIRONMENTAL AND SOCIAL IMPACT
3 4 22-25 05-08 05-08 02-05 21-24 04-07 02-05 13-16 03-06 22-25 05-08 10-13 7.250.000
ASSESSMENT) FOR EXECUTIVE
4 APPLIED ERGONOMICS AT WORKPLACE 4 29-01 12-15 12-15 09-12 28-31 25-28 09-12 30-02 10-13 29-01 12-15 17-20 7.250.000
5 AUTHORISED GAS TESTING 4 02-05 19-22 19-22 16-19 07-10 05-08 16-19 06-09 17-20 01-04 19-22 03-06 7.250.000
6 BASIC SAFETY ORIENTATION FOR CONTRACTORS 5 08-12 26-02 26-30 23-27 14-18 25-29 23-27 27-31 24-28 08-12 26-30 10-14 9.250.000
7 CANTEEN HYGIENE 2 15-16 08-09 08-09 05-06 02-03 04-05 05-06 20-21 06-07 15-16 08-09 26-27 4.950.000
8 CONTRACTOR SAFETY MANAGEMENT SYSTEM (CSMS) 4 23-26 12-15 13-16 10-13 22-25 25-28 10-13 13-16 11-14 23-26 13-16 18-21 7.250.000
9 ELECTRICAL SAFETY 3 31-02 21-23 21-23 18-20 30-01 06-08 18-20 01-03 19-21 31-02 21-23 26-28 6.250.000
10 HAZARD AND OPERABILITY STUDIES (HAZOPS) 3 02-04 26-28 26-28 23-25 02-04 27-29 23-25 08-10 24-26 03-05 26-28 26-28 7.250.000
11 HEALTH IMPACT ASSESSMENT (HIA) 4 08-11 05-08 05-08 02-05 08-11 04-07 02-05 13-16 03-06 08-11 05-08 04-07 7.250.000
INCIDENT INVESTIGATION, PREVENTION AND PROACTIVE
12 3 17-19 12-14 12-14 09-11 14-16 25-27 09-11 27-29 10-12 17-19 12-14 10-12 6.250.000
IMPROVEMENT
13 JOB SAFETY ANALYSIS (JSA) 2 22-23 19-20 19-20 16-17 21-22 07-08 16-17 20-21 17-18 22-23 19-20 17-18 4.950.000
14 K3 RUMAH SAKIT 2 29-30 01-02 29-30 26-27 28-29 28-29 26-27 20-21 27-28 29-30 29-30 26-27 4.950.000
15 LOCKOUT TAGOUT (LOTO) 2 04-05 08-09 08-09 05-06 02-03 04-05 05-06 20-21 06-07 01-02 08-09 03-04 4.950.000
16 MANAGING SAFE WORK 4 09-12 12-15 13-16 10-13 07-10 25-28 10-13 30-02 11-14 09-12 13-16 11-14 7.250.000
17 MATERIAL SAFETY DATA SHEETS (MSDS) 2 15-16 21-22 21-22 18-19 17-18 06-07 18-19 20-21 19-20 15-16 21-22 19-20 4.950.000
18 MODERN SAFETY MANAGEMENT (MSM) 4 23-26 26-01 26-29 23-26 22-25 26-29 23-26 06-09 24-27 23-26 26-29 04-07 7.250.000
19 OHSAS 180012007 AUDITOR 5 29-02 05-09 05-09 02-06 28-01 04-08 02-06 27-31 03-07 29-02 05-09 10-14 9.250.000
20 OVERVIEW OF PROCESS SAFETY MANAGEMENT 2 02-03 12-13 12-13 09-10 03-04 25-26 09-10 20-21 10-11 03-04 12-13 27-28 4.950.000
PANITIA PEMBINA KESELAMATAN DAN KESEHATAN
21 4 08-11 20-23 20-23 17-20 08-11 04-07 17-20 13-16 18-21 08-11 20-23 18-21 7.250.000
KERJA (P2K3)
PENERAPAN PENGENDALIAN BISING TERPADU DI
22 3 17-19 28-02 28-30 25-27 14-16 27-29 25-27 01-03 26-28 17-19 28-30 26-28 6.250.000
TEMPAT KERJA
23 PENGELOLAAN BAHAN KIMIA BERBAHAYA 3 22-24 05-07 05-07 02-04 21-23 06-08 02-04 08-10 03-05 22-24 05-07 03-05 6.250.000
PERLINDUNGAN LINGKUNGAN DAN PENGELOLAAN
24 4 29-01 12-15 13-16 10-13 28-31 25-28 10-13 13-16 11-14 29-01 13-16 10-13 7.250.000
LIMBAH B3
25 PERMIT TO WORK (PTW) 2 04-05 19-20 19-20 16-17 02-03 04-05 16-17 20-21 17-18 04-05 19-20 17-18 4.950.000
26 Process Hazard Analysis (PHA) 3 10-12 26-28 26-28 23-25 07-09 27-29 23-25 27-29 24-26 10-12 26-28 26-28 6.250.000
27 Process Hazard Analysis (PHA) for Facilitator 4 15-18 06-09 06-09 03-06 15-18 05-08 03-06 30-02 04-07 15-18 06-09 04-07 7.250.000
28 Process Safety Management 3 24-26 12-14 12-14 09-11 23-25 25-27 09-11 06-08 10-12 24-26 12-14 12-14 6.250.000
29 PROJECT HSE MANAGEMENT 3 31-02 21-23 21-23 18-20 30-01 04-06 18-20 13-15 19-21 31-02 21-23 19-21 6.250.000
RISK ASSESSMENT AND OPTIMAL RISK MANAGEMENT
30 2 02-03 01-02 29-30 26-27 03-04 28-29 26-27 20-21 27-28 01-02 29-30 26-27 4.950.000
BASED ON ISO 31000
31 SAFETY AUDITS AND SITE INSPECTION 3 08-10 05-07 05-07 02-04 09-11 06-08 02-04 29-31 03-05 08-10 05-07 03-05 7.250.000
32 SAFETY OFFICER DEVELOPMENT PROGRAM 5 15-19 19-23 12-16 09-13 14-18 25-29 09-13 30-03 10-14 15-19 12-16 10-14 9.250.000
33 SAFETY TRAINING FOR THE LABORATORY 3 22-24 13-15 19-21 16-18 21-23 04-06 16-18 08-10 17-19 22-24 19-21 17-19 6.250.000
34 SELF CONTAINED BREATHING APPARATUS(SCBA) 1 29-29 26-26 26-26 23-23 28-28 25-25 23-23 20-20 24-24 29-29 26-26 28-28 2.950.000
35 THE FUNDAMENTAL OF INDUSTRIAL HYGIENE 5 08-12 05-09 05-09 02-06 07-11 04-08 02-06 27-31 03-07 01-05 05-09 03-07 9.250.000
36 WORKING AT HEIGHT 2 15-16 19-20 22-23 19-20 14-15 04-05 19-20 20-21 20-21 15-16 22-23 20-21 4.950.000
37 PENERAPAN HACCP 4 23-26 27-02 27-30 24-27 22-25 26-29 24-27 13-16 25-28 23-26 27-30 03-06 7.250.000
IDENTIFIKASI BAHAYA, PENILAIAN, PENGENDALIAN
38 RESIKO (HIRAC) DAN ANALISA BAHAYA DI PEKERJAAN 5 29-02 05-09 05-09 02-06 28-01 04-08 02-06 30-03 03-07 29-02 05-09 10-14 6.250.000
(JSA)
39 Pengelolaan K3 di Pergudangan 4 16-19 26-01 26-29 23-26 15-18 26-29 23-26 27-30 24-27 16-19 26-29 04-07 6.250.000
40 Supervisor SMK3 Kontraktor 3 29-31 12-14 12-14 09-11 28-30 25-27 09-11 08-10 10-12 29-31 12-14 26-28 7.250.000
41 PENERAPAN BEHAVIOR BASED SAFETY 3 02-04 19-21 21-23 18-20 02-04 04-06 18-20 14-16 19-21 03-05 21-23 19-21 6.250.000
42 PENGELOLAAN B3 DAN LIMBAH B3 4 09-12 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 09-12 27-30 03-06 6.250.000
43 FIRE ALARMS & PROTECTION 4 29-01 20-23 20-23 17-20 29-01 05-08 17-20 13-16 18-21 29-01 20-23 18-21 7.250.000
44 HAZARDOUS MATERIAL HANDLING 4 30-02 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 30-02 26-29 11-14 7.250.000
45 INDUSTRIAL POLLUTION CONTROL 4 15-18 20-23 20-23 17-20 29-01 05-08 17-20 13-16 18-21 15-18 20-23 10-13 7.250.000
46 JOB SAFETY ANALYSIS TRAINING 4 29-01 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 29-01 05-08 03-06 7.250.000
LINGKUNGAN KERJA YANG BERSIH DAN AMAN PADA
47 4 02-05 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 01-04 12-15 11-14 7.250.000
INDUSTRI KIMIA
48 Water Treatment 4 22-25 12-15 13-16 10-13 22-25 25-28 10-13 07-10 11-14 22-25 13-16 17-20 7.250.000
AMDAL ( ENVIRONMENTAL AND SOCIAL IMPACT
49 4 22-25 19-22 19-22 16-19 28-31 04-07 16-19 13-16 17-20 22-25 19-22 10-13 7.250.000
ASSESSMENT) FOR EXECUTIVE
50 HUMAN RELIABILITY ASSESSMENT & ANALYSIS 4 22-25 05-08 05-08 02-05 21-24 04-07 02-05 27-30 03-06 22-25 05-08 17-20 7.250.000
51 SYSTEM SAFETY ENGINEERING AND MANAGEMENT 4 02-05 19-22 19-22 16-19 07-10 05-08 16-19 06-09 17-20 01-04 19-22 10-13 7.250.000
52 BEHAVIOR BASED SAFETY (BBS) 3 08-10 26-28 26-28 23-25 07-09 25-27 23-25 27-29 24-26 08-10 26-28 26-28 6.250.000
53 HAZARD AND OPERABILITY STUDY ( HAZOPS ) 4 15-18 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 15-18 05-08 03-06 7.250.000
54 HAZARDOUS MATERIALS SAFE HANDLING 4 22-25 12-15 12-15 09-12 21-24 26-29 09-12 06-09 10-13 22-25 12-15 10-13 7.250.000
HEALTH, SAFETY & ENVIRONMENT (HSE) ASPECTS IN
55 4 29-01 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 29-01 19-22 17-20 7.250.000
LOGISTICS ACTIVITIES
56 Hot Works 3 02-04 28-02 28-30 25-27 02-04 25-27 25-27 29-31 26-28 01-03 28-30 26-28 6.250.000
57 HSE MANAGEMENT SYSTEM 4 09-12 06-09 06-09 03-06 08-11 04-07 03-06 31-03 04-07 09-12 06-09 04-07 7.250.000
58 HSE WORK PRACTICES AT CONFINED SPACE 3 17-19 12-14 14-16 11-13 16-18 27-29 11-13 08-10 12-14 17-19 14-16 12-14 6.250.000
JOB SAFETY ANALYSIS (JSA) ANALISA KESELAMATAN
59 3 24-26 21-23 21-23 18-20 23-25 06-08 18-20 13-15 19-21 24-26 21-23 19-21 6.250.000
PEKERJAAN
60 MANAGING CONTRACTOR SAFETY 3 31-02 26-28 26-28 23-25 30-01 25-27 23-25 27-29 24-26 31-02 26-28 26-28 6.250.000
61 MODERN SAFETY AND LOSS CONTROL MANAGEMENT 4 02-05 05-08 05-08 02-05 07-10 04-07 02-05 30-02 03-06 02-05 05-08 03-06 7.250.000
OCCUPATIONAL HEALTH, SAFETY AND ENVIRONMENT
62 5 08-12 19-23 12-16 09-13 14-18 25-29 09-13 06-10 10-14 08-12 12-16 10-14 9.250.000
(HSE) AUDITING
Occupational Health, Safety and Environment (HSE) on
63 4 15-18 12-15 19-22 16-19 21-24 05-08 16-19 13-16 17-20 15-18 19-22 17-20 7.250.000
Paper and Pulp Industry
ONSHORE DRILLING SAFETY OPERATIONS HSE ASPECTS
64 4 22-25 27-02 27-30 24-27 28-31 25-28 24-27 28-31 25-28 22-25 27-30 04-07 7.250.000
IN ONSHORE DRILLING OPERATIONS
ONSHORE DRILLING SAFETY OPERATIONS HSE ASPECTS
65 IN ONSHORE DRILLING OPERATIONS FOR MANAGERS 3 29-31 07-09 07-09 04-06 02-04 04-06 04-06 01-03 05-07 29-31 07-09 26-28 6.250.000
AND SUPERINTENDENTS
PENCEGAHAN DAN PENANGGULANGAN KEBAKARAN
66 3 02-04 12-14 12-14 09-11 02-04 27-29 09-11 06-08 10-12 01-03 12-14 10-12 6.250.000
(FIRE PREVENTION & PROTECTION)
67 PRODUCTION SAFETY SYSTEM 5 08-12 19-23 19-23 16-20 07-11 04-08 16-20 27-31 17-21 08-12 19-23 17-21 6.250.000
68 PROFESSIONAL ACCIDENT INCIDENT INVESTIGATION 3 17-19 26-28 26-28 23-25 14-16 25-27 23-25 13-15 24-26 17-19 26-28 26-28 6.250.000
SAFETY MANAGEMENT FOR SUPERVISORS AND
69 4 23-26 05-08 05-08 02-05 22-25 04-07 02-05 30-02 03-06 23-26 05-08 03-06 7.250.000
MANAGERS
70 TRANSPORTATION SAFETY MANAGEMENT SYSTEM 4 30-02 12-15 13-16 10-13 29-01 26-29 10-13 07-10 11-14 30-02 13-16 11-14 7.250.000
71 WAREHOUSE SAFETY MANAGEMENT 4 02-05 19-22 19-22 16-19 07-10 05-08 16-19 13-16 17-20 02-05 19-22 17-20 7.250.000
72 HIRADC 3 08-10 28-02 28-30 25-27 02-04 25-27 25-27 27-29 26-28 08-10 28-30 26-28 6.250.000
73 PROCESS SAFETY MANAGEMENT 4 15-18 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 15-18 06-09 04-07 7.250.000
74 Chemical Hazard Safety in Mining and Workplace 4 08-11 19-22 19-22 16-19 14-17 05-08 16-19 13-16 17-20 08-11 19-22 17-20 8.750.000
75 HAZARDOUS MATERIAL HANDLING 4 22-25 12-15 12-15 09-12 21-24 25-28 09-12 27-30 10-13 22-25 12-15 10-13 7.250.000
76 HAZID (HAZARD IDENTIFICATON) 4 29-01 19-22 19-22 16-19 28-31 05-08 16-19 30-02 17-20 29-01 19-22 17-20 7.250.000
77 HAZOPS(HAZARD AND OPERABILITY STUDIES) 4 02-05 26-01 26-29 23-26 07-10 26-29 23-26 06-09 24-27 01-04 26-29 04-07 7.250.000
78 WASTE WATER TREATMENT & MANAGEMENT 4 22-25 26-01 26-29 23-26 07-10 26-29 23-26 06-09 24-27 22-25 26-29 18-21 7.250.000
79 Water Treating and Chemicals 4 29-01 06-09 06-09 03-06 15-18 04-07 03-06 13-16 04-07 29-01 06-09 03-06 7.250.000
80 PENGENDALIAN PENCEMARAN AIR 3 08-10 21-23 21-23 18-20 02-04 06-08 18-20 01-03 19-21 08-10 21-23 26-28 6.250.000
81 PENGENDALIAN PENCEMARAN UDARA 3 17-19 28-02 28-30 25-27 02-04 27-29 25-27 08-10 26-28 17-19 28-30 26-28 6.250.000
82 DUKUNGAN TEKNOLOGI BARU DAN MODERN 4 02-05 19-22 19-22 16-19 14-17 04-07 16-19 13-16 17-20 01-04 19-22 10-13 7.250.000
83 ISU PEMENUHAN KUALITAS DAN KEAMANAN PANGAN 4 08-11 26-01 26-29 23-26 21-24 25-28 23-26 27-30 24-27 08-11 26-29 17-20 7.250.000
84 PEMENUHAN PERSYARATAN PERIZINAN 4 15-18 05-08 05-08 02-05 28-31 05-08 02-05 30-02 03-06 15-18 05-08 03-06 7.250.000
85 POTENSI DAN PERKEMBANGAN INDUSTRI PANGAN 4 22-25 12-15 12-15 09-12 07-10 26-29 09-12 06-09 10-13 22-25 12-15 11-14 7.250.000
86 HSE MANAGEMENT SYSTEM INTERNAL AUDITOR 4 02-05 12-15 12-15 09-12 14-17 25-28 09-12 13-16 10-13 01-04 12-15 17-20 6.250.000
87 PRODUCTION SYSTEM SAFETY 4 15-18 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 15-18 05-08 10-13 7.250.000
88 FIT FOR DUTY 2 22-23 19-20 19-20 16-17 02-03 04-05 16-17 20-21 17-18 22-23 19-20 26-27 4.950.000
89 SURVEILANS KESEHATAN PEKERJA 2 29-30 26-27 26-27 23-24 03-04 25-26 23-24 20-21 24-25 29-30 26-27 27-28 4.950.000
90 APLIKASI PROGRAM PERLINDUNGAN PERNAFASAN 2 02-03 05-06 05-06 02-03 02-03 06-07 02-03 20-21 03-04 01-02 05-06 26-27 4.500.000
91 FOOD HYGIENE SANITATION AND MONITORING 2 08-09 12-13 12-13 09-10 03-04 27-28 09-10 20-21 10-11 08-09 12-13 27-28 4.500.000
92 HEARING CONSERVATION PROGRAM 2 15-16 21-22 21-22 18-19 02-03 07-08 18-19 20-21 19-20 15-16 21-22 26-27 4.500.000
93 MENGELOLA KESEHATAN DI TEMPAT KERJA 2 24-25 28-01 28-29 25-26 03-04 28-29 25-26 20-21 26-27 24-25 28-29 27-28 4.500.000
94 Higiene Sanitasi Makanan Berbasis HACCP 2 31-01 07-08 07-08 04-05 02-03 04-05 04-05 20-21 05-06 31-01 07-08 26-27 4.500.000
CATERING SERVICE, HYGIENE & SANITATION (INCLUDING
95 3 08-10 19-21 19-21 16-18 02-04 04-06 16-18 13-15 17-19 08-10 19-21 26-28 6.250.000
PERSONAL HYGIENE)
Penerapan Hazard Analysis Critical Control Point
96 3 02-04 21-23 21-23 18-20 02-04 04-06 18-20 14-16 19-21 03-05 21-23 26-28 7.250.000
(HACCP) pada Pengelolaan Makanan
97 BEHAVIOR BASED SAFETY 2 15-16 19-20 19-20 16-17 02-03 04-05 16-17 20-21 17-18 15-16 19-20 17-18 4.500.000
98 CSMS AWARENESS 2 22-23 26-27 26-27 23-24 21-22 25-26 23-24 20-21 24-25 22-23 26-27 26-27 4.500.000
99 HSE LEADERSHIP 2 29-30 05-06 05-06 02-03 28-29 06-07 02-03 20-21 03-04 29-30 05-06 03-04 4.500.000
100 INCIDENT INVESTIGATION 3 02-04 12-14 12-14 09-11 02-04 27-29 09-11 30-01 10-12 01-03 12-14 10-12 6.250.000
101 AMDAL (ENVIRONMENTAL IMPACT ASSESMENT) FOR 3 29-31 19-21 19-21 16-18 02-04 04-06 16-18 13-15 17-19 29-31 19-21 26-28 6.250.000
EXECUTIVES
102 EMERGENCY PREPAREDNESS 3 02-04 26-28 26-28 23-25 02-04 25-27 23-25 27-29 24-26 01-03 26-28 26-28 6.250.000
103 ENVIRONMENTAL LEGISLATION (ANTICIPATING 3 08-10 05-07 05-07 02-04 02-04 06-08 02-04 30-01 03-05 08-10 05-07 26-28 6.250.000
CONFLICS)
104 ENVIRONMENTAL MONITORING KEY TO POLUTION FREE 3 15-17 12-14 12-14 09-11 02-04 27-29 09-11 06-08 10-12 15-17 12-14 26-28 6.250.000
105 HSE AUDIT TECHNIQUES 3 22-24 21-23 21-23 18-20 02-04 04-06 18-20 14-16 19-21 22-24 21-23 26-28 6.250.000
106 OCCUPATIONAL HEALTH, SAFETY AND ENVIRONMENTAL 3 31-02 28-02 28-30 25-27 02-04 25-27 25-27 29-31 26-28 31-02 28-30 26-28 6.250.000
IN THE OIL & GAS INDUSTRY
107 WASTE HANDLING & TREATMENT IN THE OIL & GAS 3 03-05 07-09 07-09 04-06 02-04 06-08 04-06 01-03 05-07 03-05 07-09 26-28 6.250.000
INDUSTRIES
108 INDUSTRIAL HYGIENE (HIGIENE INDUSTRI) 3 08-10 12-14 12-14 09-11 02-04 25-27 09-11 06-08 10-12 08-10 12-14 26-28 6.250.000
109 HANDLING OF DANGEROUS GOODS IN AIR TRANSPORT 3 22-24 26-28 26-28 23-25 02-04 25-27 23-25 27-29 24-26 22-24 26-28 26-28 6.250.000
110 PRODUCTION SAFETY SYSTEM 4 30-02 27-02 27-30 24-27 08-11 26-29 24-27 07-10 25-28 30-02 27-30 10-13 7.250.000
111 SAFETY INSTRUMENTED SYSTEM (SIS) AND CONTROL 4 02-05 05-08 05-08 02-05 14-17 04-07 02-05 13-16 03-06 02-05 05-08 17-20 7.250.000
112 CATERING & ACCOMMODATION MANAGEMENT 4 02-05 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 01-04 12-15 17-20 7.250.000
(INCLUDING TABLE MANNER)
113 WELDING SAFETY 2 04-05 12-13 12-13 09-10 02-03 26-27 09-10 20-21 10-11 11-12 12-13 10-11 4.950.000
114 H2S AWARENESS 3 02-04 12-14 14-16 11-13 02-04 25-27 11-13 29-31 12-14 01-03 14-16 26-28 6.250.000
115 WATER TREATMENT 4 02-05 26-01 26-29 23-26 21-24 26-29 23-26 27-30 24-27 01-04 26-29 18-21 7.250.000
116 GAS DISPERSION ANALYSIS 3 08-10 19-21 19-21 16-18 02-04 04-06 16-18 27-29 17-19 08-10 19-21 26-28 6.250.000
117 OIL SPILL - OIL BOOM AND ENVIRONMENTAL 4 23-26 12-15 12-15 09-12 07-10 25-28 09-12 06-09 10-13 23-26 12-15 04-07 7.250.000
MANAGEMENT
118 BASIC SURFACE SAFETY SYSTEM 3 22-24 28-02 28-30 25-27 21-23 25-27 25-27 01-03 26-28 22-24 28-30 26-28 7.250.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
MANAJEMEN
1 ACCOUNT RECEIVABLE MANAGEMENT 2 29-30 12-13 12-13 09-10 28-29 25-26 09-10 20-21 10-11 29-30 12-13 10-11 4.950.000
2 Accounting Information Systems 3 02-04 19-21 19-21 16-18 02-04 04-06 16-18 06-08 17-19 01-03 19-21 17-19 6.250.000
3 Asset Management 3 08-10 26-28 26-28 23-25 07-09 27-29 23-25 13-15 24-26 08-10 26-28 26-28 6.250.000
BALANCED SCORECARD (BSC) CONCEPT AND
4 2 15-16 05-06 05-06 02-03 14-15 07-08 02-03 20-21 03-04 15-16 05-06 03-04 4.950.000
IMPLEMENTATION
5 BASIC ACCOUNTING 3 22-24 13-15 14-16 11-13 21-23 25-27 11-13 27-29 12-14 22-24 14-16 12-14 6.250.000
6 BASIC AUDIT FINANCE 3 31-02 21-23 21-23 18-20 30-01 04-06 18-20 30-01 19-21 31-02 21-23 19-21 6.250.000
7 BASIC KNOWLEDGE ABOUT FINANCIAL MANAGEMENT 3 03-05 28-02 28-30 25-27 02-04 27-29 25-27 08-10 26-28 03-05 28-30 26-28 6.250.000
8 BUDGET PLANNING, CONTROLLING & ANALYSING 3 10-12 07-09 07-09 04-06 09-11 06-08 04-06 14-16 05-07 10-12 07-09 05-07 6.250.000
9 BUDGETING AND PROJECT COST CONTROL 3 17-19 12-14 12-14 09-11 16-18 25-27 09-11 29-31 10-12 17-19 12-14 10-12 6.250.000
10 BUDGETING AND REPORTING 3 24-26 19-21 19-21 16-18 23-25 04-06 16-18 01-03 17-19 24-26 19-21 17-19 6.250.000
11 CASH MANAGEMENT 2 29-30 26-27 26-27 23-24 28-29 28-29 23-24 20-21 24-25 29-30 26-27 26-27 4.950.000
12 CUSTOMER RELATION MANAGEMENT(CRM) 3 15-17 21-23 21-23 18-20 14-16 04-06 18-20 13-15 19-21 15-17 21-23 19-21 6.250.000
13 Export import 3 10-12 19-21 19-21 16-18 09-11 04-06 16-18 08-10 17-19 10-12 19-21 17-19 6.250.000
14 FINANCE FOR NON FINANCE FOR OIL & GAS INDUSTRY 3 17-19 28-02 28-30 25-27 16-18 25-27 25-27 14-16 26-28 17-19 28-30 26-28 6.250.000
15 FINANCE FOR NON FINANCE MANAGER 3 24-26 07-09 07-09 04-06 23-25 06-08 04-06 29-31 05-07 24-26 07-09 05-07 6.250.000
16 Financial Planning and Budgeting for Banking 3 31-02 13-15 14-16 11-13 30-01 27-29 11-13 01-03 12-14 31-02 14-16 12-14 6.250.000
17 Holistic CSR and Sustainable Community Development 2 02-03 22-23 22-23 19-20 02-03 04-05 19-20 20-21 20-21 04-05 22-23 20-21 4.950.000
18 HR Based On Competency for Recruitment 2 15-16 05-06 05-06 02-03 14-15 06-07 02-03 13-14 03-04 15-16 05-06 03-04 4.950.000
19 INTERMEDIATE ACCOUNTING 3 22-24 12-14 12-14 09-11 21-23 27-29 09-11 27-29 10-12 22-24 12-14 10-12 6.250.000
20 Key Account Management 2 29-30 19-20 19-20 16-17 28-29 07-08 16-17 20-21 17-18 29-30 19-20 17-18 4.950.000
LAPORAN KEUANGAN PEMAHAMAN DAN
21 3 03-05 28-02 28-30 25-27 02-04 25-27 25-27 30-01 26-28 01-03 28-30 26-28 6.250.000
PENGGUNAANNYA
22 Managing Training Function 3 10-12 07-09 07-09 04-06 09-11 04-06 04-06 08-10 05-07 10-12 07-09 05-07 6.250.000
23 OUTSOURCING MANAGEMENT 3 17-19 13-15 14-16 11-13 16-18 27-29 11-13 14-16 12-14 17-19 14-16 12-14 6.250.000
24 PETTY CASH MANAGEMENT & ADMINISTRATION 2 25-26 21-22 21-22 18-19 24-25 07-08 18-19 20-21 19-20 25-26 21-22 19-20 4.950.000
25 PROBLEM SOLVING AND DECISION MAKING 4 02-05 05-08 05-08 02-05 07-10 04-07 02-05 31-03 03-06 02-05 05-08 03-06 7.250.000
PROFIT PLANNING COST - VOLUME - PROFIT
26 3 08-10 12-14 12-14 09-11 02-04 27-29 09-11 06-08 10-12 08-10 12-14 10-12 6.250.000
RELATIONSHIP ANALYSIS
27 Project Cost Estimation & Cost Control 3 15-17 21-23 21-23 18-20 14-16 06-08 18-20 13-15 19-21 15-17 21-23 19-21 6.250.000
28 Standard Operational Procedure, Accounting & Finance 3 22-24 28-02 28-30 25-27 21-23 25-27 25-27 27-29 26-28 22-24 28-30 26-28 6.250.000
29 Total Quality Management 3 10-12 19-21 19-21 16-18 09-11 06-08 16-18 08-10 17-19 10-12 19-21 17-19 6.250.000
30 TRAINING EVALUATION AND MEASUREMENT METHOD 2 18-19 26-27 26-27 23-24 17-18 25-26 23-24 15-16 24-25 18-19 26-27 26-27 4.950.000
31 TRAINING NEED ANALYSIS 2 25-26 05-06 05-06 02-03 24-25 04-05 02-03 20-21 03-04 25-26 05-06 03-04 4.950.000
Training untuk pegawai persiapan masa pensiun
32 5 29-02 19-23 12-16 09-13 28-01 25-29 09-13 27-31 10-14 29-02 12-16 10-14 9.500.000
(training pra-purnabakti)
33 ACCOUNT PAYABLE MANAGEMENT 2 04-05 12-13 22-23 19-20 03-04 06-07 19-20 01-02 20-21 03-04 22-23 20-21 4.950.000
34 COST ACCOUNTING 3 08-10 28-02 28-30 25-27 07-09 25-27 25-27 06-08 26-28 08-10 28-30 26-28 6.250.000
35 FIXED ASSET 3 15-17 07-09 07-09 04-06 14-16 06-08 04-06 13-15 05-07 15-17 07-09 05-07 6.250.000
36 ANALISIS KEEKONOMISAN PROYEK 3 22-24 13-15 12-14 09-11 21-23 27-29 09-11 27-29 10-12 22-24 12-14 10-12 6.250.000
37 SISTEM INFORMASI MANAJEMEN DAN AKUNTANSI 3 29-31 19-21 19-21 16-18 28-30 04-06 16-18 01-03 17-19 29-31 19-21 17-19 6.250.000
38 COST VOLUME PROFIT ANALYSIS 3 02-04 26-28 26-28 23-25 02-04 25-27 23-25 08-10 24-26 03-05 26-28 26-28 6.250.000
INTERNATIONAL FINANCIAL REPORTING STANDARD
39 2 11-12 05-06 05-06 02-03 10-11 07-08 02-03 20-21 03-04 11-12 05-06 03-04 4.950.000
(IFRS)
40 TREASURY AND CASH FLOW MANAGEMENT 2 18-19 12-13 15-16 12-13 17-18 28-29 12-13 15-16 13-14 18-19 15-16 13-14 4.500.000
41 Strategi Menangani Proyek Bermasalah 3 24-26 21-23 21-23 18-20 23-25 04-06 18-20 29-31 19-21 24-26 21-23 19-21 6.250.000
42 ADVANCE SECURITY MANAGEMENT 4 02-05 26-01 26-29 23-26 21-24 25-28 23-26 27-30 24-27 01-04 26-29 03-06 7.250.000
43 ANALISIS BEBAN KERJA 2 29-30 19-20 19-20 16-17 28-29 04-05 16-17 20-21 17-18 29-30 19-20 17-18 4.950.000
44 ANALITYCAL HIERARCHY PROCESS 2 02-03 26-27 26-27 23-24 02-03 25-26 23-24 20-21 24-25 01-02 26-27 26-27 4.950.000
IMPLEMENTASI BALANCED SCORE CARD (BSC) SEBAGAI
45 3 15-17 12-14 12-14 09-11 14-16 27-29 09-11 27-29 10-12 15-17 12-14 10-12 6.250.000
ALAT UKUR PERFORMANSI KARYAWAN
46 KESEIMBANGAN LINTAS PRODUKSI (LINE BALANCING) 2 22-23 21-22 21-22 18-19 21-22 07-08 18-19 20-21 19-20 22-23 21-22 19-20 4.950.000
47 LIFE CYCLE COSTING (WHOLE LIFE COSTING) 2 31-01 28-01 28-29 25-26 30-31 25-26 25-26 20-21 26-27 31-01 28-29 27-28 4.950.000
48 MANAJEMEN KOMPENSASI BERBASIS KINERJA 2 04-05 07-08 07-08 04-05 03-04 04-05 04-05 30-31 05-06 03-04 07-08 05-06 4.950.000
49 MANAJEMEN LOGISTIK 3 10-12 13-15 14-16 11-13 09-11 27-29 11-13 06-08 12-14 10-12 14-16 12-14 6.250.000
50 MANAJEMEN PENGEMBANGAN PRODUK 3 17-19 21-23 21-23 18-20 16-18 06-08 18-20 13-15 19-21 17-19 21-23 19-21 6.250.000
51 MANAJEMEN PERGUDANGAN DAN PERSEDIAAN 2 24-25 01-02 29-30 26-27 23-24 25-26 26-27 20-21 27-28 24-25 29-30 26-27 4.950.000
52 MANAJEMEN PROYEK 3 31-02 07-09 07-09 04-06 30-01 04-06 04-06 29-31 05-07 31-02 07-09 05-07 6.250.000
53 OPERATION MANAGEMENT 2 02-03 12-13 12-13 09-10 02-03 27-28 09-10 01-02 10-11 04-05 12-13 10-11 4.950.000
54 PEMILIHAN PEMASOK (VENDOR) 2 08-09 19-20 19-20 16-17 07-08 07-08 16-17 09-10 17-18 08-09 19-20 17-18 4.950.000
55 STANDARD OPERATING PROCEDURE 2 25-26 05-06 05-06 02-03 24-25 04-05 02-03 20-21 03-04 25-26 05-06 03-04 4.950.000
56 STUDI KELAYAKAN PROYEK 2 29-30 14-15 14-15 11-12 28-29 25-26 11-12 27-28 12-13 29-30 14-15 12-13 4.950.000
TANGGUNG JAWAB SOSIAL PERUSAHAAN (CORPORATE
57 2 04-05 21-22 21-22 18-19 03-04 06-07 18-19 02-03 19-20 01-02 21-22 19-20 4.950.000
SOCIAL RESPONSIBILITY)
58 VALUE ENGINEERING (REKAYASA NILAI) 2 10-11 28-01 28-29 25-26 09-10 27-28 25-26 06-07 26-27 10-11 28-29 26-27 4.950.000
59 Sistem Informasi manajemen Pergudangan 2 17-18 07-08 07-08 04-05 16-17 07-08 04-05 13-14 05-06 17-18 07-08 05-06 4.950.000
60 Sistem Life Cycle Costing 2 22-23 12-13 15-16 12-13 21-22 28-29 12-13 20-21 13-14 22-23 15-16 13-14 4,950,000
61 ANALISIS KEPUTUSAN 2 31-01 22-23 22-23 19-20 30-31 04-05 19-20 29-30 20-21 31-01 22-23 20-21 4.950.000
62 MANAJEMEN PRODUKSI 2 02-03 01-02 29-30 26-27 02-03 25-26 26-27 30-31 27-28 03-04 29-30 27-28 4.950.000
63 METODE PENGAMBILAN KEPUTUSAN 2 11-12 08-09 08-09 05-06 10-11 06-07 05-06 08-09 06-07 11-12 08-09 06-07 4.950.000
64 BUSINESS PROCESS REENGINEERING 2 02-03 26-27 26-27 23-24 03-04 25-26 23-24 20-21 24-25 01-02 26-27 27-28 4.950.000
LOGISTICS AND SUPPLY CHAIN MANAGEMENT CONCEPT,
65 4 15-18 12-15 12-15 09-12 14-17 26-29 09-12 27-30 10-13 15-18 12-15 17-20 6.250.000
STRATEGY AND IMPLEMENTATION
66 MANAJEMEN STRATEGI 3 22-24 21-23 21-23 18-20 21-23 06-08 18-20 30-01 19-21 22-24 21-23 26-28 6.250.000
67 PRACTICAL PROJECT EVALUATION AND FINANCING 2 31-01 28-01 28-29 25-26 28-29 25-26 25-26 20-21 26-27 31-01 28-29 26-27 4.950.000
PROJECT MANAGEMENT WITH MICROSOFT PROJECT
68 3 03-05 07-09 07-09 04-06 02-04 04-06 04-06 06-08 05-07 03-05 07-09 03-05 6.250.000
APPLICATION,Win QSB & MONTE CARLO SIMULATION
69 RISK-BASED MANAGEMENT 3 10-12 12-14 14-16 11-13 07-09 27-29 11-13 13-15 12-14 10-12 14-16 10-12 6.250.000
70 STRATEGI PENGEMBANGAN BISNIS 3 17-19 19-21 19-21 16-18 16-18 06-08 16-18 29-31 17-19 17-19 19-21 19-21 6.250.000
71 SUPPLY CHAIN MANAGEMENT 3 24-26 28-02 28-30 25-27 23-25 25-27 25-27 01-03 26-28 24-26 28-30 26-28 6.250.000
72 LOGISTIC AND SUPPLY CHAIN MANAGEMENT 4 08-11 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 08-11 19-22 17-20 6.250.000
73 PROJECT MANAGEMENT 4 02-05 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 02-05 20-23 04-07 6.250.000
74 ACCOUNT OfficeR 3 15-17 05-07 05-07 02-04 02-04 04-06 02-04 06-08 03-05 15-17 05-07 26-28 6.250.000
75 AUDITING SDM 3 29-31 19-21 19-21 16-18 28-30 06-08 16-18 27-29 17-19 29-31 19-21 17-19 6.250.000
76 BUSINESS STRATEGY FOR MANAGERS 3 08-10 07-09 07-09 04-06 07-09 04-06 04-06 08-10 05-07 08-10 07-09 03-05 6.250.000
77 COSTUMER SERVICE(CS) 3 31-02 28-02 28-30 25-27 30-01 27-29 25-27 01-03 26-28 31-02 28-30 26-28 6.250.000
78 KEPEMIMPINAN (LEADERSHIP HIGH LEVEL MANAGER) 5 15-19 19-23 19-23 16-20 14-18 04-08 16-20 27-31 17-21 15-19 19-23 17-21 8.950.000
KEPEMIMPINAN (LEADERSHIP LOWER LEVEL
79 3 22-24 26-28 26-28 23-25 23-25 27-29 23-25 30-01 24-26 22-24 26-28 26-28 6.250.000
MANAGER)
KEPEMIMPINAN (LEADERSHIP MIDDLE LEVEL
80 4 29-01 06-09 06-09 03-06 28-31 04-07 03-06 07-10 04-07 29-01 06-09 03-06 7.250.000
MANAGER)
81 KEWIRANIAGAAN (SALESMANSHIP) 3 02-04 13-15 14-16 11-13 02-04 25-27 11-13 14-16 12-14 01-03 14-16 10-12 6.250.000
82 MANAJEMEN PERUBAHAN (CHANGE MANAGEMENT) 3 08-10 19-21 19-21 16-18 07-09 06-08 16-18 27-29 17-19 08-10 19-21 17-19 6.250.000
83 MANAJEMEN SDM (PERSONALIA ATAU TENAGA KERJA) 3 15-17 28-02 28-30 25-27 14-16 27-29 25-27 01-03 26-28 15-17 28-30 26-28 6.250.000
MANAJEMEN PERILAKU DALAM
84 ORGANISASI(MANAGEMENT OF ORGANIZATION 3 24-26 05-07 05-07 02-04 21-23 04-06 02-04 06-08 03-05 24-26 05-07 05-07 6.250.000
BEHAVIOR)
85 MANAJEMEN STRATEGI 3 31-02 12-14 12-14 09-11 30-01 25-27 09-11 13-15 10-12 31-02 12-14 12-14 6.250.000
86 MANUSIA DALAM KERJA (MEN IN WORK) 2 04-05 22-23 22-23 19-20 02-03 07-08 19-20 20-21 20-21 04-05 22-23 20-21 4.950.000
MENINGKATKAN EFEKTIVITAS FUNGSI
87 3 10-12 26-28 26-28 23-25 09-11 27-29 23-25 29-31 24-26 10-12 26-28 26-28 6.250.000
SUPERVISOR(SUPERVISORY MANAGEMENT)
PENGANTAR KONSEP MANAJEMEN(INTRODUCTION TO
88 2 18-19 08-09 08-09 05-06 17-18 04-05 05-06 20-21 06-07 18-19 08-09 03-04 4.950.000
MANAGEMENT)
89 RAPAT YANG PRODUKTIF (PRODUCTIVE MEETING) 2 08-09 05-06 05-06 02-03 07-08 04-05 02-03 20-21 03-04 08-09 05-06 05-06 4.950.000
90 TEAM DEVELOPMENT 3 03-05 07-09 07-09 04-06 02-04 04-06 04-06 06-08 05-07 03-05 07-09 05-07 6.250.000
91 TEKNIK NEGOSIASI 3 10-12 13-15 14-16 11-13 09-11 25-27 11-13 13-15 12-14 10-12 14-16 10-12 6.250.000
92 CUSTOMER SERVICE EXCELLENCE STRATEGY 4 22-25 06-09 06-09 03-06 21-24 04-07 03-06 31-03 04-07 22-25 06-09 04-07 7.250.000
93 GOOD CORPORATE GOVERNANCE 3 17-19 05-07 05-07 02-04 16-18 04-06 02-04 30-01 03-05 17-19 05-07 03-05 6.250.000
94 HOW TO IMPROVE BUSINESS PERFORMANCE 3 24-26 12-14 14-16 11-13 23-25 27-29 11-13 08-10 12-14 24-26 14-16 12-14 6.250.000
95 KEMADYAAN 5 08-12 26-02 26-30 23-27 07-11 25-29 23-27 27-31 24-28 01-05 26-30 03-07 8.250.000
96 MANAGEMENT PROJECT STRATEGI DAN IMPLEMENTASI 3 02-04 07-09 07-09 04-06 02-04 04-06 04-06 01-03 05-07 08-10 07-09 26-28 6.250.000
97 MANAJEMEN OPERASI – PRODUKSI 3 15-17 13-15 12-14 09-11 14-16 25-27 09-11 06-08 10-12 15-17 12-14 10-12 6.250.000
98 PERFORMANCE MANAGEMENT 3 22-24 19-21 21-23 18-20 21-23 06-08 18-20 14-16 19-21 22-24 21-23 19-21 6.250.000
99 SIX SIGMA CHAMPIONS 3 31-02 26-28 26-28 23-25 30-01 27-29 23-25 27-29 24-26 31-02 26-28 26-28 6.250.000
100 HANDLING CUSTOMER COMPLAINT 2 08-09 12-13 15-16 12-13 07-08 25-26 12-13 20-21 13-14 11-12 15-16 13-14 4.950.000
101 PELAYANAN PRIMA BAGI APARATUR PEMERINTAHAN 3 17-19 21-23 19-21 16-18 16-18 06-08 16-18 08-10 17-19 17-19 19-21 17-19 6.250.000
102 MARKETING MANAGEMENT 3 29-31 07-09 07-09 04-06 28-30 04-06 04-06 29-31 05-07 29-31 07-09 05-07 6.250.000
103 MANAJEMEN PERPUSTAKAAN 3 02-04 13-15 12-14 09-11 02-04 25-27 09-11 01-03 10-12 03-05 12-14 10-12 6.250.000
104 Pengendalian Dokumen ISO 9001 2015 4 02-05 12-15 13-16 10-13 07-10 25-28 10-13 06-09 11-14 01-04 13-16 17-20 7.250.000
105 Pemahaman Integrasi Sistem Manajemen ISO 14001- 3 08-10 21-23 19-21 16-18 02-04 04-06 16-18 13-15 17-19 08-10 19-21 26-28 6.250.000
2015, ISO 9001-2015, dan ISO 45001-2016
106 Pengendalian Dokumen Integrasi ISO 4 22-25 05-08 05-08 02-05 21-24 05-08 02-05 30-02 03-06 22-25 05-08 10-13 7.250.000
107 COST CONTROL AND ESTIMATING 4 30-02 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 30-02 12-15 04-07 7.250.000
108 FEASIBILITY STUDY & PROJECT EVALUATION 4 22-25 12-15 13-16 10-13 22-25 25-28 10-13 07-10 11-14 22-25 13-16 11-14 7.250.000
109 MATERIAL MANAGEMENT 4 02-05 20-23 20-23 17-20 29-01 05-08 17-20 13-16 18-21 02-05 20-23 03-06 7.250.000
110 Office MANAGEMENT AND FILING SYSTEM 4 22-25 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 22-25 12-15 04-07 7.250.000
111 Akuntansi Perpajakan pada Badan Usaha Milik Negara 3 08-10 05-07 05-07 02-04 02-04 04-06 02-04 27-29 03-05 08-10 05-07 26-28 6.250.000
(BUMN)
112 Fraud Prevention, Detection And Investigation Audit 3 15-17 12-14 12-14 09-11 14-16 25-27 09-11 30-01 10-12 15-17 12-14 26-28 6.250.000
113 General Affairs Management 3 22-24 19-21 19-21 16-18 21-23 06-08 16-18 06-08 17-19 22-24 19-21 17-19 6.250.000
114 Hubungan Industrial Dan Tenaga Kerja 3 29-31 26-28 26-28 23-25 28-30 27-29 23-25 13-15 24-26 29-31 26-28 26-28 6.250.000
115 ISO 26000 UNDERSTANDING AND IMPLEMENTING CSR 3 02-04 07-09 07-09 04-06 02-04 04-06 04-06 29-31 05-07 01-03 07-09 03-05 6.250.000
116 Legal Due Diligence (LC Perdagangan) 3 10-12 13-15 14-16 11-13 07-09 25-27 11-13 01-03 12-14 10-12 14-16 10-12 6.250.000
117 Keterampilan Pengelolaan Hubungan Industrial Sampai 3 17-19 21-23 21-23 18-20 16-18 06-08 18-20 08-10 19-21 17-19 21-23 19-21 6.250.000
Dengan Penyelesaian Perselisihan
118 Merger Dan Akuisisi 2 25-26 01-02 29-30 26-27 24-25 28-29 26-27 20-21 27-28 25-26 29-30 26-27 4.950.000
119 Pengendalian Kinerja Bisnis Dan Aliran Kas 3 31-02 05-07 05-07 02-04 30-01 04-06 02-04 14-16 03-05 31-02 05-07 05-07 6.250.000
120 QA & QC Inspection Program 3 08-10 21-23 21-23 18-20 02-04 04-06 18-20 29-31 19-21 08-10 21-23 26-28 6.250.000
121 CONTEMPORARY LEADERSHIP 3 29-31 19-21 19-21 16-18 28-30 06-08 16-18 27-29 17-19 29-31 19-21 26-28 6.250.000
122 CUSTOMER SERVICE IN CREDIT UNION 3 02-04 26-28 26-28 23-25 02-04 27-29 23-25 30-01 24-26 01-03 26-28 26-28 6.250.000
123 KEWIRAUSAHAAN PRA PURNA BAKTI 4 02-05 05-08 05-08 02-05 08-11 04-07 02-05 06-09 03-06 02-05 05-08 10-13 7.250.000
124 MOSSAD STRATEGY ON BUSINESS 3 29-31 07-09 07-09 04-06 28-30 04-06 04-06 30-01 05-07 29-31 07-09 03-05 6.250.000
125 PERSUASIVE MARKETING 3 17-19 28-02 28-30 25-27 14-16 27-29 25-27 29-31 26-28 17-19 28-30 26-28 6.250.000
126 PSYCHO-SPIRITUALITY IN ENTREPRENEURSHIP 3 24-26 05-07 05-07 02-04 23-25 04-06 02-04 01-03 03-05 24-26 05-07 05-07 6.250.000
127 Warehouse Management For Project & Services 2 10-11 28-01 28-29 25-26 09-10 25-26 25-26 20-21 26-27 10-11 28-29 27-28 4.950.000
128 Supply Chain Management For Project & Services 2 17-18 07-08 07-08 04-05 16-17 04-05 04-05 20-21 05-06 17-18 07-08 05-06 4.950.000
129 MANAJEMEN PERPAJAKAN 3 22-24 19-21 19-21 16-18 02-04 04-06 16-18 13-15 17-19 22-24 19-21 26-28 6.250.000
130 INDONESIA TAX OUTLOOK 2015-2016 DAN TAX 2 29-30 26-27 26-27 23-24 28-29 25-26 23-24 20-21 24-25 29-30 26-27 26-27 4.500.000
AMNESTY
131 Rekonsiliasi Fiskal & Penyusunan SPT Tahunan PPH 3 02-04 05-07 05-07 02-04 02-04 06-08 02-04 27-29 03-05 01-03 05-07 26-28 6.250.000
Badan
132 TRANSFER PRICING DOCUMENTATION 2 08-09 12-13 12-13 09-10 07-08 27-28 09-10 20-21 10-11 08-09 12-13 26-27 4.500.000
133 Fraud Risk Management 3 15-17 21-23 21-23 18-20 14-16 04-06 18-20 30-01 19-21 15-17 21-23 26-28 6.250.000
134 CUSTOMER LOYALITY STRATEGY 3 29-31 05-07 05-07 02-04 28-30 04-06 02-04 06-08 03-05 29-31 05-07 26-28 6.250.000
135 Crisis Management 3 15-17 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 15-17 05-07 26-28 6.250.000
136 INTERVIEWING SKILL FOR RECRUITMENT PROMOTION 3 22-24 12-14 12-14 09-11 02-04 25-27 09-11 06-08 10-12 22-24 12-14 26-28 6.250.000

137 QUALITY MANAGEMENT SYSTEM ISO 9001 2008 3 29-31 19-21 19-21 16-18 02-04 06-08 16-18 13-15 17-19 29-31 19-21 26-28 6.250.000
STANDARD (SISTEM MANAJEMEN MUTU)
138 SECURITY MANAGEMENT SYSTEM 3 02-04 26-28 26-28 23-25 02-04 27-29 23-25 27-29 24-26 01-03 26-28 26-28 6.250.000
139 BASIC LEADERSHIP 3 08-10 07-09 07-09 04-06 02-04 04-06 04-06 01-03 05-07 08-10 07-09 26-28 6.250.000
140 DINAMIKA SERIKAT PEKERJA DALAM PERUSAHAAN 2 18-19 14-15 15-16 12-13 02-03 25-26 12-13 20-21 13-14 18-19 15-16 26-27 4.950.000
TERKAIT MENGHADAPI ERA GLOBALISASI
141 HOUR OF CHANGE MANAGEMENT 3 24-26 21-23 21-23 18-20 21-23 06-08 18-20 08-10 19-21 24-26 21-23 26-28 6.250.000
142 HUBUNGAN INDUSTRIAL KEPEGAWAIAN 3 31-02 28-02 28-30 25-27 28-30 27-29 25-27 14-16 26-28 31-02 28-30 26-28 6.250.000
143 HUKUM KEIMIGRASIAN TERKAIT PEMBERIAN IJIN 3 03-05 05-07 05-07 02-04 02-04 04-06 02-04 29-31 03-05 03-05 05-07 03-05 6.250.000
MEMPERKERJAKAN TENAGA KERJA ASING
144 LOBBYING AND SCHEDULLING 3 10-12 12-14 12-14 09-11 07-09 25-27 09-11 30-01 10-12 10-12 12-14 10-12 6.250.000
145 MAN POWER PLANNING 3 15-17 19-21 19-21 16-18 14-16 06-08 16-18 06-08 17-19 15-17 19-21 17-19 6.250.000
146 PROBLEM SOLVING & DECISION MAKING 3 22-24 26-28 26-28 23-25 23-25 27-29 23-25 13-15 24-26 22-24 26-28 26-28 6.250.000
147 STRATEGI MEMBANGUN IMAGE CORPORATE 3 29-31 07-09 07-09 04-06 30-01 04-06 04-06 27-29 05-07 29-31 07-09 05-07 6.250.000
148 TRANSFORMATION LEADERSHIP 3 02-04 13-15 14-16 11-13 02-04 25-27 11-13 01-03 12-14 01-03 14-16 12-14 6.250.000
149 MANAJEMEN RESIKO 3 08-10 21-23 21-23 18-20 09-11 06-08 18-20 08-10 19-21 08-10 21-23 19-21 6.250.000
150 INTELLIGENT AND INVESTIGATION SKILLS 3 17-19 28-02 28-30 25-27 16-18 27-29 25-27 14-16 26-28 17-19 28-30 26-28 6.250.000
151 ASSET SECURITY MANAGEMENT 3 24-26 05-07 05-07 02-04 21-23 04-06 02-04 29-31 03-05 24-26 05-07 03-05 6.250.000
152 GENERAL AFFAIRS MANAGEMENT SYSTEM 3 31-02 12-14 12-14 09-11 28-30 25-27 09-11 30-01 10-12 31-02 12-14 10-12 6.250.000
153 MEASURING CUSTOMER SATISFACTION 3 03-05 19-21 19-21 16-18 02-04 06-08 16-18 06-08 17-19 03-05 19-21 17-19 6.250.000
154 Training Analysis Program 3 10-12 26-28 26-28 23-25 07-09 27-29 23-25 13-15 24-26 10-12 26-28 26-28 6.250.000
155 CREATIVE ACCOUNTING DAN DISCLOSURE 3 08-10 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 08-10 05-07 26-28 6.250.000
156 PENCEGAHAN FRAUD DAN INVESTIGATIF 3 15-17 12-14 12-14 09-11 02-04 25-27 09-11 06-08 10-12 15-17 12-14 26-28 6.250.000
157 ASSET MANAGEMENT 3 29-31 26-28 26-28 23-25 28-30 25-27 23-25 13-15 24-26 29-31 26-28 26-28 6.250.000
158 ASSET MANAGEMENT BERBASIS ICT 3 02-04 05-07 05-07 02-04 02-04 06-08 02-04 27-29 03-05 01-03 05-07 03-05 6.250.000
159 DOCUMENT CONTROL ( VERIFICATION AND 3 08-10 12-14 12-14 09-11 07-09 27-29 09-11 30-01 10-12 08-10 12-14 10-12
CLASSIFICATION ) 6.250.000
160 DOCUMENT MANAGEMENT SYSTEM AND ELECTRONIC 3 15-17 21-23 21-23 18-20 14-16 04-06 18-20 08-10 19-21 15-17 21-23 17-19
FILING 6.250.000
161 MANAGEMENT INFORMATION SYSTEM 3 24-26 28-02 28-30 25-27 21-23 25-27 25-27 14-16 26-28 24-26 28-30 26-28 6.250.000
162 MANAGEMENT OF DOCUMENT CONTROL & MODERN 3 31-02 07-09 07-09 04-06 30-01 06-08 04-06 29-31 05-07 31-02 07-09 05-07
LIBRARY 6.250.000
163 Office MANAGEMENT AND ELECTRONIC FILING SYSTEM 3 03-05 13-15 14-16 11-13 02-04 27-29 11-13 01-03 12-14 03-05 14-16 12-14
6.250.000
164 Office MODERN FILING MANAGEMENT 3 10-12 19-21 19-21 16-18 09-11 04-06 16-18 06-08 17-19 10-12 19-21 19-21 6.250.000
165 EFFECTIVE REPORT WRITING TECHNIQUE 3 17-19 26-28 26-28 23-25 16-18 25-27 23-25 13-15 24-26 17-19 26-28 26-28 6.250.000
166 Office AUTOMATION SKILL 3 22-24 05-07 05-07 02-04 23-25 06-08 02-04 27-29 03-05 22-24 05-07 03-05 6.250.000
167 TATACARA PENYUSUNAN SILABUS DIKLAT 3 29-31 12-14 12-14 09-11 28-30 27-29 09-11 30-01 10-12 29-31 12-14 10-12 6.250.000
168 COMERCIAL CONTRACT DRAFTING AND MANAGEMENT 3 08-10 05-07 05-07 02-04 02-04 04-06 02-04 13-15 03-05 08-10 05-07 26-28
6.250.000
169 CONTRACT MANAGEMENT 3 22-24 19-21 19-21 16-18 21-23 06-08 16-18 30-01 17-19 22-24 19-21 17-19 6.250.000
170 Cost control 3 29-31 28-02 28-30 25-27 28-30 25-27 25-27 08-10 26-28 29-31 28-30 26-28 6.250.000
171 Creative Problem Solving 4 02-05 06-09 06-09 03-06 08-11 04-07 03-06 13-16 04-07 02-05 06-09 04-07 6.250.000
172 Effective Business Letters Writing 3 10-12 13-15 14-16 11-13 02-04 27-29 11-13 29-31 12-14 10-12 14-16 12-14 6.250.000
173 Effective Inventory Management and Modern 4 16-19 20-23 20-23 17-20 15-18 05-08 17-20 31-03 18-21 16-19 20-23 18-21
Warehousing for Support Personal 6.250.000
174 Excellent Supervisory 4 02-05 12-15 12-15 09-12 07-10 26-29 09-12 27-30 10-13 01-04 12-15 10-13 6.250.000
175 Integrated and Effective Logistic Management 4 15-18 27-02 27-30 24-27 14-17 25-28 24-27 07-10 25-28 15-18 27-30 04-07 6.250.000
176 Leadership Skill How Become a More Effective Leader 3 22-24 07-09 07-09 04-06 21-23 04-06 04-06 14-16 05-07 22-24 07-09 26-28 6.250.000
177 Modern Office Administration and Filling System 4 09-12 26-01 26-29 23-26 08-11 25-28 23-26 06-09 24-27 09-12 26-29 03-06 6.250.000
178 PROJECT MANAGEMENT DARI KONSEPTUAL SAMPAI 4 23-26 12-15 12-15 09-12 22-25 26-29 09-12 27-30 10-13 23-26 12-15 10-13 6.250.000
OPERASIONAL
179 PRODUCTION PLANNING AND INVENTORY CONTROL 3 31-02 19-21 19-21 16-18 30-01 06-08 16-18 30-01 17-19 31-02 19-21 17-19
(PPIC) 6.250.000
TRAINING NEEDS ANALYSIS(TNA),TRAINING PLAN, 6.250.000
180 TRAINING BUDGET AND TRAINING IMPACT 3 15-17 12-14 14-16 11-13 14-16 27-29 11-13 29-31 12-14 15-17 14-16 12-14
EVALUATION(TIE)
181 MANAJEMEN ARSIP DINAMIS DAN PERPUSTAKAAN 2 22-23 19-20 19-20 16-17 21-22 04-05 16-17 20-21 17-18 22-23 19-20 17-18 4.950.000
BERBASIS TI
182 OTOMASI PERPUSTAKAAN BERBASIS SLIMS 3 29-31 26-28 26-28 23-25 28-30 25-27 23-25 06-08 24-26 29-31 26-28 26-28 6.250.000
183 KEWIRAUSAHAAN ENTERPRENEURSHIP 3 29-31 05-07 05-07 02-04 02-04 04-06 02-04 13-15 03-05 29-31 05-07 26-28 6.250.000
184 CAREER MANAGEMENT 3 22-24 05-07 05-07 02-04 21-23 06-08 02-04 06-08 03-05 22-24 05-07 03-05 6.250.000
185 COMPREHENSIVE TRAINING MANAGEMENT SYSTEM 3 29-31 12-14 12-14 09-11 28-30 27-29 09-11 13-15 10-12 29-31 12-14 10-12 6.250.000
186 ESSENTIAL SKILL FOR SECRETARY AND ADMINISTRATION 4 09-12 27-02 27-30 24-27 07-10 25-28 24-27 31-03 25-28 09-12 27-30 04-07 7.250.000
PROFESSIONAL
187 INTEGRATED HUMAN RESOURCES MANAGEMENT 3 03-05 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 03-05 26-28 26-28 6.250.000
188 LEADERSHIP AND EFFECTIVE SUPERVISORY 4 08-11 05-08 05-08 02-05 08-11 05-08 02-05 06-09 03-06 08-11 05-08 03-06 7.250.000
189 PELAKSANAAN DAN PERMASALAHAN PENGADAAN 3 15-17 12-14 12-14 09-11 14-16 27-29 09-11 13-15 10-12 15-17 12-14 10-12 6.250.000
TANAH PEMBEBASAN LAHAN
190 PENERAPAN EKONOMI TEKNIK DALAM PROSES 4 22-25 20-23 20-23 17-20 21-24 04-07 17-20 27-30 18-21 22-25 20-23 17-20 7.250.000
PENGAMBILAN KEPUTUSAN BISNIS
191 PLANNING AND ORGANIZE TRAINING 3 29-31 28-02 28-30 25-27 28-30 25-27 25-27 01-03 26-28 29-31 28-30 26-28 6.250.000
192 TRAINING DEVELOPMENT MANAGEMENT 3 17-19 19-21 19-21 16-18 16-18 04-06 16-18 29-31 17-19 17-19 19-21 19-21 6.250.000
193 Salesmanship Skills 2 25-26 26-27 26-27 23-24 24-25 25-26 23-24 20-21 24-25 25-26 26-27 26-27 4.500.000
194 BASIC RELATIONSHIP MANAGEMENT FOR LEADERS 3 29-31 05-07 05-07 02-04 28-30 06-08 02-04 27-29 03-05 29-31 05-07 03-05 6.250.000
195 COMPREHENSIVE MANAGERIAL SKILLS & LEADERSHIP 3 17-19 28-02 28-30 25-27 16-18 27-29 25-27 08-10 26-28 17-19 28-30 26-28 6.250.000
TRAINING
196 DEVELOVING HIGH PERFORMANCE TEAMS 2 25-26 08-09 08-09 05-06 24-25 06-07 05-06 20-21 06-07 25-26 08-09 06-07 4.950.000
197 EFFECTIVE EXECUTIVE SECRETARY 2 01-02 12-13 12-13 09-10 31-01 25-26 09-10 20-21 10-11 01-02 12-13 10-11 4.950.000
198 FILLING SYSTEM FOR SECRETARY 3 10-12 26-28 26-28 23-25 07-09 27-29 23-25 29-31 24-26 10-12 26-28 26-28 6.250.000
199 HR MANAGEMENT 2 22-23 14-15 14-15 11-12 21-22 25-26 11-12 20-21 12-13 22-23 14-15 12-13 4.950.000
200 HR MANAGEMENT OF CHANGE 3 29-31 21-23 21-23 18-20 28-30 06-08 18-20 06-08 19-21 29-31 21-23 19-21 6.250.000
201 INTEGRATED DOCUMENT & ELECTRONIC FILING SYSTEM 2 04-05 01-02 29-30 26-27 02-03 27-28 26-27 20-21 27-28 01-02 29-30 26-27 4.950.000

202 INVENTORY MANAGEMENT AND COST INVESTMENT 4 16-19 12-15 13-16 10-13 15-18 26-29 10-13 13-16 11-14 16-19 13-16 11-14 7.250.000
RECOVERY
203 Logistic Management 2 24-25 19-20 19-20 16-17 23-24 06-07 16-17 20-21 17-18 24-25 19-20 17-18 4.950.000
204 LOGISTIC MANAGEMENT & SUPPLY CHAIN 3 31-02 26-28 26-28 23-25 30-01 25-27 23-25 27-29 24-26 31-02 26-28 26-28 6.250.000
MANAGEMENT
205 MAN POWER PLANNING 3 02-04 05-07 05-07 02-04 02-04 06-08 02-04 30-01 03-05 03-05 05-07 03-05 6.250.000
206 MANAJEMEN PRODUKSI DAN OPERASI (MPO) 4 09-12 12-15 12-15 09-12 07-10 26-29 09-12 07-10 10-13 09-12 12-15 10-13 7.250.000
207 MATERIAL MANAGEMENT FOR PROJECT 4 15-18 20-23 20-23 17-20 14-17 04-07 17-20 13-16 18-21 15-18 20-23 18-21 7.250.000
208 MENINGKATKAN EFEKTIVITAS FUNGSI SUPERVISOR 2 25-26 01-02 29-30 26-27 24-25 25-26 26-27 20-21 27-28 25-26 29-30 26-27 4.950.000
209 PLAN LAY OUT Office 3 29-31 07-09 07-09 04-06 28-30 06-08 04-06 29-31 05-07 29-31 07-09 05-07 6.250.000
210 SERVICE EXCELLENT 3 03-05 12-14 14-16 11-13 02-04 27-29 11-13 01-03 12-14 01-03 14-16 12-14 6.250.000
211 SUPERVISORY LEADERSHIP AND DECISSION MAKING 3 08-10 19-21 19-21 16-18 09-11 04-06 16-18 06-08 17-19 08-10 19-21 17-19 6.250.000
212 WAREHOUSE MANAGEMENT OPERATION AND CONTROL 2 22-23 05-06 05-06 02-03 21-22 07-08 02-03 20-21 03-04 22-23 05-06 27-28 4.950.000
213 Warehousing & Distribution Management 3 31-02 13-15 12-14 09-11 30-01 27-29 09-11 27-29 10-12 31-02 12-14 10-12 6.250.000
214 TAX ACCOUNTING 3 22-24 05-07 05-07 02-04 21-23 04-06 02-04 13-15 03-05 22-24 05-07 26-28 6.250.000
215 RESTITUSI PAJAK, PEMERIKSAAN PAJAK, KEBERATAN, 3 29-31 12-14 12-14 09-11 28-30 25-27 09-11 27-29 10-12 29-31 12-14 10-12 6.250.000
BANDING DAN GUGATAN
216 MANAJEMEN MUTU TERPADU 2 02-03 19-20 19-20 16-17 02-03 04-05 16-17 20-21 17-18 01-02 19-20 17-18 4.950.000
217 TOTAL QUALITY MANAGEMENT SERIES MANAJEMEN 2 08-09 26-27 26-27 23-24 07-08 25-26 23-24 20-21 24-25 08-09 26-27 26-27 4.950.000
MUTU TERPADU
218 BUILDING A TEAM 2 22-23 12-13 12-13 09-10 02-03 25-26 09-10 20-21 10-11 22-23 12-13 26-27 4.950.000
219 CAREER PLANNING SYSTEM 2 29-30 19-20 19-20 16-17 03-04 04-05 16-17 20-21 17-18 29-30 19-20 27-28 4.950.000
220 COMPENSATION SYSTEM DEVELOPMENT 2 08-09 05-06 05-06 02-03 07-08 06-07 02-03 20-21 03-04 08-09 05-06 27-28 4.950.000
221 COMPETENCY-BASED HUMAN RESOURCES 2 15-16 14-15 14-15 11-12 14-15 28-29 11-12 20-21 12-13 15-16 14-15 10-11 4.950.000
MANAGEMENT
222 EFFECTIVE PERFORMANCE APPRAISAL 2 31-01 28-01 28-29 25-26 28-29 25-26 25-26 20-21 26-27 31-01 28-29 26-27 4.950.000
223 EFFECTIVE TRAINING MANAGEMENT 3 03-05 07-09 07-09 04-06 02-04 04-06 04-06 30-01 05-07 03-05 07-09 03-05 6.250.000
224 HUMAN RESOURCES MANAGEMENT FOR NON-HR 2 10-11 12-13 15-16 12-13 09-10 27-28 12-13 20-21 13-14 10-11 15-16 12-13 4.950.000
MANAGER
225 JOB COMPETENCY PROFILING 2 17-18 22-23 22-23 19-20 16-17 07-08 19-20 20-21 20-21 17-18 22-23 19-20 4.950.000
226 MEASURING TRAINING IMPACT 2 25-26 01-02 29-30 26-27 23-24 28-29 26-27 20-21 27-28 25-26 29-30 27-28 4.950.000
227 PERFORMANCE BASED PAY 2 01-02 05-06 05-06 02-03 30-31 04-05 02-03 20-21 03-04 01-02 05-06 06-07 4.950.000
228 STRATEGIC HUMAN RESOURCES MANAGEMENT FOR 2 11-12 19-20 19-20 16-17 10-11 06-07 16-17 20-21 17-18 11-12 19-20 20-21 4.950.000
GLOBAL COMPETITIVE ADVANTAGE
229 WORKLOAD ANALYSIS 2 18-19 26-27 26-27 23-24 17-18 27-28 23-24 20-21 24-25 18-19 26-27 26-27 4.950.000
230 ACTIVITY BASED MANAGEMENT 2 22-23 05-06 05-06 02-03 21-22 04-05 02-03 20-21 03-04 22-23 05-06 03-04 4.950.000
231 NEGOTIATION IMPROVE YOUR NEGOTIATING SKILLS AND 2 29-30 12-13 12-13 09-10 28-29 25-26 09-10 20-21 10-11 29-30 12-13 10-11 4.950.000
MAKE YOU MORE EFFECTIVE NEGOTIATOR
232 STRATEGIC MANAGEMENT 3 15-17 07-09 07-09 04-06 14-16 06-08 04-06 06-08 05-07 15-17 07-09 05-07 6.250.000
233 Supply Chain Management (SCM) 2 24-25 14-15 14-15 11-12 23-24 28-29 11-12 20-21 12-13 24-25 14-15 12-13 4.950.000
234 Supplier Management 2 31-01 21-22 21-22 18-19 30-31 04-05 18-19 20-21 19-20 31-01 21-22 19-20 4.950.000
235 ELECTRONIC FILLING SYSTEM MANAGEMENT 4 08-11 19-22 19-22 16-19 28-31 04-07 16-19 06-09 17-20 08-11 19-22 17-20 7.250.000
236 ASPEK HUKUM DAN PENYELESAIAN KONFLIK 3 22-24 05-07 05-07 02-04 02-04 04-06 02-04 27-29 03-05 22-24 05-07 26-28
PERTANAHAN 6.250.000
237 ANTI MONOPOLI 3 29-31 12-14 12-14 09-11 02-04 25-27 09-11 30-01 10-12 29-31 12-14 26-28 6.250.000
238 HUKUM KEPAILITAN 3 02-04 19-21 19-21 16-18 02-04 06-08 16-18 06-08 17-19 01-03 19-21 26-28 6.250.000
239 HUKUM KETENAGAKERJAAN & HUBUNGAN INDUSTRIAL 3 08-10 26-28 26-28 23-25 02-04 27-29 23-25 13-15 24-26 08-10 26-28 26-28
6.250.000
240 HUKUM PERLINDUNGAN KONSUMEN DAN PERSAINGAN 3 15-17 07-09 07-09 04-06 14-16 04-06 04-06 29-31 05-07 15-17 07-09 26-28
BISNIS 6.250.000
241 HUKUM TINDAK PIDANA KORUPSI 3 24-26 13-15 14-16 11-13 21-23 25-27 11-13 01-03 12-14 24-26 14-16 10-12 6.250.000
242 STRATEGI MENGANTISIPASI RISIKO TINDAK PIDANA 3 31-02 21-23 21-23 18-20 28-30 06-08 18-20 08-10 19-21 31-02 21-23 17-19
(KORUPSI) 6.250.000
243 TINDAK PIDANA PENCUCIAN UANG DAN PERANAN BANK 3 03-05 28-02 28-30 25-27 02-04 27-29 25-27 14-16 26-28 03-05 28-30 26-28
UNTUK MENCEGAHNYA 6.250.000
244 TIPIKOR DALAM PENGELOLAAN KEUANGAN 3 10-12 05-07 05-07 02-04 07-09 04-06 02-04 27-29 03-05 10-12 05-07 03-05 6.250.000
PERUSAHAAN & PERBANKAN
245 BERITA ACARA PEMERIKSAAN 3 17-19 12-14 12-14 09-11 16-18 25-27 09-11 30-01 10-12 17-19 12-14 12-14 6.250.000
246 MARITIME & SHIPPING LAW IN INDONESIA 3 22-24 19-21 19-21 16-18 23-25 06-08 16-18 06-08 17-19 22-24 19-21 19-21 6.250.000
247 HUKUM DAN KONTRAK KONSTRUKSI 3 29-31 26-28 26-28 23-25 30-01 27-29 23-25 13-15 24-26 29-31 26-28 26-28 6.250.000
248 BASIC OF SUPPLY CHAIN MANAGEMENT 2 22-23 26-27 26-27 23-24 21-22 25-26 23-24 20-21 24-25 22-23 26-27 26-27 4.950.000
249 EFFECTIVE LINE BALANCING 2 29-30 05-06 05-06 02-03 28-29 04-05 02-03 20-21 03-04 29-30 05-06 03-04 4.950.000
250 FILLING MANAGEMENT FOR SECRETARY AND 3 02-04 12-14 12-14 09-11 02-04 27-29 09-11 13-15 10-12 01-03 12-14 10-12
ADMINISTRATION STAFF 6.250.000
251 INFORMATION SYSTEMS AND INFORMATION 3 08-10 19-21 19-21 16-18 07-09 06-08 16-18 27-29 17-19 08-10 19-21 17-19 6.250.000
TECHNOLOGIES FOR SUPPLY CHAIN MANAGEMENT
252 ISO WAREHOUSING 2 24-25 07-08 07-08 04-05 23-24 04-05 04-05 20-21 05-06 24-25 07-08 27-28 4.950.000
253 KOMPUTERISASI PERGUDANGAN 2 31-01 14-15 15-16 12-13 30-31 28-29 12-13 20-21 13-14 31-01 15-16 13-14 4.950.000
254 MAINTENANCE MANAGEMENT (FOR MANUFACTURE 3 03-05 21-23 21-23 18-20 02-04 06-08 18-20 06-08 19-21 03-05 21-23 19-21 6.250.000
AND OIL & GAS COMPANY)
255 MEASURING AND MANAGING COST ESCALATION IN 2 18-19 08-09 08-09 05-06 17-18 04-05 05-06 20-21 06-07 18-19 08-09 03-04 4.950.000
PROJECT
256 MODERN WAREHOUSE DESIGN 2 25-26 12-13 12-13 09-10 24-25 27-28 09-10 20-21 10-11 25-26 12-13 10-11 4.950.000
257 NEGOTIATION SKILL FOR PURCHASING STAFF 3 31-02 19-21 19-21 16-18 30-01 06-08 16-18 14-16 17-19 31-02 19-21 17-19 6.250.000
258 OPERATING SYSTEMS TECHNOLOGIES AND 3 02-04 28-02 28-30 25-27 02-04 27-29 25-27 29-31 26-28 01-03 28-30 26-28 6.250.000
INSTALLATION PROCEDURES
259 PLANNING AND MANAGING INVENTORIES IN A SUPPLY 3 08-10 05-07 05-07 02-04 07-09 04-06 02-04 01-03 03-05 08-10 05-07 05-07 6.250.000
CHAIN
260 PLANNING DEMAND AND SUPPLY IN A SUPPLY CHAIN 3 15-17 13-15 14-16 11-13 14-16 25-27 11-13 08-10 12-14 15-17 14-16 12-14 6.250.000
261 PROJECT EVALUATION AND FINANCING 3 29-31 26-28 26-28 23-25 28-30 27-29 23-25 13-15 24-26 29-31 26-28 26-28 6.250.000
262 PROJECT MANAGEMENT USING MICROSOFT PROJECT 3 03-05 07-09 07-09 04-06 02-04 04-06 04-06 27-29 05-07 03-05 07-09 03-05
6.250.000
263 PROJECT MANAGEMENT(PM) WITH PRIMAVERA V6 3 10-12 12-14 12-14 09-11 09-11 25-27 09-11 30-01 10-12 10-12 12-14 10-12 6.250.000
264 RFID for WAREHOUSE 2 18-19 19-20 19-20 16-17 17-18 07-08 16-17 20-21 17-18 18-19 19-20 17-18 4.950.000
265 STRATEGI SISTEM INFORMASI KESEHATAN DI RUMAH 3 24-26 28-02 28-30 25-27 23-25 27-29 25-27 06-08 26-28 24-26 28-30 26-28 6.250.000
SAKIT
266 STUDI KELAYAKAN INVESTASI MENGGUNAKAN APLIKASI 3 31-02 05-07 05-07 02-04 30-01 04-06 02-04 14-16 03-05 31-02 05-07 05-07 6.250.000
MICROSOFT EXCEL
267 TRANSPORTATION AND FACILITY DECISIONS IN A SUPPLY 3 02-04 13-15 14-16 11-13 02-04 25-27 11-13 29-31 12-14 01-03 14-16 12-14 6.250.000
CHAIN
268 VENDOR MANAGED INVENTORY 2 08-09 21-22 21-22 18-19 07-08 07-08 18-19 20-21 19-20 08-09 21-22 19-20 4.950.000
269 Workload Analysis 2 15-16 26-27 26-27 23-24 14-15 28-29 23-24 20-21 24-25 15-16 26-27 26-27 4.950.000
270 ENTERPRISE RESOURCES PLANNING (ERP) 4 22-25 06-09 06-09 03-06 21-24 04-07 03-06 31-03 04-07 22-25 06-09 03-06 7,950,000
271 ANALISA KEBUTUHAN BARANG PERSEDIAAN 3 29-31 12-14 12-14 09-11 28-30 25-27 09-11 08-10 10-12 29-31 12-14 10-12 6.250.000
272 PROJECT COST MANAGEMENT 3 03-05 21-23 21-23 18-20 02-04 06-08 18-20 13-15 19-21 03-05 21-23 19-21 6.250.000
273 PROJECT MANAGEMENT IN ENGINEERING, 3 10-12 28-02 28-30 25-27 09-11 27-29 25-27 27-29 26-28 10-12 28-30 26-28 6.250.000
PROCUREMENT & CONSTRUCTION
274 ADVANCED LAND TRANSPORT 3 17-19 05-07 05-07 02-04 16-18 04-06 02-04 30-01 03-05 17-19 05-07 05-07 6.250.000
275 HUMAN RESOURCE PLANNING AND PRODUCTIVITY 3 29-31 19-21 19-21 16-18 02-04 04-06 16-18 13-15 17-19 29-31 19-21 26-28 6,250,000
276 JOB DESCRIPTION ANALYSIS, DEVELOPMENT, AND 2 02-03 26-27 26-27 23-24 02-03 25-26 23-24 20-21 24-25 01-02 26-27 26-27 4.950.000
DESIGN
277 Project Management (3 Hr) 3 08-10 05-07 05-07 02-04 02-04 06-08 02-04 27-29 03-05 08-10 05-07 26-28 6,250,000
278 PROJECT MANAGEMENT (PM) (5Hr) 5 15-19 19-23 12-16 09-13 14-18 25-29 09-13 30-03 10-14 15-19 12-16 17-21 9,500,000
279 STRATEGIC HUMAN RESOURCE MANAGEMENT 3 22-24 12-14 21-23 18-20 21-23 04-06 18-20 06-08 19-21 22-24 21-23 26-28 6.250.000
280 STRATEGIC HUMAN RESOURCE MANAGEMENT AND 3 31-02 28-02 28-30 25-27 28-30 25-27 25-27 14-16 26-28 31-02 28-30 26-28 6.250.000
ORGANIZATION DEVELOPMENT
281 Strategic Performance Management 3 03-05 07-09 07-09 04-06 02-04 06-08 04-06 29-31 05-07 03-05 07-09 03-05 6.250,000
282 Strategic Planning 5 08-12 19-23 12-16 09-13 07-11 25-29 09-13 30-03 10-14 08-12 12-16 10-14 9,500,000
283 CRYSTALL BALL 3 15-17 12-14 19-21 16-18 14-16 04-06 16-18 06-08 17-19 15-17 19-21 17-19 7.250.000

284 DECISION MAKING BY USING STRATEGIC THINKING 2 22-23 26-27 26-27 23-24 21-22 25-26 23-24 20-21 24-25 22-23 26-27 26-27 4.950.000
(PENDEKATAN SISTEMIK DAN NEW 7 TOOLS APPROACH)
285 INOVASI DAN KREATIFITAS MENUJU ORGANISASI 2 02-03 14-15 12-13 09-10 02-03 27-28 09-10 20-21 10-11 01-02 12-13 10-11 4.950.000
PEMBELAJARAN
286 LEADERSHIP FOR MANAGER 4 08-11 19-22 20-23 17-20 07-10 04-07 17-20 27-30 18-21 08-11 20-23 18-21 7.250.000
287 ADMINISTRASI KEPABEANAN 4 02-05 19-22 19-22 16-19 07-10 04-07 16-19 27-30 17-20 01-04 19-22 17-20 7.250.000
288 Custom facility, Shipping Documents & Export Import 2 08-09 26-27 26-27 23-24 02-03 25-26 23-24 20-21 24-25 08-09 26-27 26-27 4.950.000
Procedure
289 EFFECTIVE PUBLIC RELATIONS SKILL 3 15-17 05-07 05-07 02-04 14-16 06-08 02-04 30-01 03-05 15-17 05-07 03-05 6.250.000
290 Export-Import 3 22-24 12-14 12-14 09-11 21-23 27-29 09-11 06-08 10-12 22-24 12-14 10-12 6.250.000
291 Export-Import and Incoterm 3 29-31 21-23 21-23 18-20 28-30 04-06 18-20 13-15 19-21 29-31 21-23 19-21 6.250.000
292 FREIGHT FORWARDING 2 02-03 28-01 28-29 25-26 03-04 25-26 25-26 20-21 26-27 04-05 28-29 27-28 4.950.000
293 Incoterm 2010 2 10-11 08-09 08-09 05-06 10-11 07-08 05-06 20-21 06-07 10-11 08-09 06-07 4.950.000
294 PEMAHAMAN SHIPPING DOCUMENT & PROSEDUR 3 17-19 13-15 14-16 11-13 16-18 27-29 11-13 29-31 12-14 17-19 14-16 12-14 6.250.000
KEPABEANAN
295 INFORMATION TECHNOLOGY PROJECT MANAGEMENT 4 29-01 05-08 05-08 02-05 28-31 05-08 02-05 13-16 03-06 29-01 05-08 10-13 7.250.000
296 INVENTORY MANAGEMENT FOR RAW MATERIAL 3 02-04 12-14 12-14 09-11 02-04 27-29 09-11 27-29 10-12 01-03 12-14 26-28 6.250.000
297 Office Automation 2 11-12 26-27 26-27 23-24 02-03 25-26 23-24 20-21 24-25 11-12 26-27 26-27 4.950.000
298 PROBLEM SOLVING & DECISION MAKING 3 15-17 05-07 05-07 02-04 16-18 06-08 02-04 06-08 03-05 15-17 05-07 03-05 7.250.000
299 STRATEGIC PLANNING FOR INFORMATION SYSTEMS 3 08-10 07-09 07-09 04-06 02-04 06-08 04-06 08-10 05-07 08-10 07-09 26-28 7.250.000
300 SUPPLY MARKET ANALYSIS 4 16-19 12-15 12-15 09-12 14-17 26-29 09-12 13-16 10-13 16-19 12-15 10-13 7.250.000
301 TOTAL COST OF OWNERSHIP ANALYSIS 3 31-02 26-28 26-28 23-25 30-01 25-27 23-25 30-01 24-26 31-02 26-28 26-28 7.250.000
302 CONTRACT MANAGEMENT 4 08-11 05-08 05-08 02-05 28-31 04-07 02-05 06-09 03-06 08-11 05-08 03-06 7.250.000
303 PAJAK DAN PROSEDUR IMPLEMENTASI 4 15-18 12-15 12-15 09-12 07-10 25-28 09-12 13-16 10-13 15-18 12-15 10-13 7.250.000
304 TAX AND FINANCIAL CONTROL 3 22-24 19-21 19-21 16-18 02-04 06-08 16-18 27-29 17-19 22-24 19-21 26-28 6.250.000
305 Inventory Management Manufacturing Industry 4 29-01 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 29-01 06-09 04-07 7.250.000
306 OPTIMIZATION FOR PRODUCTION SYSTEM 4 23-26 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 23-26 20-23 17-20 7.250.000
307 Perancangan Tata Letak Pabrik 4 22-25 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 22-25 26-29 11-14 7.250.000
308 PRODUCTION AND OPERATION MANAGEMENT 4 23-26 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 23-26 06-09 04-07 7.250.000
309 PRODUCTION AND PLANNING CONTROL 4 30-02 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 30-02 13-16 11-14 7.250.000
310 Production Handling Separation and Measurement 4 02-05 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 02-05 19-22 17-20 7.250.000
311 QUALITY CONTROL OF PRODUCT 4 08-11 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 08-11 06-09 17-20 7.250.000
312 QUALITY SYSTEM ENGINEERING 4 16-19 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 16-19 13-16 03-06 7.250.000
313 SYSTEM AND COST PRODUCTION 4 02-05 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 02-05 05-08 04-07 7.250.000
314 ANALISA KEUANGAN 2 08-09 19-20 19-20 16-17 07-08 04-05 16-17 20-21 17-18 08-09 19-20 26-27 4.500.000
315 ANALISA KREDIT MODAL KERJA KONTRAKTOR DAN 2 15-16 26-27 26-27 23-24 14-15 25-26 23-24 20-21 24-25 15-16 26-27 27-28 4.500.000
STANDBY KREDIT
316 ANALISA PERKREDITAN 4 22-25 05-08 05-08 02-05 21-24 05-08 02-05 27-30 03-06 22-25 05-08 10-13 7.250.000
317 BASIC ACCOUNTING 4 29-01 12-15 12-15 09-12 28-31 26-29 09-12 30-02 10-13 29-01 12-15 17-20 7.250.000
318 PEMBERIAN KREDIT DENGAN PENDEKATAN LAPORAN 2 02-03 21-22 21-22 18-19 02-03 04-05 18-19 20-21 19-20 01-02 21-22 26-27 4.500.000
ARUS KAS_CASH FLOW
319 PENILAIAN KELAYAKAN PROYEK (FEASIBILITY STUDY) 2 10-11 28-01 28-29 25-26 09-10 25-26 25-26 20-21 26-27 10-11 28-29 27-28 4.500.000
320 PENYELESAIAN KREDIT BERMASALAH 2 17-18 08-09 08-09 05-06 16-17 06-07 05-06 20-21 06-07 17-18 08-09 03-04 4.500.000
321 PENYUSUNAN DAN ANALISA SCORING RATING 2 25-26 12-13 15-16 12-13 24-25 27-28 12-13 20-21 13-14 25-26 15-16 13-14 4.500.000
322 PENYUSUNAN PERATURAN INTERNAL PERKREDITAN 3 31-02 21-23 21-23 18-20 30-01 06-08 18-20 06-08 19-21 31-02 21-23 19-21 6.250.000
BANK
323 GOOD CORPORATE GOVERNANCE 3 03-05 28-02 28-30 25-27 02-04 27-29 25-27 13-15 26-28 03-05 28-30 26-28 6.250.000
324 Audit Perkreditan Bank 3 10-12 05-07 05-07 02-04 09-11 04-06 02-04 29-31 03-05 10-12 05-07 05-07 6.250.000
325 Pencegahan dan Audit Fraud di Lingkungan Perbankan 3 17-19 13-15 12-14 09-11 16-18 25-27 09-11 01-03 10-12 17-19 12-14 10-12 6.250.000
326 COST MANAGEMENT 3 15-17 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 15-17 26-28 26-28 6.250.000
327 DASAR-DASAR PERBENDAHARAAN 4 22-25 05-08 05-08 02-05 21-24 04-07 02-05 06-09 03-06 22-25 05-08 10-13 7.250.000
328 MANAJEMEN RISIKO INVESTASI 4 29-01 12-15 12-15 09-12 28-31 26-29 09-12 13-16 10-13 29-01 12-15 17-20 7.250.000
329 MANAJEMEN KEUANGAN UNTUK NON MANAJER 2 02-03 19-20 19-20 16-17 02-03 04-05 16-17 20-21 17-18 01-02 19-20 26-27 4.950.000
KEUANGAN
330 STUDY KELAYAKAN BISNIS 2 08-09 26-27 26-27 23-24 03-04 25-26 23-24 20-21 24-25 08-09 26-27 27-28 4.950.000
331 CUSTOMER RELATIONSHIP MANAGEMENT (CRM) 4 15-18 26-01 26-29 23-26 28-31 26-29 23-26 27-30 24-27 15-18 26-29 03-06 7.250.000
332 FINANCING CONDOTEL HOTEL OPERATION 4 22-25 05-08 05-08 02-05 07-10 05-08 02-05 30-02 03-06 22-25 05-08 10-13 7.250.000
333 MANAGEMENT OF OUTSOURCE STAFF HOUSING AND 4 29-01 12-15 13-16 10-13 14-17 25-28 10-13 07-10 11-14 29-01 13-16 18-21 7.250.000
CATERING SERVICES
334 Service Recovery Create Loyal Customers for Life 3 10-12 28-02 28-30 25-27 02-04 27-29 25-27 29-31 26-28 10-12 28-30 26-28 6.250.000
335 MEMBEDAH PROFESI SEKRETARIS PROFESSIONAL 4 15-18 26-01 26-29 23-26 21-24 25-28 23-26 27-30 24-27 15-18 26-29 10-13 7.250.000

336 PRESENTATION SKILL FOR PUBLIC RELATIONS & 2 22-23 22-23 22-23 19-20 21-22 07-08 19-20 20-21 20-21 22-23 22-23 20-21 4.950.000
MARKETING STAFF (USING MICROSOFT POWER POINT)
337 IT AUDIT PRACTICES 3 08-10 21-23 21-23 18-20 07-09 04-06 18-20 01-03 19-21 08-10 21-23 17-19 6.250.000
338 IT HELPDESK 3 17-19 28-02 28-30 25-27 14-16 25-27 25-27 08-10 26-28 17-19 28-30 26-28 6.250.000
339 Change & conflict management and dealing with difficult 2 02-03 05-06 05-06 02-03 02-03 07-08 02-03 20-21 03-04 01-02 05-06 03-04 4.950.000
people
340 Strategic and Systematic Thinking 2 29-30 08-09 08-09 05-06 28-29 04-05 05-06 20-21 06-07 29-30 08-09 06-07 4.950.000
341 THE LEADERSHIP CHALLENGE 2 02-03 14-15 15-16 12-13 02-03 28-29 12-13 30-31 13-14 01-02 15-16 13-14 4.950.000
342 COACHING & CONSELING DI PERUSAHAAN 3 24-26 21-23 21-23 18-20 21-23 06-08 18-20 29-31 19-21 24-26 21-23 19-21 6.250.000
343 COACHING AND COUNSELING ( MONITORING) 3 02-04 12-14 19-21 16-18 02-04 06-08 16-18 13-15 17-19 08-10 19-21 17-19 6.250.000
344 PERFORMANCE COACHING FOR MANAGER 2 15-16 05-06 05-06 02-03 02-03 04-05 02-03 20-21 03-04 15-16 05-06 26-27 4.950.000
345 EFFECTIVE PRESENTATION AND REPORT WRITING 3 24-26 26-28 26-28 23-25 23-25 25-27 23-25 06-08 24-26 24-26 26-28 26-28 6.250.000
346 Effective Time Management 3 31-02 05-07 05-07 02-04 30-01 04-06 02-04 13-15 03-05 31-02 05-07 03-05 6.250.000
347 HANDLING CONFLICT AND COMPLAINT EFFECTIVELY 3 08-10 19-21 19-21 16-18 02-04 06-08 16-18 30-01 17-19 08-10 19-21 17-19 6.250.000
348 Strategic Time Management 3 03-05 28-02 28-30 25-27 02-04 25-27 25-27 08-10 26-28 01-03 28-30 26-28 6.250.000
349 TIME MANAGEMENT 4 16-19 26-01 26-29 23-26 15-18 25-28 23-26 13-16 24-27 16-19 26-29 03-06 7.250.000
350 HOW TO HANDLE CRITICISM AND COMPLAIN 2 08-09 26-27 26-27 23-24 07-08 25-26 23-24 06-07 24-25 08-09 26-27 26-27 4.950.000
351 LIFE CYCLE COSTING 3 29-31 26-28 26-28 23-25 28-30 25-27 23-25 27-29 24-26 29-31 26-28 26-28 6.250.000
352 ENGINEERING MATERIAL KNOWLEDGE FOR WAREHOUSE 3 22-24 12-14 12-14 09-11 21-23 25-27 09-11 06-08 10-12 22-24 12-14 10-12 6.250.000
PEOPLE
353 CULTURE CHANGE FOR MAINTENANCE AND RELIABILITY 3 22-24 19-21 19-21 16-18 21-23 04-06 16-18 13-15 17-19 22-24 19-21 17-19 6.250.000
IMPROVEMENT
354 PETROLEUM FINANCE, COST CONTROL & RESERVOIR 4 22-25 06-09 06-09 03-06 08-11 04-07 03-06 07-10 04-07 22-25 06-09 18-21 6.250.000
MANAJEMEN (Petroleum Economics)
355 CATERING & ACCOMMODATION MANAGEMENT 4 02-05 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 01-04 12-15 17-20 7.250.000
(INCLUDING TABLE MANNER)
356 COMMUNICATION, ASSERTIVENESS AND CONFLICT 2 10-11 22-23 22-23 19-20 02-03 04-05 19-20 20-21 20-21 10-11 22-23 20-21 4.950.000
MANAGEMENT
357 INNER SUCCESS TRAINING 4 29-01 05-08 05-08 02-05 28-31 05-08 02-05 13-16 03-06 29-01 05-08 03-06 7.250.000
358 SPEED AND INNOVATION 3 24-26 21-23 21-23 18-20 21-23 06-08 18-20 27-29 19-21 24-26 21-23 19-21 6.250.000
359 HYPNOTIC SELLING TECHNIQUE Menjual Tanpa 2 22-23 12-13 12-13 09-10 03-04 25-26 09-10 20-21 10-11 22-23 12-13 27-28 4.950.000
Hambatan dengan Aplikasi Hypnosis dan NLP
360 CONTEMPORARY COMMUNICATION & LEADERSHIP 3 22-24 12-14 12-14 09-11 21-23 25-27 09-11 13-15 10-12 22-24 12-14 26-28 6.250.000
361 TALENT MANAGEMENT 4 09-12 12-15 13-16 10-13 07-10 26-29 10-13 13-16 11-14 09-12 13-16 11-14 7.250.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
MANAJEMEN - PROCUREMENT
1 Prinsip dasar dan prosedur pengadaan barang & jasa 3 31-02 26-28 26-28 23-25 30-01 25-27 23-25 29-31 24-26 31-02 26-28 26-28 6.250.000
2 HARGA PERKIRAAN SENDIRI (HPS) 2 08-09 05-06 05-06 02-03 07-08 06-07 02-03 20-21 03-04 08-09 05-06 03-04 4.950.000
3 ASPEK TKDN 2 29-30 19-20 19-20 16-17 02-03 04-05 16-17 20-21 17-18 29-30 19-20 26-27 4.950.000
4 INTEGRATED PROCUREMENT MANAGEMENT 2 08-09 05-06 05-06 02-03 02-03 06-07 02-03 20-21 03-04 08-09 05-06 26-27 4.950.000
TEKNIK DAN METODE PENYUSUNAN HPS OE (HARGA
5 PERKIRAAN SENDIRI) ATAS PENGADAAN BARANG DAN 3 31-02 05-07 05-07 02-04 30-01 04-06 02-04 08-10 03-05 31-02 05-07 05-07 6.250.000
JASA
6 Procurement & Purchasing Management 2 02-03 12-13 12-13 09-10 02-03 25-26 09-10 20-21 10-11 01-02 12-13 10-11 4.950.000
7 Strategic Sourcing & Vendor Management 2 08-09 19-20 19-20 16-17 07-08 04-05 16-17 20-21 17-18 08-09 19-20 17-18 4.950.000
Metode Penyusunan Spesifikasi & Harga Perkiraan
8 2 15-16 26-27 26-27 23-24 14-15 27-28 23-24 20-21 24-25 15-16 26-27 26-27 4.950.000
Sendiri
9 Negotiation Skills For Procurement 2 22-23 05-06 05-06 02-03 21-22 06-07 02-03 20-21 03-04 22-23 05-06 03-04 4.950.000
10 Procurement Progress & Order Monitoring 2 29-30 14-15 14-15 11-12 28-29 28-29 11-12 20-21 12-13 29-30 14-15 12-13 4.950.000
11 Procurement Fraud & Audit 2 04-05 21-22 21-22 18-19 03-04 07-08 18-19 20-21 19-20 03-04 21-22 19-20 4.950.000
12 BASIC PROCUREMENT & PURCHASING 3 22-24 26-28 26-28 23-25 21-23 27-29 23-25 13-15 24-26 22-24 26-28 26-28 6.250.000
13 PROCUREMENT MANAGEMENT 2 02-03 19-20 19-20 16-17 02-03 06-07 16-17 20-21 17-18 01-02 19-20 17-18 4.950.000
14 PROCUREMENT STRATEGY 2 08-09 26-27 26-27 23-24 07-08 27-28 23-24 20-21 24-25 08-09 26-27 26-27 4.950.000
15 PRINCIPLES OF PROCUREMENT MANAGEMENT 3 24-26 13-15 14-16 11-13 23-25 25-27 11-13 06-08 12-14 24-26 14-16 12-14 6.250.000
16 E-PROCUREMENT (E-Proc) 3 22-24 26-28 26-28 23-25 02-04 25-27 23-25 06-08 24-26 22-24 26-28 26-28 6.250.000
17 TEKNIK HARGA PERHITUNGAN SENDIRI (HPS) 3 22-24 19-21 19-21 16-18 21-23 04-06 16-18 27-29 17-19 22-24 19-21 19-21 6.250.000
SUSTAINABLE PROCUREMENT IN RELATION WITH
18 4 16-19 06-09 06-09 03-06 22-25 05-08 03-06 31-03 04-07 16-19 06-09 04-07 7.250.000
QUALITY ASSURANCE

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
MOTIVASI DAN PERSONAL
DEVELOPMENT
1 Communication SKILL 2 08-09 14-15 15-16 12-13 07-08 25-26 12-13 06-07 13-14 08-09 15-16 13-14 4.950.000
2 Dynamic Interpersonal & Comunication Skills 2 22-23 28-01 28-29 25-26 21-22 27-28 25-26 20-21 26-27 22-23 28-29 27-28 4.950.000
3 EFFECTIVE PRESENTATION & NEGOTIATION SKILLS 2 31-01 07-08 07-08 04-05 30-31 07-08 04-05 27-28 05-06 31-01 07-08 05-06 4.950.000
4 Effective public speaking and business presentation 2 04-05 12-13 12-13 09-10 03-04 28-29 09-10 30-31 10-11 03-04 12-13 10-11 4.950.000
5 CARA MENYENANGKAN MEMBANGUN TIM IMPIAN 4 02-05 26-01 26-29 23-26 07-10 25-28 23-26 06-09 24-27 01-04 26-29 03-06 7.250.000
6 Constructive Anger Management 3 15-17 12-14 12-14 09-11 14-16 27-29 09-11 27-29 10-12 15-17 12-14 10-12 6.250.000
7 Menjadi pribadi yang asertif 3 29-31 12-14 14-16 11-13 28-30 27-29 11-13 29-31 12-14 29-31 14-16 12-14 6.250.000
8 Menjadi pribadi yang berpengaruh 3 02-04 21-23 21-23 18-20 02-04 06-08 18-20 01-03 19-21 03-05 21-23 19-21 6.250.000
9 Motivating staff for excellent performance 3 17-19 05-07 05-07 02-04 16-18 04-06 02-04 13-15 03-05 17-19 05-07 26-28 6.250.000
10 BOOST YOUR CREATIVITY IN THINKING MIND MAP 2 08-09 19-20 19-20 16-17 02-03 04-05 16-17 20-21 17-18 08-09 19-20 26-27 4.950.000
BRAIN DEVELOPMENT FOR PERSONAL ASSISTANT &
11 3 15-17 26-28 26-28 23-25 14-16 25-27 23-25 30-01 24-26 15-17 26-28 26-28 6.250.000
SECRETARY
12 EFFECTIVE MASTER OF CEREMONY (MC) 3 02-04 21-23 21-23 18-20 02-04 04-06 18-20 27-29 19-21 01-03 21-23 17-19 6.250.000
13 ACHIEVEMENT MOTIVATION 2 08-09 12-13 12-13 09-10 07-08 25-26 09-10 20-21 10-11 08-09 12-13 10-11 4.950.000
14 Advance Negotiation Skill 3 15-17 19-21 19-21 16-18 14-16 04-06 16-18 06-08 17-19 15-17 19-21 17-19 6.250.000
15 CHANGE YOUR MINDSET 4 02-05 12-15 13-16 10-13 08-11 25-28 10-13 30-02 11-14 01-04 13-16 11-14 7.250.000
16 MC (MASTER OF CEREMONY) 3 02-04 12-14 19-21 16-18 02-04 04-06 16-18 13-15 17-19 08-10 19-21 26-28 6.250.000
COMMUNICATION, ASSERTIVENESS AND CONFLICT
17 2 10-11 22-23 22-23 19-20 02-03 04-05 19-20 20-21 20-21 10-11 22-23 20-21 4.950.000
MANAGEMENT
18 INNER SUCCESS TRAINING 4 29-01 05-08 05-08 02-05 28-31 05-08 02-05 13-16 03-06 29-01 05-08 03-06 7.250.000
19 TOTOK AURA MENUJU TOTAL BEAUTY 3 03-05 19-21 19-21 16-18 02-04 06-08 16-18 13-15 17-19 03-05 19-21 17-19 6.250.000
20 SPEED AND INNOVATION 3 24-26 21-23 21-23 18-20 21-23 06-08 18-20 27-29 19-21 24-26 21-23 19-21 6.250.000
HYPNOTIC SELLING TECHNIQUE Menjual Tanpa
21 2 22-23 12-13 12-13 09-10 03-04 25-26 09-10 20-21 10-11 22-23 12-13 27-28 4.950.000
Hambatan dengan Aplikasi Hypnosis dan NLP
22 CONTEMPORARY COMMUNICATION & LEADERSHIP 3 22-24 12-14 12-14 09-11 21-23 25-27 09-11 13-15 10-12 22-24 12-14 26-28 6.250.000
23 TALENT MANAGEMENT 4 09-12 12-15 13-16 10-13 07-10 26-29 10-13 13-16 11-14 09-12 13-16 11-14 7.250.000
24 WOMENS PRIME POWER, BEAUTY AND BRAIN 2 22-23 26-27 26-27 23-24 21-22 25-26 23-24 20-21 24-25 22-23 26-27 26-27 4.950.000
25 ASSERTIVE TRAINING 3 22-24 12-14 12-14 09-11 02-04 25-27 09-11 13-15 10-12 22-24 12-14 26-28 6.250.000
26 BRAIN POWER 3 02-04 26-28 26-28 23-25 02-04 27-29 23-25 30-01 24-26 01-03 26-28 26-28 6.250.000
CAPACITY BUILDING(MEMBANGUN KAPASITAS DAN
27 3 17-19 13-15 14-16 11-13 14-16 25-27 11-13 14-16 12-14 17-19 14-16 10-12 6.250.000
KEMAMPUAN)
28 HUMAN QUOTIENS (IQ, EQ, AQ, SQ) 3 03-05 05-07 05-07 02-04 02-04 04-06 02-04 06-08 03-05 03-05 05-07 05-07 6.250.000
29 INDIVIDUAL DEVELOPMENT (SERVICE PRODUCT) 3 10-12 12-14 12-14 09-11 09-11 25-27 09-11 13-15 10-12 10-12 12-14 12-14 6.250.000
PENINGKATAN MOTIVASI BERPRESTASI(ACHIEVEMENT
30 3 22-24 13-15 14-16 11-13 23-25 25-27 11-13 30-01 12-14 22-24 14-16 10-12 6.250.000
MOTIVATION TRAINING)
31 PEOPLE SKILL 3 29-31 19-21 19-21 16-18 28-30 06-08 16-18 08-10 17-19 29-31 19-21 17-19 6.250.000
32 PRIBADI EFEKTIF 2 02-03 01-02 29-30 26-27 03-04 28-29 26-27 20-21 27-28 01-02 29-30 26-27 4.950.000
SENSITIVITY TRAINING (TURNING POINT ATAU NEW
33 3 15-17 12-14 12-14 09-11 14-16 25-27 09-11 14-16 10-12 15-17 12-14 12-14 6.250.000
BORN)
34 TEKNIK PRESENTASI 2 18-19 19-20 19-20 16-17 17-18 07-08 16-17 20-21 17-18 18-19 19-20 17-18 4.950.000
35 TRAINING OF TRAINER 3 22-24 28-02 28-30 25-27 23-25 27-29 25-27 29-31 26-28 22-24 28-30 26-28 6.250.000
36 ACHIEVEMENT MOTIVATION 3 29-31 05-07 05-07 02-04 28-30 04-06 02-04 30-01 03-05 29-31 05-07 03-05 6.250.000
37 EFFECTIVE COMMUNICATION SKILL 3 31-02 13-15 12-14 09-11 30-01 27-29 09-11 06-08 10-12 31-02 12-14 10-12 6.250.000
38 EFFECTIVE PRESENTATION SKILLS 3 03-05 19-21 21-23 18-20 02-04 06-08 18-20 14-16 19-21 01-03 21-23 19-21 6.250.000
39 EMOTIONAL QUETIENTS 3 08-10 28-02 28-30 25-27 07-09 25-27 25-27 29-31 26-28 10-12 28-30 26-28 6.250.000
40 ICE BREAKING AND ENERGIZERS 3 29-31 21-23 19-21 16-18 28-30 06-08 16-18 13-15 17-19 29-31 19-21 17-19 6.250.000
41 TRAINING OF TRAINER (TOT) 3 03-05 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 01-03 05-07 03-05 6.250.000
42 Train the trainers 4 02-05 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 02-05 19-22 18-21 7.250.000
43 ACHIEVEMENT MOTIVATION TRAINING 2 08-09 19-20 19-20 16-17 02-03 04-05 16-17 20-21 17-18 08-09 19-20 26-27 4.950.000
44 CAPACITY BUILDING SOFT SKILL PROGRAM 3 15-17 26-28 26-28 23-25 02-04 25-27 23-25 13-15 24-26 15-17 26-28 26-28 6.250.000
45 BREATHING ARTS FOR CREATIVE THINKING 3 15-17 05-07 05-07 02-04 02-04 04-06 02-04 06-08 03-05 15-17 05-07 26-28 6.250.000
46 EFFECTIVE STRATEGY TO CONTROL STRESS 3 08-10 07-09 07-09 04-06 07-09 04-06 04-06 08-10 05-07 08-10 07-09 26-28 6.250.000
47 ESQ FOR PEAK PERFORMANCE 3 24-26 21-23 21-23 18-20 23-25 06-08 18-20 29-31 19-21 24-26 21-23 26-28 6.250.000
48 HUMAN PERFORMANCE AND LIMITATION 3 31-02 28-02 28-30 25-27 30-01 27-29 25-27 01-03 26-28 31-02 28-30 26-28 6.250.000
MENGGALI POTENSI DIRI UNTUK MENCAPAI PRIBADI
49 2 15-16 19-20 19-20 16-17 17-18 07-08 16-17 20-21 17-18 15-16 19-20 17-18 4.950.000
YANG UNGGUL
50 PERFORMANCE, BEHAVIOR AND STRESS MANAGEMENT 3 08-10 21-23 21-23 18-20 07-09 06-08 18-20 14-16 19-21 08-10 21-23 19-21 6.250.000
51 MANAGING PRESSURE FOR PEAK PERFORMANCE 3 02-04 12-14 12-14 09-11 02-04 25-27 09-11 13-15 10-12 01-03 12-14 26-28 6.250.000
52 Stress Management Strategies 3 08-10 07-09 07-09 04-06 07-09 04-06 04-06 14-16 05-07 08-10 07-09 05-07 6.250.000
HYPNO-PRESENTATION SKILL UNLOCKING YOUR
53 3 17-19 07-09 07-09 04-06 16-18 06-08 04-06 08-10 05-07 17-19 07-09 26-28 6.250.000
POTENTIAL POWER
54 ICE BREAKER FOR EFFECTIVE TRAINING DELIVERY 3 24-26 13-15 14-16 11-13 23-25 27-29 11-13 14-16 12-14 24-26 14-16 12-14 6.250.000
IMPROVING PERSONAL SKILL FOR SECRETARY &
55 3 31-02 19-21 19-21 16-18 30-01 04-06 16-18 29-31 17-19 31-02 19-21 19-21 6.250.000
ADMINISTRATIVE ASSISTANT
56 SEVEN HABITS WITH NLP APPROACH 3 02-04 07-09 07-09 04-06 02-04 06-08 04-06 08-10 05-07 01-03 07-09 05-07 6.250.000
57 EMOTIONAL INTELLIGENCE FOR MENTAL ATTITUDE 3 02-04 19-21 19-21 16-18 02-04 06-08 16-18 14-16 17-19 03-05 19-21 17-19 6.250.000
58 FINDING YOUR ESSENTIAL SELF 3 15-17 05-07 05-07 02-04 14-16 04-06 02-04 01-03 03-05 15-17 05-07 03-05 6.250.000
59 INTERPERSONAL COMMUNICATION SKILL 2 08-09 08-09 08-09 05-06 10-11 04-05 05-06 20-21 06-07 08-09 08-09 06-07 4.950.000
60 DYNAMIC INTERPERSONAL & COMMUNICATION SKILLS 2 24-25 21-22 21-22 18-19 21-22 07-08 18-19 20-21 19-20 24-25 21-22 17-18 4.950.000
61 SELF-EFFECTIVENESS & DEVELOPMENT 2 02-03 14-15 12-13 09-10 02-03 25-26 09-10 20-21 10-11 01-02 12-13 13-14 4.950.000
PERSONALITY DEVELOPMENT BERBASIS EMOTIONAL
62 4 29-01 12-15 12-15 09-12 07-10 25-28 09-12 06-09 10-13 29-01 12-15 03-06 7.250.000
AND SPRITUAL QUETIENTS
63 STRESS & CONFLICT MANAGEMENT 3 31-02 26-28 26-28 23-25 30-01 27-29 23-25 01-03 24-26 31-02 26-28 26-28 6.250.000
64 BAHAGIA DAN PRODUKTIF SAAT PURNA BAKTI 5 08-12 19-23 12-16 09-13 07-11 25-29 09-13 06-10 10-14 01-05 12-16 10-14 8.950.000
CORPORATE BUILDING DALAM MEMBANGUN KULTUR
65 3 15-17 26-28 26-28 23-25 14-16 25-27 23-25 27-29 24-26 15-17 26-28 26-28 6.250.000
DAN ETIKA INTERNAL ORGANISASI
MODEL PEMBINAAN ANGGOTA YANG EXCELLENT
66 3 22-24 26-28 26-28 23-25 21-23 27-29 23-25 27-29 24-26 22-24 26-28 26-28 6.250.000
DALAM DUNIA KERJA PERUSAHAAN
67 Office COMMUNICATION AND BEHAVIOR ETHIC 3 02-04 13-15 14-16 11-13 02-04 25-27 11-13 08-10 12-14 01-03 14-16 12-14 6.250.000
CHANGE & CONFLICT MANAGEMENT AND DEALING
68 2 02-03 26-27 26-27 23-24 02-03 27-28 23-24 20-21 24-25 01-02 26-27 26-27 4.950.000
WITH DIFFICULT PEOPLE
COLLABORATION MS Office AND EFFECTIVE
69 3 02-04 21-23 21-23 18-20 02-04 04-06 18-20 08-10 19-21 01-03 21-23 17-19 6.250.000
PRESENTATION
Change & conflict management and dealing with difficult
70 2 02-03 05-06 05-06 02-03 02-03 07-08 02-03 20-21 03-04 01-02 05-06 03-04 4.950.000
people
71 Strategic and Systematic Thinking 2 29-30 08-09 08-09 05-06 28-29 04-05 05-06 20-21 06-07 29-30 08-09 06-07 4.950.000
72 THE LEADERSHIP CHALLENGE 2 02-03 14-15 15-16 12-13 02-03 28-29 12-13 30-31 13-14 01-02 15-16 13-14 4.950.000
73 COACHING & CONSELING DI PERUSAHAAN 3 24-26 21-23 21-23 18-20 21-23 06-08 18-20 29-31 19-21 24-26 21-23 19-21 7.250.000
74 COACHING AND COUNSELING ( MONITORING) 3 02-04 12-14 19-21 16-18 02-04 06-08 16-18 13-15 17-19 08-10 19-21 17-19 6.250.000
75 PERFORMANCE COACHING FOR MANAGER 2 15-16 05-06 05-06 02-03 02-03 04-05 02-03 20-21 03-04 15-16 05-06 26-27 4.950.000
76 EFFECTIVE PRESENTATION AND REPORT WRITING 3 24-26 26-28 26-28 23-25 23-25 25-27 23-25 06-08 24-26 24-26 26-28 26-28 6.250.000
77 Effective Time Management 3 31-02 05-07 05-07 02-04 30-01 04-06 02-04 13-15 03-05 31-02 05-07 03-05 6.250.000
78 HANDLING CONFLICT AND COMPLAINT EFFECTIVELY 3 08-10 19-21 19-21 16-18 02-04 06-08 16-18 30-01 17-19 08-10 19-21 17-19 6.250.000
79 Strategic Time Management 3 03-05 28-02 28-30 25-27 02-04 25-27 25-27 08-10 26-28 01-03 28-30 26-28 6.250.000
80 TIME MANAGEMENT 4 16-19 26-01 26-29 23-26 15-18 25-28 23-26 13-16 24-27 16-19 26-29 03-06 7.250.000
81 HOW TO HANDLE CRITICISM AND COMPLAIN 2 08-09 26-27 26-27 23-24 07-08 25-26 23-24 06-07 24-25 08-09 26-27 26-27 4.950.000

OFFICE :
Jl. A. M. Sangaji No. 59, Kota Yogyakarta, DIY
CONTACT :
Mobile : 0812 2656 2746/ Wa : 0878 381 96280

EMAIL :
trainingsemangatindo@gmail.com | marketing@semangatindo.com
Visit Our Website :
semangatindo.com | pusatjadwaltraining.com | infojadwaltraining.com | jadwal-pelatihan.com
pelatihanindo.com | indonesia-training.com | infojadwalpelatihan.com | trainingcenterjogja.com
CARA PEMBAYARAN
 Invoice
 Transfer Bank Negara Indonesia (BNI): SEMANGATINDO
No Rekening : 19 000 2 000 6
Kantor Cabang : UGM JOGJA

PENUTUP

Demikian Penawaran program tahun 2018 di Semangatindo Training & Consulting.


Apabila ada hal yang ingin ditanyakan, mohon kiranya menghubungi kami, Terima kasih.
Salam Semangat & Sukses

Yogyakarta, 2 January 2018


END

You might also like