You are on page 1of 7

SCHEME-1

1. Development of Commercial Horticulture through Production and Post-Harvest


Management of Horticulture Crops

1.3. Integrated Post Harvest Management projects

a) Activity (ies) allowed


The Board will take up Integrated Post Harvest Management projects relating to Pack
House, Ripening Chamber, Refer Van, Retail Outlets, Pre- cooling unit, Primary
processing etc.
NHB will also take up projects in component mode and for standalone projects of PHM
components.
b) Crops eligible: In case of primary processing, projects related to Fruits, Vegetables,
Flowers, Aromatic plants and Cashew are only eligible for subsidy.
c) Pattern of assistance: Credit linked back-ended subsidy @ 35% of the total project cost
limited to Rs 50.75 lakh per project in general area and @ 50 % of project cost limited to
Rs. 72.50 lakh per project in NE Region, Hilly States and Scheduled areas.

d) Maximum Project costs allowed for subsidy calculation.

S Item Cost Norms* Pattern of Assistance#


N
A. 3 Integrated Post Harvest Rs. 145.00 lakh per Credit linked back ended subsidy @
Management Projects e.g. project. The add-on 35% of cost limited to Rs.50.75 lakh
Pack House, Ripening components of pre- per project in general areas and @
Chamber, Refer Van, cooling, pack house, 50% of project cost limited to Rs.
Retail Outlets, Pre-cooling grading, packing, cold 72.50 lakh per project in NE Region,
units, Primary Processing room can be taken up as Hilly States and scheduled Areas,
etc. individual components. ensuring backward and forward
linkage.

Component wise cost norms of Integrated Post Harvest Management


1 Pack house Rs. 4.00 lakh/unit with 50% of the capital cost.
size of 9Mx6M
2 Integrated pack house with Rs. 50.00 lakh per unit Credit linked back-ended subsidy @
facilities for conveyer belt, with size of 9Mx18M 35% of the cost of project in general
sorting, grading units, areas and 50% of cost in case Hilly
washing, drying and States & Scheduled areas for
weighing. individual entrepreneurs.
3 Pre-cooling unit Rs. 25.00 lakh / unit with Credit linked back-ended subsidy @
capacity of 6 35% of the cost of project in general
MT. areas and 50% of cost in case Hilly
States & Scheduled areas for
individual entrepreneurs.
4 Cold room (staging) Rs. 15.00 lakh/ unit of 30 Credit linked back-ended subsidy @
MT capacity 35% of the cost of project in general
areas and 50% of cost in case Hilly
States & Scheduled areas
5 Mobile pre- cooling unit Rs. 25.00 lakh Credit linked back-ended subsidy @
35% of the cost of project in general
areas and 50% of cost in case Hilly
States & Scheduled areas
6 Ripening Chamber Rs. 1.00 lakh/MT Credit linked back-ended subsidy @
35% of the cost of project in general
(11 cum of chamber areas and 50% of cost in case Hilly
volume shall be States & Scheduled areas
equivalent of 1 MT of
storage capacity.)

7 Primary Processing of Rs. 25.00 lakh/ unit Credit linked back-ended subsidy @
Fruits, vegetables, 35% of the cost of project in general
Flowers, Aromatic plants areas and 50% of cost in case Hilly
(Distillation unit) and States, NE Region & Scheduled areas
Cashew
8 Retail Outlets Rs. 15.00 lakh/ unit Credit linked back-ended subsidy @
(Environmentally 35% of the cost of project in general
controlled) areas and 50% of cost in case Hilly
States, NE Region & Scheduled areas.
1.3.e.Technical Standards : Project should strictly comply with the prescribed Technical
standards of NCCD, else the project is not eligible for any financial assistance. The standards can
be accessed at the link http://nhb.gov.in/guideline/NCCDGuidelines2014-15.pdf

You might also like