XO-508 Escalator

Installation & Maintenance manual

EC
2010-07-13

in service
Hoistway preparative
All checks have to be done in accordance to the layout drawing!
1.Check hoistway for clearly indicated finished floor line markings and center line markings (by
contractor).
2.Check the distance between end supports, pit length, pit depth, rise and diagonals.
3.Check slab opening.
4.Check the beams or hooks placed for transport purposes.
5.Check dimensions and capacity of floor for horizontal transportation.

in service
Hoistway preparative

 Check hoistway for clearly indicated finished floor line markings and center line
markings (by contractor). In case of need modification after installation finish.

in service
Hoistway preparative
According different using environment ,there are four situation:
A: Whole escalator is installed in-door, Environment Temp:
+2℃~+40℃,Environment humidity<80%
B: A: Part of escalator is installed in-door, Environment Temp:
+2℃~+40℃,Environment humidity<80%
C: Whole escalator is installed our-door, Environment -10℃~+40℃,
Environment humidity<80 <80%
D: Whole escalator is installed our-door, Environment -25℃~+40℃,
Environment humidity<80
NOTE for situation B、 C、D:
1. Need drainage system ,
2. Pit depth add 250mm。

NO drainage system

in service
Hoistway preparative
The Cable length which will be connected with Wiring Box (Prepared
by contractor) :
 When upper machine room truss is standard(△L=0), and the power wiring
come from left side of truss L=3m。
 When upper machine room truss is standard(△L=0), and the power wiring
come from right side of truss L=1.5m。
 When upper machine room truss is un-standard( △L≠ 0), and the power
wiring come from left side of truss L=3m+un-standard length。
 When upper machine room truss is un-standard( △L≠ 0), and the power
wiring come from right side of truss L=1.5m+un-standard length。
NOTE:
1. Standing on lower machine room,
look towards upper machine room,
the right hand side is right, the left
hand side is left
2. Lay-out indicates whether there is
un-standard length of upper truss
or not。
3. △L is upper truss extend。
in service
Hoistway preparative
The Cable specification which will be connected with Wiring
Box (Prepared by contractor) :

 Power:3Phases,5 wirings

Note
If customer selects the option functions such as truss heater, handrail
heater, handrail lighting and skirt lighting and so on, the cable standard
should be increased.

in service
The truss assembly depth

The truss assembly depth not more then (MM):


1、XO-508: 125MM
2、XO21NP、X0P、XOPE:135MM

in service
Hoisting

NOTE:
Check the connecter rope of two parts truss is ok or not before hoisting

in service
Truss connection
Connect the Truss beside hoistway before hoisting the escalator in Hoistway

Structure 1:

There is marker on connecter plates, PLS connect the truss accordingly.

in service
Truss connection

 Before truss connection, need check


whether the end of truss was damaged or
not, if yes, need modify first.
Up、low beam

M20×100 bolt
 The up beam M24 connection bolt insert
form up to down
Skew Pole
 After all connection bolt installed finish, Way of bolt insert
then install skew Pole。

in service
Truss connection
Structure 2:

in service
Truss bottom plate connection

NOTE:
1. In case of leak, up bottom plate edge
fold down bottom plate edge

in service
Two parts truss Cable connection

 After truss connection finish, the cable should be connected


immediately.
 Tie the cable on skew pole。

in service
Horizontal adjustment
Adjust the truss to be horizontal after hoisted the truss.
Some escalator reduced the front plate, and the angle steel is at the
outside, so after hoisting, adjust to be horizontal. Otherwise, it can not be
adjusted after finished the floor finish.

in service
Horizontal adjustment

Adjustment
bolt total
insert
supports
angle make
for
adjustment
more easy

Tool

NOTE:
Precision of horizontal adjustment is important for escalator normal running

in service
Horizontal adjustment
 For facilitated truss leveling of
each landing, an engineer's level
has to be placed on a step.。
 Proper height alignment and
leveling to finish floor level by
turning the jackbolts up or down.
 After proper leveling, the
jackbolts have to be replaced by
shims as required.。
 In case of slight height
deviations of the finished floor level
the complete floor plate frame
(floor plate inclusive) can be

adapted to that level.。

in service
Dimensions (Slim balustrade and G-type balustrade)

Lower Landing / upper landing Incline

in service
Connection of track system
 Connect all step guide rails and
make sure all joints smooth. The gap
between each both step guide rail is
less than 0.5mm.
 After all are connected, height difference
is less than 0.2
 The welded position should be burnished
and then spray code zinc with 0.005 depth
at equal
 In order to make sure the height difference
meet requirement, elongate the pin’s distance
150-200mm when burnishing

NOTE:
The connection position is more smooth,
the running quality is better
in service
Tension carriage installation

Before starting the escalator,


adjust the length of the spring at
both sides of tension carriage,
according to the stuck tag. If no
tension of the spring, there will be
noise during the escalator running. Convenient for connect the chain,
Release brake step: we can pull the chain to the suitable
1. Power off ,do LOTO position by release brake manual
2. Dis-assembley the shell of fan
3. Use the brake handle to release brake
4. Running the fan shell sheave by manual,
pull the chain to suitable position
5. Assembly the shell of fan
in service
Connection of step chain
NOTE:
- Before connecting the step chain
ensure that the compression
springs are loosened!
- Do not pull the step chain from
the middle of the step axle.
- Pull from the chain link.
Do not walk on step axles.
Use walk platforms.
- Before installing the steps,
Inspect for potential pin damage
from the lower landing.

in service
Chain Connection
To replace the complete chain can adopt the way of connection of the new chain and
the old chain. The machine draw the chains slowly. When the old one is disassembled,
the new one is assembled.

Connect the head and the end of When adjusting escalator, jog the
Dangerous ! escalator and observe running
each transmission chain, using 1.During the chain
the connection panel A and the status of the step chain and then
connection, be careful re-adjust the spring length in order
connection panel B. And insert to assemble the
the orientation block circle to the to meet requirement.
orientation block circle. The specified spring length is as
pin’s groove beside the 2. Check whether the
connection chain. the label dimension on the angle
orientation block circle steel below
is intact when
maintenance.

Lower angle steel

in service
Tension Carriage
1.Tension carriage is below lower landing. Its function is to tension the step chain through the
roller or slide block’s guide, holding the constant tension under two compression springs.
There is one safety switch on each side of the tension carriage. Once the carriage is
abnormal, the safety switch will be activated and escalator will be stopped.
2 . A special cutout that on the step roller returns is assigned to remove steps for maintenance
or replacement. 。

Attention!
Before starting the escalator, adjust the length of the spring at both sides of tension carriage,
according to the stuck tag. If no tension of the spring, there will be noise during the escalator
running.

in service
Glass Balustrade assembly

1.Place the plastic cushion to each joint 2.Orientation mark of the glass
of the glass clamp (Bracket clamp on the lower landing is
XBA316AFY) and each glass joint. To as the basement to install the R
insert the glass balustrade successfully, section glass on the lower
depth to insert the plastic cushion is landing and then install incline
around 1/2 height of the cushion. glass, the upper R section and
the head glass in sequence as
the label on the glass.

Orientation line

in service
Glass Balustrade assembly

3. Place a piece of the glass profile (Length 30~40mm, 4. Each gap between
Rubber) in the upper gap and the lower gap of the two two pieces of glass is
pieces of glass to make sure the gap is 2~3mm. 2~3mm
►Gap of the two piece of glass have effect on the length of
handrail.

► When the glass balustrade is being installed, the glass


edge is possible to be broken without placing the glass
profile

Glass
profile

in service
Glass Balustrade assembly
horizontal ruler verification

Adjustment verticality of the glass panel. The


precision of verticality should be controlled within
2mm. If necessary, knock the holding with hammer.
The bolt should be screwed down on the both sides on
holding with spanner after adjustment. Screw down the
nut after installation the glass panel. The force
moment is 32~65N·M。

Plumb line verification Clamp bracket

in service
Glass Balustrade assembly
6. The upper and lower head supporter must not be raised up and low down during assembly

since the location mark has been made before delivery from the factory.

Height location line for the glass clip


on the upper and lower head.

in service
Handrail Guide Rail Assembly
1. Before installing the handrail guide rail,
insert the rubble profile (aluminum guide rail) or single side glue tape (stainless steel guide rail)

Single side glue tape


Rubber profile
Orientation line on the 180 degree handrail guide rail of the lower landing is as the basement
to install the lower landing 180 degree handrail guide

Orientation Line

in service
Handrail Guide Rail Assembly

3. After installing the 180 degree handrail guide rail, then install the lower R handrail, the incline section,
the upper R guide rail and the upper 180 degree handrail guide rail.

Note:
After installation, the height of the screw can't exceed the surface of the plastic sliding。
Use a joint plate to fix the Handrail guide and make sure the height difference between
two Handrail guide faces is less then 0.2mm。

in service
Handrail Guide Rail Assembly
4. Difference of all handrail guide rail’s joints between Outer edges and between heights of handrail guide rails
each need be less than 0.2MM.

All handrail guide joints


planeness &
gap≤0.2mm

in service
Handrail Guide Rail Assembly
5. After handrail guide rail, check and re-adjust the handrail to make sure the straightness within ±2 mm。

straightness≤±2mm

Notice:
1.Place the single side glue tape or the rubber profile to the each joint of the handrail guide rail and the glas
2.Before escalator comes to use, clear the visible single side glue tape or the rubber profile

in service
Skirt Panel Assembly

1.The skirt panels have been assembled in factory. If the truss is in section, field need assemble the skirt
panel of the incline section.
2. The gap between the part C and the main roller is 2±1mm

in service
Skirt Panel Assembly

1. After adjusting the skirt panel of the incline section, should ensure the connecting position smooth and
skirt panel clearance should less than 0.3mm. 。
2.Surface height difference between skirt panels ≤1.5mm。
3. The single side clearance between skirt panel and step should less than 4MM,both sides should less
than 7MM.

in service
Handrail Assembly

1.To protect the handrail belt from scratch, there must be protection during assembly. For example,
protect the handrail belt by paper, wooden board and other suitable material.
Then extend the handrail belt on the steps.

2. Assemble the handrail beggin with the upper circle section. After assembly of the upper circle section

drag the handrail downward to assemble the complete handrail on the handrail guide rail

3. When handrail is pressed to the handrail guide rail, the hook made from wooden and rubber can be used.。

in service
Handrail Assembly
The adjustment of handrail guide and handrail :
1. The gap between guide device and the internal surface of handrail should be not

less than0.5 mm to prevent the internal surface of handrail from being destroyed

≥0.5 mm

Return rail of upper and lower landing and the handrail should be collinear to prevent
The side of handrail from being destroyed.

Guide device

in service
Handrail Assembly
Adjustment of handrail and roller group:
1.Move the upper roller group to left or right or make small amount of rotation

to ensure there is not evident emboss on the bend of handrail.

in service
handrail installation

Adjusting between the handrail and deflector sheave:


1.Move the deflector sheave to left or right to ensure the gap between the
deflector sheave and handrail is not less than 0.5mm; move the deflector
sheave up and down to ensure the gap between the deflector sheave and
handrail is inside 0.5mm~2mm.

in service
handrail installation
Handrail drive force adjustment
Handrail drive force have a essential effect on the life time of related drive parts, too much
force make the friction parts wear out quickly, and the escalator does not work under too
small force. Adjust the spring according to requirement shown in the table below in the
installation phase.
Handrail drive wheel

Handrail

Spring
Roller Handrail pressure chain

After adjusting the spring length, should check all rollers of the handrail pressure chain
fully touch the handrail and make sure all rollers are running when the escalator is running

in service
handrail installation
Tension standard:
After handrail up running 2~3 circles, the down distance should be 8~12mm
in the middle position of the guidance parts besides(1160 mm )

Handrail tension adjusting method1:


Adjust handrail tension by moving lower roller group left or right.

Lower roller group


Handrail Handrail drive wheel

in service
handrail installation
Handrail tension adjusting method 2:
Adjust handrail tension by moving tension device up or down.

in service
handrail installation
Deflection standard:
Look into the positions of handrail and friction wheel to sure the distance
between handrail lip and friction wheel is small than 2mm. The position of upper
roller bow already be adjusted and fixed in company. If the handrail running
deflection when escalator running, the upper roller bow must be adjusted by
professional.

in service
handrail installation
handrail running deflection adjusting
If the handrail running deflection when escalator up running, adjust the nut at
upper roller group. Turn the globe washer to the reverse direction of deflection
and the handrail will run smoothly. After adjustment, screw downs the nut.

in service
handrail installation

If the handrail running deflection when escalator down running, adjust the nut
at lower roller group. Turn the globe washer to the reverse direction of deflection
and the handrail will run smoothly. After adjustment, screw downs the nut.

in service
handrail installation

Using the Handrail


If handrail is not put into service temporary after installed and adjusted, so the
user must running 1~2 hours every week.

If the escalator is not in using temporary please release the spring

in service
handrail installation

If handrail is not put into service long time, so handrail should be take down
and pack with black film. The curve radius of handrail is more than 300mm.
Handrail doesn’t place at the escalator being tension condition.

in service
Assembly of handrail entry and decking

1. Assemble the S-profile and the GAA72BT nut in position according to the figure below.

2. Insert the outer deck to S-profile as the figure below and use the M4 bolt to fix this
outer deck.

in service
Assembly of handrail entry and decking

When the escalator using the sheet stainless shell it should add the S-profile.

Slim balustrade: alloy shell Slim balustrade: st.steel shell

in service
Assembly of handrail entry and decking

3. According to the shirt panel at terminal to install inner decking. After finishing inner
decking installation then install the front panel. Install the outer decking at last and
it should be refer to the inner decking. The installation error should be less than
0.2mm.

in service
Assembly of handrail entry and decking
Checking and adjusting the handrail entry after installation finished
1.Check the gaps between the handrail and cover, they shouldn’t be touched when
escalator in running.
2. Inner and outer decking should line to front panel and the gaps should less than
0.5mm
3.Check the gaps between the handrail and entry switch, if the gas less than 2mm.
Please rise the glass panel to solve the problem.

cover

≤0.5mm

in service
Assembly of handrail entry and decking
decking installation:
1.Acoording to the skirt panel at terminal to install the outer decking down side
Then install the outer decking upside.
2. Using the XAA124G bolt to fix up the inner and outer decking.

in service
Assembly of handrail entry and decking
Decking installation:
3. Install the inner and outer decking as per the picture below.
4. The gap between inner and outer decking should not be wider than 0.3mm,
the height difference should not be over 0.3mm and the distance between
screw head and decking face should not be over 0.5mm.

NOTE:
Inner and outer decks are used to close and deck the escalator. So when install the decking,
you should not knock on it with hard object and make it transmogrification. Decking to decking
bonder upon should be in one lever, and without gap.

in service
Assembly of handrail entry and decking

If the gap between the inner and outer decking is over 0.3mm,
Please file it smooth to fit the standard.

Outer decking

Inner decking

in service
Assembly of multifunction pole (option configuration)

Single escalator layout:

in service
Assembly of multifunction pole (option configuration)

juxtaposition escalator layout:

in service
Assembly of multifunction pole (option configuration)

NOTE:
1. Dimension in the bracket is as suggestion. Adjust them according to the actual requirement.
2. Regarding the upper two kinds of layout, the installation direction of the multifunction pole
and the traffic flow light is the same.
3.The decoration’ thickness on the concrete ground should not be more than 55MM.

in service
Assembly of floor plates
NOTE:please install the floor plates before the floor finish.
up
Adjustable
bolt

Left Right in line

Connect
plate  The veins of Stainless steel floor plate
down should be the same as the comb plate.
 The gap between the floor plates should
gap≤0.5MM be ≤0.5mm.
 The altitude difference between the
floor plates should be ≤0.5mm.
 The altitude difference between the
floor plates and the side frame should
be ≤0.5MM。
 The gap between the floor plates and
Altitude difference
Altitude difference side frame should be ≤1mm.
≤0.5MM
≤0.5MM
in service
Step and comb adjustment

Note:
1 . Run the escalator in inspect ion speed to adjust steps, observe the state of steps.
The center of groove and teeth of each other should be in line , the tolerance
should be less than 1 mm, otherwise, run the elevator to right position of lower
landing, and readjust . Repetition above steps, until all the tolerance less than
1 mm between steps.
2.Examine the center of comb and teeth groove of tread. If not coincide, Comb
Plate can be pushed gently towards left or right to ensure that the center
superposition between comb and teeth groove of tread.

in service
Safety switch
Safety equipment position:
1Emergency stop button and starting key switch
2 Handrail entry safety device
3 Broken step chain safety device
4 Comb plate safety device
5 Main circuit breaker
6 Missing step device
7 Non reversal device
(Electrical device, located on the machine)
8 Motor overheat protection device
9 Protection switch of the fan’s cover
10 Sockets for manual inspection box
11 Broken step safety device
12 Auxiliary brake (Rise>6 m)
13 Ground connection (controller)
14 Phase relay in controller
15 Main drive chain safety device (Rise>6 m)
16 Floor plate control protect switch

in service
Safety switch

Option safety switch :


1. Auxiliary brake (Rise ≤ 6 m)
2. Safety device for lifted brake
3. Safety device for brake lining wear.
4. Over speed governor (mechanism)
5. Main drive chain safety device (Rise ≤ 6 m)
6. Skirt panel safety device
7. Handrail speed monitoring device
8. Step lighting
9. Traffic flow light
10. Handrail speed monitoring device
11. Inverter alarm
12. water level monitoring device

in service