13 May 2015
Strictly Private
and Confidential
12 May 2015
Present Power Scenario of India
Total installed capacity of 263.66 GW and RE capacity of 34.35 GW (13% of Installed
capacity and approximately 7% of electricity produced) (as on March 2015)
Diesel Nuclear
0 5%
0.5% 2 2%
2.2%
Gas Hydro
8.7% 15.5% RES Wind
0 0%
0.0% 8.6%
RE
13.1%
SHP
1.5%
Biomass
0.5% Bagasse Cogen
Coal 1.1%
60 1%
60.1%
Solar
1.3%
Feed in
States have formulated T iff
Tariffs ¾ Key
K iinstrument
t t for
f
RE policies and have
success of wind
added significant
Accelerated ¾ Also exists for of solar,
capacities State RE
Depreciation biomass projects
Policies
(AD)
Support for
RE
GEF National Workshop in India, MNRE ¾ Excise & Custom duty exemptions for 13 April, 2015
most of the Equipment, Machinery etc. 4
¾ 10 year tax holiday
Policy and Regulatory Framework for RE development (1)
0 Wind Power
2007 2008 2009 2010 2011 2012 2013 2014 2015
Capacities in MW
Source Installed capacity by Current installed Target as per 12th Revised Targets
end of 11th Plan Capacity Plan till 2022
(M h 2012)
(March (M h 2015)
(March (M h 2017)
(March
Solar Power 941 3,383 10,941 1,00,000
Wind power 17,352 22,645 32,352 60,000
Biomass Power 3,225
, ,
4,183 6,125
, 10,000
,
Small Hydro 3,395 4,025 5,495 5,000
Workshop on the India Energy Outlook • MNRE 13 April, 2015
TOTAL 24,914 34351 54,914 1,75,0007
RPO revision with scale up plans
Targets Previously:
Solar Power as per NTP
RE power as per NAPCC
4.00% 3.00%
20% 15%
10% 1.25%
10% 5% 2.00%
0 25%
0.25%
0% 0.00%
2009-10 2014-15 2019-20 2011-12 2016-17 2021-22
N
New Vi
Vision:
i
175 GW by 2022
Installed capacity RE installed capacity • Solar 100 GW
Capacity stands
sta ds at 3
34.5
5GGW of 142.3GW
o 3G by 20200 0 • Wind 60 GW
3500000 1000000
Estimated Power Requirement till 2030
900000
3000000
755719 800000
2500000 700000
600000
2000000
MW
MU
500000
434900
1500000
400000
1000000 300000
200000
500000
100000
0 0
RPO (%)
10.27%
100000
MW
100000 10.00%
8.38%
80000 7.24% 7.26% 8.00%
59759
60000 6 00%
6.00%
40000 4.00%
17000
20000 2.00%
0 0 00%
0.00%
2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
(p) (p) (p) (p) (p) (p) (p) (p)
Installed Solar Capacity (MW) Installed renewable capacity (MW) RPO
4370
MW Growth path
913
2549 17352
35 MW 22645
6 5 MW 32352
3 35 MW 60000 MW
MW
MW
35 7394
MW MW 2011-12
2011 12 2014-15
2014 15 2016-17
2016 17 2021-22
2021 22
142
MW
12
10.95
10 12.16 9.39
8 98
8.98
8.5 8.25 8.05
7.94 8.057.9
8 6.9
7.49 8.34 6.97 7.04 7.12
8.79 7.0 8.03 6.45 6.47 6.71 6.46
8.36 5.97 6.17
6 55
5.5 6 72
6.72
6.48 6.45 6.86 6.76 6.94
6.87
4
NSM Batch NSM Orissa, Karnataka, Madhya Tamil Rajasthan Madhya Karnataka, Andhra Karnataka Telangana
1,, Dec'10 Batch2,, Mar'12 Apr'12
p Pradesh,, Nadu Apr'13
p 3 Pradesh,, Apr'14
p 4 Pradesh Oct'14
4 Nov'14
4
Dec'11 Jun'12 Mar'13 Jan 14 Phase 2
• A l i off ttariffs
Analysis iff suggestt grid
id parity
it 3 years from
f now, as against
i t anticipated
ti i t d in
i 2022 (JNNSM)
• Workshop
CERC on solar PVEnergy
the India tariffsOutlook
are Rs 6.91/kWh and Rs.7.72/kWh with and without accelerated depreciation
• MNRE 13 April, 2015
13
benefit respectively for the FY 2014-15
Solar Scale-up Plans- 100 GW Vision
Category 1. Rooftop Projects Category 2. Large scale Projects
Inside Solar park Outside Solar Park
40,000 MW 20,000 MW 40,000 MW
120 C
Cumulative
l ti Solar
S l Targets
T t (GW)
100
80
60
60 51.5 Large scale solar
42 Roof-top
40
32
20 22 40
6 12 23 31
10 16
0 1 5
Workshop on the India Energy Outlook • MNRE 13 April, 2015
2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 14
40 GW through grid connected rooftop
Updates:
p
• 14 States have rooftop provisions in their Solar Policy and 20 States/UTs have notified regulations
• Rooftop included under IPDS and guidelines issued
• G id li
Guidelines iissued
d tto iinclude
l d rooftop
ft under
d h housing
i lloan and
d9b
banks
k have
h iissued
d iinstructions
t ti
• Central Electricity Authority (CEA) has notified technical standards for connectivity and metering
I IIndia
In di market
k t potential
t ti l ffor rooftop
ft SPV is
i 124 GW
GW.
GW
352
210
124
4
4. World Bank loan to developer (50%) 35 lakh
5. Electricity generation per year 1.50 lakh unit
6
6. Revenue generation per year Rs 10 56 lakh
Rs.10.56
@Rs.7.04 per unit *
(CERC rate for 2015-16)
Sl.
Sl Parameter Value
No.
7
7. Revenue generation per month Rs. 88,
Rs 88 000/-
8. Simple payback period (2÷6) 6.62 year
9
9. EMI for world Bank/ADB Rs 33,447/
Rs. 33 447/-
(8%, 15 yr, Rs. 35 lakh)
10 EMI for balance 50% equity/borrowing Rs 42,000/
Rs. 42 000/-
(12%, 15 yr, Rs. 35 lakh)
11. Total EMI payment by developer Rs. 75,447/
75,447/-
12. Net saving per month to developer (7- Rs. 12,553/-
Higher
11)) tariff could also be available
*Higher for
developer
20 GW through Solar park and UMPPs
17 Parks (12 states) with capacity 12,759 MW approved and request received for 5 more parks
Punjab Uttarakhand
500 + 500 MW 39 MW
UP
Rajasthan: Bhadla II • 600 MW
700 MW Meghalaya
20 MW
Rajasthan: Bhadla III
andd Jaisalmer
J i l
1000 + 1000 MW
Gujarat
j
700 MW AP: Kurnool
1000 MW
MP
750 + 750 MW
AP: Anantpur
1500 MW
Karnataka
Telangana
2000 MW
1000 MW
Kerala
Workshop on the India Energy Outlook • MNRE
Tamil Nadu
13 April, 2015
16
200 MW 500 MW
20 GW from Unemployed youth, MSME, Gram panchayats
Scheme
Key Benefits
• Utilization of sub-stations with spare capacities & additional power for states
• Employment to almost 20
20,000
000 unemployed youth
• Additional grant from states will bring down the cost of power
Workshop on the India Energy Outlook • MNRE 13 April, 2015
17
11.3 GW through Grid connected (VGF+NVVN)
13 April, 2015
GEF National Workshop in India • MNRE 18
Punjab Engineering College, Sector – 1, Chandigarh
S
Sheraton C
Chola, C
Chennai ((10,000 liter/day)
/ )
Tarun Kapoor,
Joint Secretary,
Secretary MNRE