Leakges in Chinchughat (Jakkula Ravindar)
Leakges in Chinchughat (Jakkula Ravindar)
Deductions
Add / Releases :
Page 2 of 7
Sl. OHBR / Pipe
From To Class Chainage Qty Remarks
No. Mandal Dia
20 Chichughat Chinnasalfalguda ohsr jn Jamuldhari ohsr 75 12.5kg 1646 1 HDPE to GI Conection at Ohsr
21 Molalgutta Lohara ohsr jn Lohara ohsr 75 12.5kg 63 1 HDPE to GI Conection at Ohsr
22 Molalgutta Jamuguda ohsr jn Jamuguda ohsr 75 12.5kg 126 1 HDPE to GI Conection at Ohsr
23 278 1 Middile joint leakage
Molalgutta lohara ohsr jn harijanguda ohsr jn 75 12.5kg
24 442 1 Middile joint leakage
25 Molalgutta harijanguda ohsr jn harijanguda ohsr 75 12.5kg 0 1 Branch T Leakage
26 Molalgutta chilatiguda jn salaiguda ohsr jn 75 12.5kg 1190 1 Middile joint leakage
27 Molalgutta chilatiguda jn salaiguda ohsr jn 75 12.52kg 1199 1 Middile joint leakage
28 Molalgutta Molala gutta 1 ohsr jn Molala gutta 1 ohsr 75 12.5kg 0 1 Branch T Leakage
29 Molalgutta darloddhi-(k) ohsr jn darloddhi-(k) ohsr 75 6kg 225 1 Middile joint leakage
30 Molalgutta darloddhi-(k) ohsr jn darloddhi-(k) ohsr 75 6kg 278 1 Middile joint leakage
31 Molalgutta Darloddhi-(k) ohsr jn Darloddhi-(k) ohsr 75 6kg 350 1 Middile joint leakage
32 Molalgutta Pothaguda ohsr 1 jn Pothaguda 2 ohsr jn 75 6kg 3 1 Middile joint leakage
33 35 1 Middile joint leakage
34 561 1
35 Molalgutta chisdari x-road jn sevadas nagar ohsr jn 90 12.52kg 682 1
HDPE to MS Conection
36 741 1
37 785 1
38 Molalgutta Boring guda ohsr jn Boring guda ohsr 75 12.5kg 11 1 HDPE to GI Conection at Ohsr
39 Molalgutta Hattigutta ohsr jn Hattigutta ohsr 75 12.5kg 119 1 HDPE to GI Conection at Ohsr
40 Molalgutta kolamguda(khanapur)ohsr jn kanapur ohsr 75 12.5kg 3 1 Sluive valve washer leakage
41 Molalgutta Kolamguda (khanapur) ohsr jn khanapur ohsr 75 12.5kg 6 1 HDPE to GI Conection at Ohsr
42 Molalgutta kolamguda(khanapur)ohsr jn kolamguda(khanapur)ohsr 75 12.5kg 2 1 Sluive valve washer leakage
Total 42
Page 3 of 7
Sl. OHBR / Pipe
From To Class Chainage Qty Remarks
No. Mandal Dia
Prepared By Checked By
Page 4 of 7
Megha Engineering & Infrastructures Ltd
Adilabad Water Grid, Nirmal (Adilabad Sub-Segment)
Contractor Name : Jakkula Ravinder
Name of work: Gapclosing of HDPE Pipeline 110mm Dia to 200mm Dia
Bill Period: 01.05.18 to 30.09.18 Date: 10.04.2019
1 Adilabad Collector chowk jn Tailors colony ohsr 140 10kg 614 1 Joint leakage
2 Adilabad Collector chowk jn Tailors colony ohsr 140 10kg 647 1 Joint leakage
3 Adilabad Collector chowk jn Tailors colony ohsr 140 10kg 666 1 Joint leakage
4 Adilabad Collector chowk jn Tailors colony ohsr 140 10kg 712 1 Joint leakage
5 Adilabad Collector chowk jn Tailors colony ohsr 140 10kg 988 1 Joint leakage
6 Adilabad Collector chowk jn Tailors colony ohsr 140 10kg 1163 1 Joint leakage
7 Adilabad Collector chowk jn Tailors colony ohsr 140 10kg 1247 1 Joint leakage
8 Adilabad Collector chowk jn Tailors colony ohsr 140 10kg 1501 1 Joint leakage
9 Molalgutta Darloddhi-(k) ohsr jn Kandala Thanda ohsr jn 140 6kg 258 1 Joint leakage
10 Molalgutta Darloddhi-(k) ohsr jn Kandala Thanda ohsr jn 140 6kg 802 1 Joint leakage
Total 10
Prepared By Checked By
Page 5 of 7
OHSR Conections
S.NO Date From To
1 11/10/2018 Pendarloddhi ohsr jn Pendarloddhi ohsr
2 11/10/2018 Chinnasalfalguda ohsr jn Jamuldhari ohsr
3 11/10/2018 Lohara ohsr jn Lohara ohsr
4 11/10/2018 Jamuguda ohsr jn Jamuguda ohsr
5 11/26/2018 Hattigutta ohsr jn Hattigutta ohsr
6 11/26/2018 Boring guda ohsr jn Boring guda ohsr
7 11/18/2018 Kolamguda (khanapur) ohsr jn khanapur ohsr