You are on page 1of 30

PERHITUNGAN PELAT

PELAT ATAP

Perhitungan Tebal Plat

Bentang pendek Lx = 4,00 m

Bentang panjang Ly = 4,50 m

𝐿𝑦 4,50
β = = = 1,125 m
𝐿𝑥 4,00

Fy = 320 Mpa

Fc’ = 27 Mpa

fy fy
Ln (0,8 + ( ) Ln (0,8 + ( )
1500 1500
h min = h max =
36 + (9 x β) 36

320 320
4500 (0,8 + ( ) 4500 (0,8 + ( )
1500 1500
= =
36 + (9 𝑥 1,125) 36

= 98,8618 mm → 10 cm = 126,6667 mm → 13 cm

Dicoba = 11 cm

Tulangan rencana = 10 mm

Tebal selimut beton = 20 cm (SNI 3 tahun 2002 pasal 9.7.3.3)

dx = h–p–½Ø dy = h–p–½Ø- Ø
= 110 – 20 – ½ 10 = 110 – 20 – ½ 10-10
= 85 mm = 75 mm

Perhitungan Beban Plat

Beban Mati(WD) (Standar PMI 1970 Pasal 2.1)

Berat sendiri Plat = 2400kg/m3 x 0,12 =288 kg/m2


Berat spesi = 2100kg/m3 x 0,02 = 42 kg/m2

STRUKTUR BETON BERTULANG | 1


Berat plafon = = 18 kg/m2 +
= 348 kg/m2

BebanHidup (WL) (Standar PMI 1970 Pasal 2.1)


Berathidup =100 kg/m2

Kombinasipembebanan

Wu = 1,2 WD + 1,6 WL

= 1,2 x 348 + 1,6 x 100

= 577,6 Kg/m²

= 5,78kN/m²

PERHITUNGAN MOMEN (Tabel Gideon 4.3.b)

𝐿𝑦
= 1,125 m < 2 m → 2 arah
𝐿𝑥

MLX = 0,001 .wu .Lx2 .x


= 0,001 .5,78. 4,002 . 46,5
= 4,3003 KN /m2
Mtx = 0,001 .wu .Lx2 .x
= 0,001 .5,78. 4,002 . (-15,625)
= -1,4450 KN/ m2
MLy = 0,001 .wu .Lx2 .x
= 0,001 .5,78. 4,002 . 36
= 3,3293 KN /m2
Mty = 0,001 .wu .Lx2 .x
= 0,001 .5,78. 4,002 . (-16,25)
= -1,5028 KN/ m2

PERHITUNGAN TULANGAN ARAH X


Momen Lapangan
MLX = 4,3003 KN /m2
Mu 4,3003
= = 595,1972KN/m2
b d2 1 𝑥 0,0852

Dari tabel 5.1.i

STRUKTUR BETON BERTULANG | 2


Mu
= 500  = 0,0017
b d2
Mu
= 600  = 0,0020
b d2
Mu
=595,197 diinterpolasi
b d2
95,1972
 = 0,0017+ (0,0020 – 0,0017)= 0,00199
100
1,4 1,4
min = 𝑓𝑦 = 320 = 0,0044

(0,85 × fc × β) 𝑥 600
b =
fy (600 + fy)
(0,85 ×27 × 1,125) 𝑥 600
=
320 (600 + 320)

= 0,0526
max = 0,75 x b = 0,75 x 0,0526 = 0,039
Syarat →  <  min
∴ dipakai  min = 0,0044
As =  x b x d
= 0,0044 x 1000 x 85
= 374 mm2
Dipakai tulangan Ø10 – 200 ( 393 mm2 ) (tabel Gideon 2.2a)

Cek Mu <ØMn
𝐴𝑠 𝑥 𝐹𝑦
a =
0,85 𝑥 𝐹𝑐 𝑥 𝑏
393 𝑥 320
=
0,85 𝑥 27 𝑥 1000

= 5,4797 mm
𝑎
ØMn = 0,85 x As x Fy x (d - 2)
5,4797
= 0,85 x 393 x 320 x (85 – )
2
= 8793,2810 Kg /m2
Mu (430,03 Kg /m2) <ØMn (8793,2810 Kg /m2) AMAN

MomenTumpuan
Mtx= -1,4450 KN /m2

STRUKTUR BETON BERTULANG | 3


Mu 1,4450
= = 200 KN/m2
b d2 1 𝑥 0,0852

Dari tabel 5.1.i


Mu
= 200  = 0,0007
b d2

 = 0,0007
1,4 1,4
min = 𝑓𝑦 = 320 = 0,0044
(0,85 × fc × β) 𝑥 600
b =
fy (600 + fy)
(0,85 ×27 × 1,125) 𝑥 600
=
320 (600 + 320)

= 0,0526
max = 0,75 x b = 0,75 x 0,0526 = 0,039
Syarat →  <  min
∴ dipakai  min = 0,0044
As =  x b x d
= 0,0044 x 1000 x 85
= 374 mm2
Dipakai tulangan Ø10 – 200 ( 393 mm2 ) (tabel Gideon 2.2a)
Cek Mu <ØMn
𝐴𝑠 𝑥 𝐹𝑦
a =
0,85 𝑥 𝐹𝑐 𝑥 𝑏
393 𝑥 320
=
0,85 𝑥 27 𝑥 1000

= 5,4797 mm
𝑎
ØMn = 0,85 x As x Fy x (d - )
2
5,4797
= 0,85 x 393 x 320 x (85 – )
2
= 8793,2810 Kg /m2
Mu (-144,50 Kg /m2) <ØMn (8793,2810 Kg /m2) AMAN

STRUKTUR BETON BERTULANG | 4


PERHITUNGAN TULANGAN ARAH Y
Momen Lapangan
MLy= 3,3293 KN /m2
Mu 3,3293
2
= = 591,8756 KN/m2
bd 1 𝑥 0,0752

Dari tabel 5.1.i


Mu
= 500  = 0,0017
b d2
Mu
= 600  = 0,0020
b d2
Mu
= 591,8756 diinterpolasi
b d2
91,8756
 = 0,0017 + (0,0020 – 0,0017)
100
= 0,00198
1,4 1,4
 min = = = 0,0044
𝑓𝑦 320
(0,85 × fc × β) 𝑥 600
b =
fy (600 + fy)
(0,85 ×27 × 1,125) 𝑥 600
=
320 (600 + 320)

= 0,0526
max = 0,75 x b = 0,75 x 0,0526 = 0,039
Syarat →  <  min
∴ dipakai  min = 0,0044
As =  x b x d
= 0,0044 x 1000 x 75
= 330 mm2
Dipakai tulangan Ø10 – 225 (349 mm2) (tabel Gideon 2.2a)
Cek Mu <ØMn
𝐴𝑠 𝑥 𝐹𝑦
a =
0,85 𝑥 𝐹𝑐 𝑥 𝑏
349 𝑥 320
=
0,85 𝑥 27 𝑥 1000

= 4,8662 mm
𝑎
ØMn = 0,85 x As x Fy x (d - 2)

STRUKTUR BETON BERTULANG | 5


4,8862
= 0,85 x 349 x 320 x (75 – )
2
= 6887,6814Kg /m2
Mu (332,93 Kg /m2) <ØMn (6887,6814Kg /m2) AMAN

Momen Tumpuan
Mty= -1,5028 KN /m2
Mu 1,5028
= = 267,1644 KN/m2
b d2 1 𝑥 0,0752

Dari tabel 5.1.h


Mu
= 200  = 0,0007
b d2
Mu
= 300  = 0,0011
b d2
Mu
= 267,1644 diinterpolasi
b d2
67,1644
 = 0,0007 + (0,0011– 0,0007)
100
= 0,0010
1,4 1,4
min = = = 0,0044
𝑓𝑦 320
(0,85 × fc × β) 𝑥 600
b =
fy (600 + fy)
(0,85 ×27 × 1,125) 𝑥 600
=
320 (600 + 320)

= 0,0526
max = 0,75 x b = 0,75 x 0,0526 = 0,039
Syarat →  <  min
∴ dipakai  min = 0,0044
As =  x b x d
= 0,0044 x 1000 x 75
= 330 mm2
Dipakai tulangan Ø10 – 225 (349 mm2) (tabel Gideon 2.2a)
Cek Mu <ØMn
𝐴𝑠 𝑥 𝐹𝑦
a =
0,85 𝑥 𝐹𝑐 𝑥 𝑏

STRUKTUR BETON BERTULANG | 6


349 𝑥 320
=
0,85 𝑥 27 𝑥 1000

= 4,8662 mm
𝑎
ØMn = 0,85 x As x Fy x (d - 2)
4,8862
= 0,85 x 349 x 320 x (75 – )
2
= 6887,6814Kg /m2
Mu (-150,28 Kg /m2) <ØMn (6887,6814Kg /m2) AMAN

STRUKTUR BETON BERTULANG | 7


PELAT LANTAI 1

Perhitungan Tebal Plat

Bentang pendek Lx = 4,00 m

Bentang panjang Ly = 4,50 m

𝐿𝑦 4,50
β = = = 1,125 m
𝐿𝑥 4,00

Fy = 320 Mpa

Fc’ = 27 Mpa

fy fy
Ln (0,8 + ( ) Ln (0,8 + ( )
1500 1500
h min = h max =
36 + (9 x β) 36

320 320
4500 (0,8 + ( ) 4500 (0,8 + ( )
1500 1500
= =
36 + (9 𝑥 1,125) 36

= 98,8618 mm → 10 cm = 126,6667 mm → 13 cm

Dicoba = 11 cm

Tulangan rencana = 10 mm

Tebal selimut beton = 20 cm (SNI 3 tahun 2002 pasal 9.7.3.3)

dx = h–p–½Ø dy = h–p–½Ø- Ø
= 110 – 20 – ½ 10 = 110 – 20 – ½ 10-10
= 85 mm = 75 mm

STRUKTUR BETON BERTULANG | 8


Perhitungan Beban Plat

Beban Mati (WD) (Standar PMI 1970 Pasal 2.1)


Berat sendiri Plat = 2400kg/m3 x 0,12 =288 kg/m2
Berat keramik = 2400kg/m3x 0,01 = 24 kg/m2
Berat spesi = 2100kg/m3 x 0,02 = 42 kg/m2
Berat plafon = = 18 kg/m2 +
= 372 kg/m2
Beban Hidup (WL) (Standar PMI 1970 Pasal 2.1)
Berat hidup =200 kg/m2

Kombinasi pembebanan (SK SNI T-15-1991-03 3.2.2.1)

Wu = 1,2 WD + 1,6 WL

= 1,2 x 372 + 1,6 x 200

= 766,4 Kg/m2

= 7,664 KN/m2

PERHITUNGAN MOMEN (Tabel Gideon 4.3.j)

Ly
= 1,125 m < 2m → 2 arah
Lx

MLX = 0,001 .wu .Lx2 .x


= 0,001 .7,664. 4,002 . 40
= 4,9050 KN /m2
Mtx = 0,001 .wu .Lx2 .x
= 0,001 .7,664. 4,002 . (-84,75)
= −10,3924 KN/ m2
MLy = 0,001 .wu .Lx2 .x
= 0,001 .7,664. 4,002 . 28
= 3,4335 KN /m2
Mty = 0,001 .wu .Lx2 .x
= 0,001 .7,664. 4,002 . (-14,25)
= − 1,7474 KN/ m2

STRUKTUR BETON BERTULANG | 9


PERHITUNGAN TULANGAN ARAH X
Momen Lapangan
MLX = 4,9050 KN /m2
Mu 4,9050
2
= = 678,8927KN/m2
bd 1 𝑥 0,0852

Dari tabel 5.1.i


Mu
= 600  = 0,0020
b d2
Mu
= 700  = 0,0024
b d2
Mu
= 678,8927 diinterpolasi
b d2
78,8927
 = 0,0020 + (0,0024 – 0,0020)
100

= 0,0023
1,4 1,4
 min = = = 0,0044
𝑓𝑦 320

Syarat →  <  min


∴ dipakai  min = 0,0044
As =  x b x d
= 0,0044 x 1000 x 85
= 374 mm2
Dipakai tulangan Ø10 – 200 (393 mm2 ) (tabel Gideon 2.2a)
Cek Mu < ØMn
𝐴𝑠 𝑥 𝐹𝑦
a =
0,85 𝑥 𝐹𝑐 𝑥 𝑏
393 𝑥 320
=
0,85 𝑥 27 𝑥 1000

= 5,4797 mm
𝑎
ØMn = 0,85 x As x Fy x (d - 2)
5,4797
= 0,85 x 393 x 320 x (85 – )
2
= 8793,2810 Kg /m2
Mu (490,50 Kg /m2) <ØMn (8793,2810 Kg /m2) AMAN

STRUKTUR BETON BERTULANG | 10


Momen Tumpuan
Mtx= −10,3924KN /m2
Mu 10,3924
= = 1438,3945KN/m2
b d2 1 𝑥 0,0852

Dari tabel 5.1.i


Mu
= 1400  = 0,0048
b d2
Mu
= 1500  = 0,0052
b d2
Mu
= 1438,3945 diinterpolasi
b d2
38,3945
 = 0,0048 + (0,0052 – 0,0048)
100
= 0,0050
1,4 1,4
min = = = 0,0044
𝑓𝑦 320
(0,85 × fc × β) 𝑥 600
b =
fy (600 + fy)
(0,85 ×27 × 1,125) 𝑥 600
=
320 (600 + 320)

= 0,0526
max = 0,75 x b = 0,75 x 0,0526 = 0,039

Syarat → min <  < max


∴dipakai  = 0,0050
As =  x b x d
= 0,0050 x 1000 x 85
= 425 mm2
Dipakai tulangan Ø10 – 175( 449 mm2 ) (tabel Gideon 2.2a)
Cek Mu < ØMn
𝐴𝑠 𝑥 𝐹𝑦
a =
0,85 𝑥 𝐹𝑐 𝑥 𝑏
449 𝑥 320
=
0,85 𝑥 27 𝑥 1000

= 6,2606 mm
𝑎
ØMn = 0,85 x As x Fy x (d - 2)
6,2606
= 0,85 x 449 x 320 x (85 – 2
)

STRUKTUR BETON BERTULANG | 11


= 9998,5827 Kg /m2
Mu (-1039,24 Kg /m2) <ØMn (9998,5827 Kg /m2) AMAN

PERHITUNGAN TULANGAN ARAH Y


Momen Lapangan
MLy= 3,4335 KN /m2
Mu 3,4335
= = 610,4000 KN/m2
b d2 1 𝑥 0,0752

Dari tabel 5.1.i


Mu
= 600 →  = 0,0020
b d2
Mu
= 700 →  = 0,0024
b d2
Mu
= 610,4000 → diinterpolasi
b d2
10,4000
 = 0,0020 + (0,0024 – 0,0020)
100

= 0,00204
1,4 1,4
 min = = = 0,0044
𝑓𝑦 320

Syarat→  <  min


∴dipakai  min = 0,0044
As =  x b x d
= 0,0044 x 1000 x 75
= 330 mm2
Dipakaitulangan Ø10 – 225 (349 mm2 ) (tabel Gideon 2.2a)
Cek Mu < ØMn
𝐴𝑠 𝑥 𝐹𝑦
a =
0,85 𝑥 𝐹𝑐 𝑥 𝑏
449 𝑥 320
=
0,85 𝑥 27 𝑥 1000

= 6,2606 mm
𝑎
ØMn = 0,85 x As x Fy x (d - 2)
6,2606
= 0,85 x 449 x 320 x (75 – )
2

= 8777,3027 Kg /m2

STRUKTUR BETON BERTULANG | 12


Mu (343,35 Kg /m2) <ØMn (8777,3027 Kg /m2) AMAN

MomenTumpuan
Mty= − 1,7474 KN /m2
Mu 1,7474
= = 310,6489 KN/m2
b d2 1 𝑥 0,0752

Dari tabel gideon 5.1.i


Mu
= 300 →  = 0,0011
b d2
Mu
= 400 →  = 0,0014
b d2
Mu
=310,6489 → diinterpolasi
b d2
10,6489
 = 0,0011 + (0,0014 – 0,0011)
100
= 0,00113
1,4 1,4
 min = = = 0,0044
𝑓𝑦 320

Syarat→  <  min


∴dipakai  min = 0,0044

As =  x b x d
= 0,0044 x 1000 x 75
= 330 mm2
Dipakaitulangan Ø10 – 225 (349 mm2 ) (tabel Gideon 2.2a)
Cek Mu <ØMn
𝐴𝑠 𝑥 𝐹𝑦
a =
0,85 𝑥 𝐹𝑐 𝑥 𝑏
449 𝑥 320
=
0,85 𝑥 27 𝑥 1000

= 6,2606 mm
𝑎
ØMn = 0,85 x As x Fy x (d - 2)
6,2606
= 0,85 x 449 x 320 x (75 – )
2

= 8777,3027 Kg /m2
Mu (− 174,74 Kg /m2) <ØMn (8777,3027 Kg /m2) AMAN

STRUKTUR BETON BERTULANG | 13


STRUKTUR BETON BERTULANG | 14
PELAT LANTAI 2

Perhitungan Tebal Plat

Bentang pendek Lx = 4,50 m

Bentang panjang Ly = 5,00 m

𝐿𝑦 5,00
β = = = 1,111 m
𝐿𝑥 4,50

Fy = 320 Mpa

Fc’ = 27 Mpa

fy fy
Ln (0,8 + ( ) Ln (0,8 + ( )
1500 1500
h min = h max =
36 + (9 x β) 36

320 320
5000 (0,8 + ( ) 5000 (0,8 + ( )
1500 1500
= =
36 + (9 𝑥 1,111) 36

= 110,1473 mm → 11 cm = 140,0741 mm → 14 cm

Dicoba = 12 cm

Tulangan rencana = 10 mm

Tebal selimut beton = 20 cm (SNI 3 tahun 2002 pasal 9.7.3.3)

dx = h–p–½Ø dy = h–p–½Ø- Ø
= 120 – 20 – ½ 10 = 120 – 20 – ½ 10-10
= 95 mm = 85 mm

Perhitungan Beban Plat

Beban Mati (WD) (Standar PMI 1970 Pasal 2.1)


Berat sendiri Plat = 2400kg/m3 x 0,12 =288 kg/m2
Berat keramik = 2400kg/m3x 0,01 = 24 kg/m2
Berat spesi = 2100kg/m3 x 0,02 = 42 kg/m2

STRUKTUR BETON BERTULANG | 15


Berat plafon = = 18 kg/m2 +
= 372 kg/m2
Beban Hidup (WL) (Standar PMI 1970 Pasal 2.1)
Berat hidup =200 kg/m2

Kombinasi pembebanan (SK SNI T-15-1991-03 3.2.2.1)

Wu = 1,2 WD + 1,6 WL

= 1,2 x 372 + 1,6 x 200

= 766,4 Kg/m2

= 7,664 KN/m2

PERHITUNGAN MOMEN (Tabel Gideon 4.3.j)

Ly
= 1,111 m < 2m → 2 arah
Lx

MLX = 0,001 .wu .Lx2 .x


= 0,001 .7,664. 5,002 . 39,44
= 7,5567 KN /m2
Mtx = 0,001 .wu .Lx2 .x
= 0,001 .7,664. 5,002 . (-83,77)
= −16,0503 KN/ m2
MLy = 0,001 .wu .Lx2 .x
= 0,001 .7,664. 5,002 . 28
= 5,3648 KN /m2
Mty = 0,001 .wu .Lx2 .x
= 0,001 .7,664. 5,002 . (-14,11)
= − 2,7035 KN/ m2

PERHITUNGAN TULANGAN ARAH X


Momen Lapangan
MLX = 7,5567 KN /m2
Mu 7,5567
= = 837,3075 KN/m2
b d2 1 𝑥 0,0952

Dari tabel 5.1.i


Mu
= 800  = 0,0027
b d2
Mu
= 900  = 0,0031
b d2

STRUKTUR BETON BERTULANG | 16


Mu
= 837,3075 diinterpolasi
b d2
37,3075
 = 0,0027 + (0,0031 – 0,0027)
100

= 0,0028
1,4 1,4
 min = = = 0,0044
𝑓𝑦 320

Syarat →  <  min


∴ dipakai  min = 0,0044
As =  x b x d
= 0,0044 x 1000 x 85
= 374 mm2
Dipakai tulangan Ø10 – 200 (393 mm2 ) (tabel Gideon 2.2a)
Cek Mu < ØMn
𝐴𝑠 𝑥 𝐹𝑦
a =
0,85 𝑥 𝐹𝑐 𝑥 𝑏
393 𝑥 320
=
0,85 𝑥 27 𝑥 1000

= 5,4797 mm
𝑎
ØMn = 0,85 x As x Fy x (d - )
2
5,4797
= 0,85 x 393 x 320 x (95 – )
2
= 9862,2410 Kg /m2
Mu (755,67 Kg /m2) <ØMn (9862,2410 Kg /m2) AMAN

Momen Tumpuan
Mtx= −16,0503 KN /m2
Mu 16,0503
= = 1778,4266KN/m2
b d2 1 𝑥 0,0952

Dari tabel 5.1.i


Mu
= 1700  = 0,0059
b d2
Mu
= 1800  = 0,0063
b d2
Mu
= 1778,4266 diinterpolasi
b d2

 = 0,0059 +((1778,4266-1700)/(1800-1700)) x (0,0063 – 0,0059)


= 0,0062

STRUKTUR BETON BERTULANG | 17


1,4 1,4
min = = = 0,0044
𝑓𝑦 320
(0,85 × fc × β) 𝑥 600
b =
fy (600 + fy)
(0,85 ×27 × 1,125) 𝑥 600
=
320 (600 + 320)

= 0,0526
max = 0,75 x b = 0,75 x 0,0526 = 0,039

Syarat → min <  < max


∴dipakai  = 0,0062
As =  x b x d
= 0,0062 x 1000 x 95
= 589 mm2
Dipakai tulangan Ø10 – 125 ( 628 mm2 ) (tabel Gideon 2.2a)
Cek Mu < ØMn
𝐴𝑠 𝑥 𝐹𝑦
a =
0,85 𝑥 𝐹𝑐 𝑥 𝑏
628 𝑥 320
=
0,85 𝑥 27 𝑥 1000

= 8,7564 mm
𝑎
ØMn = 0,85 x As x Fy x (d - 2)
8,7564
= 0,85 x 628 x 320 x (95 – )
2

= 15479,6534 Kg /m2
Mu (−16,0503 Kg /m2) <ØMn (15479,6534 Kg /m2) AMAN

PERHITUNGAN TULANGAN ARAH Y


Momen Lapangan
MLy= 5,3648 KN /m2
Mu 5,3648
= = 742,5329 KN/m2
b d2 1 𝑥 0,0852

Dari tabel 5.1.i


Mu
= 700 →  = 0,0024
b d2
Mu
= 800 →  = 0,0027
b d2
Mu
= 742,5329 → diinterpolasi
b d2

STRUKTUR BETON BERTULANG | 18


42,5329
 = 0,0024 + (0,0027 – 0,0024)
100

= 0,0025
1,4 1,4
 min = = = 0,0044
𝑓𝑦 320

Syarat→  <  min


∴dipakai  min = 0,0044

As =  x b x d
= 0,0044 x 1000 x 85
= 374 mm2
Dipakaitulangan Ø10 – 200 (393 mm2 ) (tabel Gideon 2.2a)
Cek Mu < ØMn
𝐴𝑠 𝑥 𝐹𝑦
a =
0,85 𝑥 𝐹𝑐 𝑥 𝑏
393 𝑥 320
=
0,85 𝑥 27 𝑥 1000

= 5,4797 mm
𝑎
ØMn = 0,85 x As x Fy x (d - 2)
5,4797
= 0,85 x 393 x 320 x (85 – )
2

= 8793,2810 Kg /m2
Mu (536,48 Kg /m2) <ØMn (8793,2810 Kg /m2) AMAN

MomenTumpuan
Mty= − 2,7035 KN /m2
Mu 2,7035
= = 374,1869 KN/m2
b d2 1 𝑥 0,0852

Dari tabel gideon 5.1.i


Mu
= 300 →  = 0,0011
b d2
Mu
= 400 →  = 0,0014
b d2
Mu
=310,6489 → diinterpolasi
b d2
74,1869
 = 0,0011 + (0,0014 – 0,0011)
100
= 0,0013

STRUKTUR BETON BERTULANG | 19


1,4 1,4
 min = = = 0,0044
𝑓𝑦 320

Syarat→  <  min


∴dipakai  min = 0,0044

As =  x b x d
= 0,0044 x 1000 x 85
= 374 mm2
Dipakaitulangan Ø10 – 200 (393 mm2 ) (tabel Gideon 2.2a)
Cek Mu <ØMn
𝐴𝑠 𝑥 𝐹𝑦
a =
0,85 𝑥 𝐹𝑐 𝑥 𝑏
393 𝑥 320
=
0,85 𝑥 27 𝑥 1000

= 5,4797 mm
𝑎
ØMn = 0,85 x As x Fy x (d - 2)
5,4797
= 0,85 x 393 x 320 x (85 – )
2

= 8793,2810 Kg /m2
Mu (− 2,7035 Kg /m2) < ØMn (8793,2810 Kg /m2) AMAN

STRUKTUR BETON BERTULANG | 20


Perhitungan Plat atap

- Beban mati
Beban segitiga = ½ x WD x Lx t
= ½ x 300 x 4,00 x 2,113
= 1267,8 kg/m
5+0,8
Beban trapesium = x 2,113 x 300
2

= 1838,31 kg/m
- Beban hidup
Beban segitiga = ½ x WL x Lx t
= ½ x 100 x 4,00 x 2,113
= 422,6 kg/m
5+0,8
Beban trapesium = 2
x 2,113 x 100

= 612,77 kg/m

Perhitungan yang diterima balok


- Beban mati
Beban segitiga = ½ x WD x Lx t
= ½ x 372 x 4,00 x 2,113
= 1572,072 kg/m
5+0,8
Beban trapesium = x 2,113 x 372
2

= 2279,504 kg/m
- Beban hidup
Beban segitiga = ½ x WL x Lx t
= ½ x 200 x 4,00 x 2,113
= 845,2 kg/m
5+1,2
Beban trapesium = x 2,113 x 200
2

= 1310,06 kg/m

STRUKTUR BETON BERTULANG | 21


 Perhitungan Pembebanan pada SAP
- Material
f’c = 25 Nmm
Ec = 4700 x √25= 23500 Nmm
fy = 240 Nmm
Es = 200.000 Nmm
fu = 390 Nmm
- Frame section
 B 25 x 50 menggunakan selimut beton 40 mm
 K 30 x 30 menggunakan selimut beton 40 mm
- Area section
 Plat 10
Shell-layer/non linear
Top bar = 10d
Jarak tulangan = 150 mm
Selimut beton = 20 mm
 Plat 12
Shell-layer/non linear
Top bar = 12d
Jarak tulangan = 200 mm
Selimut beton = 20 mm
- Load Pattern
Dead = 1
Live = 0
- Load combinastions
Dead = 1,2
Live = 1,6
- Frame Load , distribute
Dead = pasangan batu bata setengah batu x Z
= 250 x 4,211
= 1052,75 kg/m

STRUKTUR BETON BERTULANG | 22


- Area Load , uniform (shell)
 Beban lantai
Dead = keramik + spesi + plafon + penggangtung
= 24 + 42 + 18
= 84 kg/m2
Live = 200 kg/m2
 Beban atap
Dead = spesi + plafon + penggangtung
= 42 + 18
= 60 kg/m2
Live = 100 kg/m2

STRUKTUR BETON BERTULANG | 23


PERHITUNGAN TULANGAN BALOK B1

Data-Data Ukuran Balok B1 (25 X 50)


Ø tulangan pokok atas (Øp) = 13 mm
Ø tulangan sengkang (Øs) = 8 mm
Selimut beton (p) = 40 mm (SNI 3-2847-2002 pasal 9.7.1.c)
Mutu beton (Fc) = 35 Mpa
Mutu baja (Fy) = 240 Mpa (Sengkang)
= 400 Mpa (Longitudinal)
d = h – p –Øs – ½ Øp
= 500 – 40 – 8 – 6,5
= 445,5 mm
- Menghitung Tulangan Tumpuan
Dari SAP diperoleh:
Mtumpu = - 39579599Nmm
 Tulangan atas
As = 368 mm2
As 368
n =1 = 1 = 2,77 → digunakan 3 tulangan
π D2 x 3,14 x 132
4 4

As = π x r2 x jumlah tulangan
= 3,14 x 6,52x 3
= 398 mm2
Sehingga digunakan tulangan atas 4D13 dengan As = 398 mm2
 Tulangan bawah
As = 182 mm2
As 182
n =1 = 1 = 1,372 → digunakan 2 tulangan
π D2 x 3,14 x 132
4 4

As = π x r2 x jumlah tulangan
= 3,14 x 6,52x 2
= 265 mm2
Sehingga digunakan tulangan atas 2D13 dengan As = 265 mm2

STRUKTUR BETON BERTULANG | 24


- Menghitung Tulangan Lapangan
Dari SAP diperoleh:
Mlapangan = 35372541 Nmm
 Tulangan atas
As = 90 mm2
As 90
n =1 = 1 = 1,278 → digunakan 2 tulangan
π D2 x 3,14 x 132
4 4

As = π x r2 x jumlah tulangan
= 3,14 x 6,52x 2
= 226,08 mm2
Sehingga digunakan tulangan atas 2D12 dengan As = 226 mm2
 Tulangan bawah
As = 328 mm2
As 328
n =1 = 1 = 2,47 → digunakan 3 tulangan
π D2 x 3,14 x 132
4 4

As = π x r2 x jumlah tulangan
= 3,14 x 6,52 x 3
= 397,995 mm2
Sehingga digunakan tulangan atas 4D13 dengan As = 398 mm2
- Menghitung Tulangan Geser Tumpuan
Dari SAP diperoleh :
Vu = 69955,330 N
1
Vc = 6 x √f′c x b x d
1
= 6 x √25 x 250 x 445,5

= 92812,5 N
ØVc = 0,75 x 92812,5 = 69609,375 N
½ ØVc = ½ x 69609,375 = 34804,688 N
∴Karena ½ ØVc < Vu maka digunakan sengkang minimum
75 x √f′c x b x d 75 x √25 x 250 x 445,5
Av = = = 145,02
1200 x fy 1200 x 240

s max = ½ d = ½ x 445,4 = 222,75 → digunakan jarak s = 200 mm


→ kontrol kapasitas geser terhadap jarak maksimum
Av x fy x d 145,02 x 240 x 445,5
Vs = = = 77527,692 N
s 200

STRUKTUR BETON BERTULANG | 25


Ø (Vc + Vs) = 0,75 x (92812,5 + 77527,692) = 127755,144 N
Ø (Vc + Vs) = 127755,144 N > Vu = 69955,330 N ..........(OK)
Karena Ø (Vc + Vs) > Vu , maka jarak sengkang 200 mm dapat digunakan.
∴ maka tulangan geser yang dipakai Ø8 – 200
- Penulangan Torsi
Dari SAP diperoleh :
Tu = 551.062,85 Nmm
Tu 551.062,85
Tn = = = 734.750,467 N
Ø 0,75

Acp = 250 x 500 = 125000 mm2


Pcp = 2 x (250 + 500) = 1500 mm
Ø √f′c Acp2 0,75 x √25 1250002
( ) = ( ) = 3255208,333 Nmm
12 Pcp 12 1500

Ø √f′c Acp2
Tu < ( )
12 Pcp

551.062,85 Nmm < 3.255.208,333 Nmm


∴ maka tidak diperlukan tulangan torsi

PERHITUNGAN TULANGAN KOLOM K1

Data-data ukuran Kolom 30 x 30


Ø tul pokok (Øp) = 16 mm
Ø tul sengkang (Øs) = 8 mm
Selimut beton (p) = 40 mm(SNI 3-2847-2002 pasal 9.7.1.c)
Mutu beton (Fc) = 25Mpa
Mutu baja (Fy) = 240 Mpa (Sengkang)
= 400 Mpa (Longitudinal)
d = h – p – Øs– ½ Øp
= 300 – 40 – 8 – 8
= 244 mm
d’ = p +Øs+ ½ Øp
= 40 + 8 +8
= 56 mm
Pu = -583241 N

STRUKTUR BETON BERTULANG | 26


Mu1 = 6299970 Nmm
Mu2 = 3113344,9 Nmm
- Perhitungan Pengaruh tekuk
WD = 1651,069 kg/m
WL = 887,671 kg/m
1,2 WD 1,2 𝑥 1651,069
βd = 1,2 W = (1,2 x 1651,069 ) +(1,6 x 887,671)
= 0,583 < 1
D +1,6 WL

Ec = 4700√𝑓𝑐
= 4700√25
= 23500MPa
= 235000 kg/cm2
1
Ig =12 b h3
1
= 12 x 30 x 303

= 67500 cm4
Ec x Ig
2.5
EIk = 1+ d
235000 x 67500
2.5
EIk = = 4010745891 kg/cm2
1+0,582

- Momen Inersia Balok


1
Ig = 12b h3
1
= 12x 25 x 503 = 260416,667 cm4
Ec x Ig
5
EIb = 1+ d
235000 x 260416,667
5
EIb = = 7736778350 kg/cm2
1+0,582

A = (EIk / lk) / (EIb / lb)


= (4010745891 / 3) / (7736778350/ 5)
= 0,864
B = 0 (Terjepit Pada Pondasi)
Dari grafik alignment (diagram nomogram, Gideon 7.1.c) didapat k = 0,74
Panjang tekuk kolom Lc = k x Lu = 0,74 x 421,1 = 311,6cm

STRUKTUR BETON BERTULANG | 27


Untuk kolom persegi,jari-jari inersia r = 0,3 h
= 0,3 x 50 = 15 cm
Rasio kelangsingan kolom,  = Lc / r = 311,6/ 15 = 20,773
Lengkungan yang terjadi pada kolom adalah lengkung ganda
Mu1 = 6299970 Nmm
Mu2 = 3113344,9 Nmm
Batas kelangsingan kolom adalah :
Mu1 6299970
(34 – 12) =(34 – 12) = 44,518
Mu2 3113344,9

Pemeriksaan kelangsingan kolom :


Mu1
 = Lc/r = 20,773 ≤ 34 - 12 = 44,518
Mu2

Maka pengaruh tekuk tidak perlu ditinjau pada perhitungan penulangan


kolom
- Perhitungan Tulangan Kolom
Pu = -583241 N
Mu1 = 6299970 Nmm
Mu2 = 3113344,9 Nmm
Ag = 300 x 300 = 90000 mm2
Persyaratan eksentrisitas minimal dari kolom
emin = (15 + 0,03 h) = 15 + 0,03 x 300 = 24 mm
Mu 3113344,9
Eksentrisitasbeban et = = = 5,338 mm
Pu 583241

Koefisien untuk sumbu vertikal


Pu 583241
= = 0,47
 x Ag x 0,85 x fc 0,65 x 90000 x 0,85 x 25

Koefisien untuk sumbuh orisontal


Pu emin 583241 24
x = 0,65 x 90000 x 0,85 x 25 x 300 = 0,038
 x Ag x 0,85 x fc h

Tulangan simetris 4 sisi


d′
Dipilih h = 0,10, dari diagram interaksi pada tabel Gideon 6.1.d didapatkan

r = 0,011untuk mutu beton 25 Mpa, didapat  = 1,0. Sehingga rasio tulangan


pada penampang kolom  = r x  = 0,011 x 1,0 = 0,011 > min = 0,01→ =
0,011
Luas tulangan yang diperlukan AsT =  x Ag = 0,011 x 90000= 990 mm2

STRUKTUR BETON BERTULANG | 28


As 990
n =1 = 1 = 4,93 → digunakan 5 tulangan
π D2 x 3,14 x 162
4 4

As = π x r2x jumlah tulangan


= 3,14 x 82 x 5
= 1005mm2
Sehingga digunakan tulangan atas 5D13 dengan As = 1005mm2
- Tulangan sengkang
Vu = 2228 N
1
Vc = 6 x √f′c x b x d
1
= 6 x √25x300 x 244

= 61000 N
ØVc = 0,75 x 61000 = 45750 N
½ ØVc = ½ x 45750 = 22875 N
∴ Karena Vu < ½ ØVc sehingga tidak memerlukan sengkang

Dari perhitungan diatas, bahwa dengan hanya menghitung kuat geser


nominal yang disumbangkan oleh beton tersebut mampu menahan kuat
geser yang bekerja pada struktur tersebut.
Jarak tulangan geser:
Av = 2 x (1/4 π D²) = 2 x (1/4 x 3,14 x 8²) = 100,48 mm²
s = (Av x fy x d) / (Vu / 0,75) = (100,48 x 240 x 244) / (2243,46 /
0,75)
= 1967,087 mm
syarat jarak maksimum tulangan geser kolom tidak boleh melebihi:
a. b/4 = 300/4 = 75 mm
b. 8D = 8 x 16 = 128 mm
c. 100 mm
Digunakan, s = 75 mm
Av x fy x d 100,48 x 240 x 244
Vs = = = 78454,784 N
s 75

Kontrol :
Vc + Vs = 61000 + 78454,784 = 139454,784 N
Vc + Vs = 139454,784 N > Vu/Ø = 2242,87 / 0,75 = 2991,28 N (OK)

STRUKTUR BETON BERTULANG | 29


Dari nilai yang didapat sebelumnya, perencanaan tulangan geser
memenuhi syarat. Karena jarak antar tulangan geser terlalu pendek, dan
menghasilkan kuat geser nominal yang besar yang dihasilkan oleh beton
dan tulangan geser itu sendiri, maka jarak antar tulangan dirubah.
Dari SNI 03-2847-2002, batas spasi tulangan geser yang dipasang tegak
lurus terhadap sumbu aksial komponen struktur tidak boleh melebihi d/2
untuk komponen struktur non-prategang. Dimana d adalah tinggi efektif
kolom tersebut, sehingga :
smaks = d/2 = 244/2 = 122 mm
dipakai, s = 120 mm
maka,
Av x fy x d 100,48 x 240 x 244
Vs = = = 49034,24 N
s 120

Kontrol :
Vc + Vs = 61000 + 49034,24 = 110034,24 N
Vc + Vs = 110034,24 N > Vu/Ø = 2242,87 / 0,75 = 2991,28 N (OK)
Dari nilai yang didapat diatas, perencanaan tulangan geser memenuhi
syarat dengan perencanaan tulangan geser Ø8 – 120.