LY
s¢RICI
TEST REPORT OF CONCRETE SURFACE COATING THICKNESS
‘STRIPPING METHOD:
IREPORT NO. BLR-C-0969-19-1 REPORT DATE: April29,2019
cient SShapoorj Polanji LAB REF. # BLS-C-0969-19
pRosect SSWRO Desalination Plant Al Dur Phase-
JPROJECT LOCATION Al Dur TESTING DATE April28,2019
SAMPLE DESCRIPTION NAAZ TESTED BY RICI
CONSHIELD B70
NO. TEST LOCATION | COATING THICKNESS VALUE,
| (aicrons)
1 DMPF-1- Grid C/1-17 - Mos Footing - Sample #1 1391
2 DMPP-1- Grid C/1-17 - MO3 Footing - Sample #2 1476
3. DAF-Stream-2 - Grid 1-2/BE - Down Area 144s
4 DMPF-1- Grid D/14-17 1398
[REMARKS ‘The specific gravity of waterproofing material provided by client is 1.14
Bilal
‘Name of Technician
fom Page a swede
“The copy otis documents ans by FIC, shall ot be eprocuoec axa ith pie wlan approval a Ie company.
RESOURCE INSPECTIONS CANADA INCORPORATED apy ySt iS 5285! espns
Office 44, Building 2125, Rosd 1520, Sock 115, V0d gee ATS Sale TIT aye sth e
Hiei, Kingdom of Bahrain cep Shae Be
7:4973 1700 5240 | F: 4973 1700 5140 Avr iveso\Se Sia AvP ere ale
mal info@ricioniine.com | Website: www ricionline com ‘worurcionine coms}: x Info@riconline coms. 33,01 ay