73eNodeB Report_2014120573
No SA Check Items Item check Severity Descriptions MCP-BTS ZXDU48- MCP-IBS ZXDU48-GF W201-GF
Z.E.1.1.3 Major Door cabinet can be freely opened for maintenance purpose
Anchor bolts /Screw are installed at ALL 4 corners (not just front
Z.E.1.1.4 Major
two)
Z.E.1.2.2 Minor All empty slots must be closed with dummy panels
All Sub rack are screwed in firmly with all the proper bolts/No
Z.E.1.2.4 Minor
Missing Screw
Z.E.2.1.1 Critical DC Power cable type installed are as per Design Pack
Z.E.2.1.2 Critical eNode B connected to LLVD1 (NA for Bali Tower Site)
Verify that all power cable wiring and heat shrinkable uses
Z.E.2.1.4 Minor
correct colors
All Power cable label must be clear and neat and printed at both
Z.E.2.1.5 Minor
end
Z.E.2.3.1 Major Indoor Optical Cables are wrapped in spiral wrap/ conduit
Z.E.2.3.2 Major Optical Cable are securely seated at eNodeB
Z.E.2.3.3 Major Optical cable connect as per design
Z.E.2.3.4 Minor All Optical cable label must be clear and neat and printed
Optical Cable for Remote Unit & GPS Cable
2.2 Z.E.2.3.5 Critical Optical cable type installed are as per Design Pack
installation
Z.E.2.3.6 Major All Optical cable not scratched or dented or damage
Z.E.2.5.1 Critical GPS cable type installed are as per Design Pack
Z.E.2.5.2 Major GPS cable plugs are securely seated
Z.E.2.5.3 Major All cable ties use as per standard installation
Z.E.2.5.4 Minor GPS cable label must be clear and neat and printed
Z.E.2.5.5 Major GPS Arrester is installed as per Guideline
Z.E.2.4.1 Critical Transmission cable type installed are as per Design Pack
Transmission Cable are securely seated at both end (e Node B
2.3 Transmission Cable Installation Z.E.2.4.2 Major
part and IDU part)
All Transmission cable label must be clear and neat and printed
Z.E.2.4.3 Minor
at both end
Z.E.2.6.4 Major All grounding connection must be terminated with cable lugs
2.5 Alarm Cable Installation Z.E.2.7.2 Major Alarm cable plugs are securely seated
Z.E.2.7.3 Minor Alarm cable label must be clear and neat and printed
All cables entering the service cabinet via Glands must be sealed
Z.E.3.1.2 Major
with approved sealant/ tape
Horizontal Cable runs are neat and straight and layout conform
3.1 Laying cable Horizontal and Vertical Installation Z.E.3.1.1 Major
to the design pack and use metal conduit for optic cables
A water drip arch is made for Optical Fibre Cable & Power cable
Z.E.3.1.4 Major
at cable entry point.
All bolts, nuts, washer and lock washers are present and
Z.E.3.4.6 Major
properly tightened as per standard installation
Number of RF Jumper Cable ½" should be installed as per Design
Z.E.3.6.1 Critical
Pack
All RF Jumper Cable ½" connect to the corresponding port of
Z.E.3.6.2 Major
3.4.1 Antenna Installation Sector 1 RRU & Antenna
All RF Jumper Cable ½" connection covered with standard
Z.E.3.6.3 Major
waterproof installation
Z.E.3.6.7 Minor RF Jumper labeled correctly and waterproof, easy to read
Number and placement of Bias T module should be installed as
Z.E.3.5.3 Critical
per Design Pack
Z.E.3.5.2 Major AISG cable connected per design and use waterproofing
Z.E.3.5.4 Major Bias-T cable connected per design and installed properly
Z.E.3.5.4 Major Bias-T cable connected per design and installed properly
Z.E.3.5.4 Major Bias-T cable connected per design and installed properly
Z.E.3.5.4 Major Bias-T cable connected per design and installed properly
Z.E.3.6.5 Major All RF Jumper Cable ½" not scratched or dented or damage
All RF Jumper Cable ½" laying cable not routed on fix arm of
Z.E.3.6.4 Major
Tower mounting bracket
Z.E.3.5.4 Major Bias-T cable connected per design and installed properly
Z.E.3.5.4 Major Bias-T cable connected per design and installed properly
Z.E.3.7.2 Major Mounting Bracket TDD Radio Remote Unit are installed properly
Z.E.3.7.2 Major Mounting Bracket TDD Radio Remote Unit are installed properly
All unused TDD Radio Remote Unit entry point must be covered
Z.E.3.7.5 Major
by waterproof rubber
Z.E.3.7.2 Major Mounting Bracket TDD Radio Remote Unit are installed properly
3.6.3 TDD Radio Remote Unit Sector-3 Cable gland/ waterproof rubber plug at TDD Radio Remote Unit
Z.E.3.7.4 Major
installed correctly
All unused TDD Radio Remote Unit entry point must be covered
Z.E.3.7.5 Major
by waterproof rubber
Optical fiber and DC Power cable labeled correctly, waterproof
Z.E.3.7.3 Minor
and easy to read
Grounding cable connected to each of Radio Remote Unit (FDD
Z.E.3.10.1 Major
& TDD) and Filter and integrated to the Grounding bar
Z.E.3.7.2 Major Mounting Bracket FDD Radio Remote Unit are installed properly
Z.E.3.9.2 Major FDD Filter Unit are installed as per standard installation
Z.E.3.9.3 Major Jumper connected to FDD Filter Unit as per Design Pack
Z.E.3.9.4 Minor Jumper cable to FDD Filter unit labeled correctly, waterproof
and easy to read
Z.E.3.7.2 Major Mounting Bracket FDD Radio Remote Unit are installed properly
Z.E.3.9.2 Major FDD Filter Unit are installed as per standard installation
Z.E.3.9.3 Major Jumper connected to FDD Filter Unit as per Design Pack
Z.E.3.9.4 Minor Jumper cable to FDD Filter unit labeled correctly, waterproof
and easy to read
Z.E.3.7.2 Major Mounting Bracket FDD Radio Remote Unit are installed properly
3.7.3 FDD Radio Remote Unit Sector-3 Cable gland/ waterproof rubber plug at FDD Radio Remote Unit
Z.E.3.7.4 Major
installed correctly
All unused FDD Radio Remote Unit entry point must be covered
Z.E.3.7.5 Major
by waterproof rubber
Optical fiber and DC Power cable labeled correctly, waterproof
Z.E.3.7.3 Minor
and easy to read
Grounding cable connected to each of Radio Remote Unit (FDD
Z.E.3.10.1 Major
& TDD) and Filter and integrated to the Grounding bar
Z.E.3.10.1 Major Grounding cable connected to each of Radio Remote Unit (FDD
& TDD) and Filter and integrated to the Grounding bar
Z.E.3.9.1 Critical Number FDD Filter Unit should be installed as per Design Pack
Z.E.3.9.2 Major FDD Filter Unit are installed as per standard installation
Z.E.3.9.3 Major Jumper connected to FDD Filter Unit as per Design Pack
Z.E.3.9.4 Minor Jumper cable to FDD Filter unit labeled correctly, waterproof
and easy to read
3.8 Grounding Installation
Z.E.3.10.1 Major Grounding cable connected to each of Radio Remote Unit (FDD
& TDD) and Filter and integrated to the Grounding bar
Z.E.3.10.2
Critical 1 x Grounding cable from each equipment to bus bar
RRU FDD/ TDD/ Filter Grounding connection at Z.E.3.10.3
3.8
outdoor Grounding bar
Major All grounding connection must be terminated with cable lugs
Z.E.3.10.4
Minor Is terminated using heat-shrink/ sealant tape
Z.E.3.10.5 Major Grounding cable plugs are securely seated