Site ID-Site Name ZSMG2_0270

Subcon Name PT TIS


Date Pre-CI 19-Dec-22
Name QE Review
MW Near End Far End Near End Far End

1. INSTALLATION CHECK -NEAR END Item Check Picture Reference Picture Reference Picture Actual Picture Actual

1.1 Ethernet to IDU/POE


installation/Ethernet - IDU/POE A. Ethernet Proper crimping/Ethernet di
installation krimping dengan benar
(Not Applicable for IDU Integrated)

NE_1.1 FE_1.1 TO GE5


2.ANTENNA & SRU ODU INSTALLATION
Item Check Picture Reference Picture Reference
CHECK - NEAR END

A. Antenna Mounting use double


2.1 MW Antenna Mounting
nuts/Mounting antenna menggunakan
Installation/Mounting Antena MW
double nut
Instalasi
B. Antenna securely fixed to mount

NE_2.1 FE_2.1 NE_2.1 FE_2.1

A. All cable plugs are securely


seated/kabel Plug terpasang dengan
Kencang
B. OBU&SRU2 is grounded as per
2.2 SRU ODU Power,IF, Arrester &
Standard installation/OBU&SRU2
Grounding Cable Installation/Kabel
grouding cable sesuai standard instalasi
Power,IF,Arester dan Grounding Instalasi
C. Grounding/lightning protection
installed as per standard
Installation/Grounding/Lightning Proteksi
terpasang sesuai standar Instalasi

NE_2.2 FE_2.2

2.3 Ethernet Connection


A. Ethernet Proper crimping/Ethernet di
Installation/Ethernet Instalasi
krimping dengan benar
( Applicable for IDU Integrated )

NE_2.3 FE_2.3

2.4 Grounding Earthing Kit Cable/DC A. Grounding Earthing Kit Cable/DC Power
Power Installation dipasang secara benar/standard

NE_2.4 FE_2.4 FE 2.4