MCCORMICK PHILIPPINES FACILITY TRANSFER PROJECT

Request for Information (RFI)

Originators Name: SYSU International Incorporated Date Initiated: August 5, 2021


Company: SYSU International Incorporated Discipline: Electrical and Structural
Originator’s Phone number: 920- 5291
Item Request for Information Response to RFI Remarks
no.

1.0 ELECTRICAL    

1.1 Please confirm the type of Primary meter    


will be used if for the following situations:
A. If the solar power system will be
installed synchronized with the project
construction.
B. If the solar power system will be
installed in the future
1.2 Please confirm if the inverter and other    
auxiliary devices for the solar power system
for DC to AC (3phase) will require a room.
Note: If yes, kindly indicate the space
requirement.
1.3 Please confirm the peak solar harvest (in    
kWp) as per latest roof plan provided.
1.4 Please confirm if the installation of solar    
panels at roof will require specific lightning
protection system.
Note: Conventional LPS (Faraday Cage) is
considered as per original design intent.
2.0 STRUCTURAL    

2.1 Please confirm if the solar panel requires    


structural support for installation
compatibility.

2.2 Please provide specifications of solar panel;    


Weight per panel, Dimension, fixing details
& spacing and other related details required
in installation

2.3 Please provide setting layout of all solar    


panels at roof

Replied By: ___________________________ Date: _______________