This document is a request for information (RFI) from SYSU International Incorporated regarding electrical and structural details for installing a solar power system at the new McCormick Philippines facility. It includes questions about the primary meter, space requirements for inverters and auxiliary devices, solar harvest capacity, lightning protection needs, structural support requirements, solar panel specifications, and the solar panel layout. Responses are requested to clarify these technical details to properly design and install the solar power system.
This document is a request for information (RFI) from SYSU International Incorporated regarding electrical and structural details for installing a solar power system at the new McCormick Philippines facility. It includes questions about the primary meter, space requirements for inverters and auxiliary devices, solar harvest capacity, lightning protection needs, structural support requirements, solar panel specifications, and the solar panel layout. Responses are requested to clarify these technical details to properly design and install the solar power system.
This document is a request for information (RFI) from SYSU International Incorporated regarding electrical and structural details for installing a solar power system at the new McCormick Philippines facility. It includes questions about the primary meter, space requirements for inverters and auxiliary devices, solar harvest capacity, lightning protection needs, structural support requirements, solar panel specifications, and the solar panel layout. Responses are requested to clarify these technical details to properly design and install the solar power system.
Originators Name: SYSU International Incorporated Date Initiated: August 5, 2021
Company: SYSU International Incorporated Discipline: Electrical and Structural Originator’s Phone number: 920- 5291 Item Request for Information Response to RFI Remarks no.
1.0 ELECTRICAL
1.1 Please confirm the type of Primary meter
will be used if for the following situations: A. If the solar power system will be installed synchronized with the project construction. B. If the solar power system will be installed in the future 1.2 Please confirm if the inverter and other auxiliary devices for the solar power system for DC to AC (3phase) will require a room. Note: If yes, kindly indicate the space requirement. 1.3 Please confirm the peak solar harvest (in kWp) as per latest roof plan provided. 1.4 Please confirm if the installation of solar panels at roof will require specific lightning protection system. Note: Conventional LPS (Faraday Cage) is considered as per original design intent. 2.0 STRUCTURAL
2.1 Please confirm if the solar panel requires
structural support for installation compatibility.
2.2 Please provide specifications of solar panel;
Weight per panel, Dimension, fixing details & spacing and other related details required in installation