Windzone : 290kph
Power Grid : G1
Participants
A Civil Works
OSP entry ducting and test pit completed as per YES As per DDD
4.
site design
Power ducting from kWh meter and/or backup YES As per DDD
5.
generator location completed as per site design
Fence, Gate and Key Lock of the site is properly (still ongoing)
5.
prepared
Brian Adlawan
CONTRACTOR PIC
NA
NA