READY FOR TELECOM INSTALLATION

(RFTI) INSPECTION CHECKLIST

TOWERCO Name : PHILTOWER CONSORTIUM INC.

TOWERCO Site ID : PTNEG0015 GLOBE Site ID : NS-NTG20-F07

TOWERCO Site Name : GLOBE Site Name : BrgySantoTomas_SanJoseCity_NuevaEcija

Inspection Date : May 23,2022

Site Type : Greenfield

Tower Height : 35 meters (3-Legged)

Windzone : 290kph

Power Grid : G1

Participants

Name Position Contact No. Company

John Hely Parungao Site Supervisor 09088648451 PTCI

Adlawan, Brian D Site Engineer 09054076846 AVECS CORP.

Felix Teleforos Area Engineer 09178361374 AVECS CORP.


Supervisor
RFTI Inspection Checklist

NO DESCRIPTION DONE NOT APPLICABLE REMARKS

A Civil Works

Antenna support structures completed with YES As per DDD


1.
accessories for MNO antenna installations

Correct Plinth/Platform dimensions and positions YES Height of Platform: 750mm


2.
for MNO Equipment

Complete cable support structure provided from YES As per DDD


3.
equipment location to antenna locations

OSP entry ducting and test pit completed as per YES As per DDD
4.
site design

Power ducting from kWh meter and/or backup YES As per DDD
5.
generator location completed as per site design

B Safety and Working Conditions

Ladders, handrails, rest and working platforms YES As per DDD


1.
provided as needed

Tower climbing ladder completed and climbing YES As per DDD


2.
safety system installed

3. Safe access to equipment locations YES As per DDD

4. Safe access to antenna locations YES As per DDD

Fence, Gate and Key Lock of the site is properly (still ongoing)
5.
prepared

C Electrical and Grounding System

Equipment grounding system installed and YES As per DDD


1.
connected to main grounding system

Tower grounding busbars installed and connected YES As per DDD


2.
to main grounding system

Site grounding resistance test completed and YES


3.
results within specification

AC Power Grid Connection YES Temporary Power only


4.
(Permanent/Temporary Power)
D Antenna Installations

Space available for RF and MW Antenna Yes As per DDD


1.
assemblies at correct height and azimuth

Antenna mounting brackets installed at correct Yes As per DDD


2.
height and azimuth
RFTI Acknowledgement

Date : May 23,2022

☑Site ready for Installation

Site NOT ready for Installation

Brian Adlawan
CONTRACTOR PIC

John Hely Parungao


TOWER CO PIC
Tower Antenna Mounting Bracket

NA

BTS Pad DG Pad

NA

BTS Pad Busbar DG Pad Busbar


Tower Leg A Grounding Tower Leg B Grounding

Tower Leg C Grounding Test Pit Grounding

Cable Tray Deflection Measurement


Verticality Test Verticality Test Result

Torque Test Torque Test Result

Electrical Panels Service Entrance Post


Fence and Gate (ongoing) Perimeter Lights (ongoing)

Lower Tower Busbar Middle Tower Busbar

Upper Tower Busbar Test Pit


Power Manhole FOC Manhole

Lightning Arrester OB Light-Solar Type

Transformer Main Kwh Meter (Tempo Power)


ACPDB ECB/MTS

MDP Globe Submeter

Insulation Test Insulation Test Result


Voltage Test Voltage Test Result

FOC/CEF Site Entrance

Access Road 1 Access Road 2


SITE OVERVIEW SITE OVERVIEW

SITE OVERVIEW SITE OVERVIEW