CLEARING
HAULING
LAY-OUT
I. EARTHWORKS
A. EXCAVATION
1. FOOTINGS 5.18
2. GRADE BEAMS 1.18
3. SEPTIC TANK 5.53
B. BACKFILLING (FOOTING) 5.10
0.5 1
5.00
6.00
5.00
8.00
10.00
4.00
8.00
5.00
4.00
140.00
180.00
6.00
8.00
5.00
1.00
1.00
STEELMAN/DAY MANPOWER PER DAY ESTIMATED DAY LABOR PER DAY
1.04
0.20 2.34 1550.00
1.11
0.64 1.00 1550.00
2.98 SAY 3 SUB TOTAL
0.60
1.50
0.88
6.13 1550.00
1.40
1.75
2.96
4.76 1700.00
1.81
4.76 SAY 5 SUB TOTAL
1.00
0.88
1.40
2.00
2.00
TOTAL LABOR
3624.93
1550.00
5174.93
9493.75
9493.75
8096.59
8096.59