WORK DESCRIPTION QUANTITY OF WORK

CLEARING
HAULING
LAY-OUT

I. EARTHWORKS
A. EXCAVATION
1. FOOTINGS 5.18
2. GRADE BEAMS 1.18
3. SEPTIC TANK 5.53
B. BACKFILLING (FOOTING) 5.10

FOOTING & COLUMN FABRICATION


CUTTING,BENDING & TYING (FOOTING, 6
COLUMN & STIRRUPS)
CONCRETE POURING (FOOTINGS) 6
CUTTING,BENDING & TYING 7
(GRADE BEAM & STIRRUPS)

FORMWORKS (COLUMN FOUNDATION & GRADE BEAM) 7

CONCRETE POURING (COLUMN FOUNDATION & GRADE 7


BEAM)

CHB LAYERING (EXTERIOR) 5" 414


CHB LAYERING (INTERIOR) 4" 325

FORMWORKS (COLUMN) & POURING CONCRETE 6


CUTTING,BENDING & TYING (ROOF BEAM) 7
FORMWORKS (ROOF BEAM) 7
FORMWORKS (SUSPENDED SLAB) 2
POURING CONCRETE (SUSPENDED SLAB) 2

PLASTERING (EXTERIOR) 15mm


PLASTERING (INTERIOR) 15mm
FOREMAN MASON/DAY HELPER/DAY HELPER/DAY

0.5 1

5.00
6.00
5.00
8.00

10.00

4.00
8.00

5.00

4.00

140.00
180.00

6.00
8.00
5.00
1.00
1.00
STEELMAN/DAY MANPOWER PER DAY ESTIMATED DAY LABOR PER DAY

1.04
0.20 2.34 1550.00
1.11
0.64 1.00 1550.00
2.98 SAY 3 SUB TOTAL

0.60

1.50
0.88
6.13 1550.00

1.40

1.75

6.13 SAY 6 SUB TOTAL

2.96
4.76 1700.00
1.81
4.76 SAY 5 SUB TOTAL

1.00
0.88
1.40
2.00
2.00
TOTAL LABOR

3624.93

1550.00
5174.93

9493.75

9493.75

8096.59

8096.59