You are on page 1of 1

NOTES:

280-PI-T-010
1. FOR GENERAL NOTES, SEE DRAWING 000-PI-T-001.
2. BLOWDOWN FOR COOLING TOWER.
FROM 280-LSL-0141
CLOSE
2489 280-PI-T-011

FROM COOLING WATER


CIRCULATING PUMPS
280-PP-006 THRU 008
16"-CWS-280-061-L1
1691 280-PI-T-011

TO 280-LSL-0381
FIT FIC OVERRIDE
2765 280-PI-T-027
0111 0111
FAL
FE FV
+ +

0111 0111 TO RESIDUE REPULP TANK


284-TK-071
2"-CWS-280-11725-L1
M 1665 284-PI-T-005
FROM HYDRAULIC POWER UNIT
2"-A-3 V6 (NOTE 2)
284-FL-011
1"-CWR-284-020-L1 TO RESIDUE
1524 284-PI-T-002 1"-A-3 FILTER HPU
2 284-HP-012
1"-CWS-280-017-L1
2333 284-PI-T-008
HYDRAULIC POWER UNIT
284-HP-012 10"x6"
1"-CWR-280-019-L1
2336 284-PI-T-008 10"x6" 1"-A-3 2
TO ACD FILTER HPU
284-FL-011
2 1"-CWS-280-018-L1
1523 284-PI-T-002
FROM ADM CRYSTALLIZER
CENTRIFUGE 286-CF-110 TO ADM CRYSTALLIZER
3/4"-CWR-280-111-L1 CENTRIFUGE 286-CF-110
2879 286-PI-T-007
3/4"-CWS-280-110-L1
2881 286-PI-T-007

4"-A-3 3/4"-A-3
1"-A-3

10"-CWR-280-061-L1

16"-CWS-280-061-L1

10"-CWS-280-061-L1
FROM HYDROMET ELECTRIC
STEAM BOILER FEED WATER
SAMPLE COOLER
1"-CWR-280-015-L1 TO BOILER FEED
1725 280-PI-T-023
WATER SUPPLY
FROM ADM CRYSTALLIZER SAMPLE COOLER
SURFACE CONDENSER 1"-CWS-280-13297-L1 1906 280-PI-T-020
286-CD-140
8"-CWR-286-050-L1
1681 286-PI-T-005 TO CRYSTALLIZER
SURFACE CONDENSER
286-CD-140
FROM ADM CALCINER
MOLYBDIC OXIDE COOLER 8"-CWS-280-11720-L1
1657 286-PI-T-005
287-CK-110
2"-CWR-287-071-L1-PP 8"-B-13-GO
1685 287-PI-T-004 TO CALCINER
-PP MOLYBDIC OXIDE COOLER
287-CK-110
2"-CWS-280-068-L1-HC
FROM AUTOCLAVE AGITATOR 1659 287-PI-T-004
-HC
SEAL COOLING SYSTEM
16"x10" 2"-A-3
2"-CWR-282-11735-L1
1679 282-PI-T-014
16"x10"
FROM AGITATOR SEAL
CIRCULATION COOLER
282-CK-001 TO AUTOCLAVE AGITATOR
1"-CWR-282-058-L1 SEAL COOLING SYSTEM
1913 282-PI-T-013 2"-CWS-280-11718-L1
1656 282-PI-T-014
FROM BOILER FEED WATER 2"-A-3
SAMPLE COOLER 1"-A-3 TO AGITATOR SEAL
1"-CWR-280-13299-L1 CIRCULATION COOLER
1907 280-PI-T-020 282-CK-001

16"-CWS-280-061-L1
1"-CWS-280-058-L1
1658 282-PI-T-013
FROM RECIRCULATING
CONDENSER COOLER 1"-A-3
283-HX-008 TO HYDROMET ELECTRIC
8"-CWR-283-059-L1 STEAM BOILER FEED
1683 283-PI-T-003 WATER SAMPLE COOLER
1"-CWS-280-032-L1
1727 280-PI-T-023

12"-CWR-280-061-L1
FROM FILTER PLANT
AIR COMPRESSORS
16"x12"
245-GC-001 THRU 003 TO RECIRCULATING
6"-CWR-245-005-L1 CONDENSER COOLER
1161 245-PI-T-007 283-HX-008
8"-CWS-280-057-L1
1654 283-PI-T-003
FROM AIR COMPRSSOR
PACKAGES 12"x8" 8"-B-13-GO
265-GC-011 THRU 015 TO FILTER PLANT
8"-CWR-265-007-L1 16"x12" AIR COMPRESSORS
1082 265-PI-T-001 245-GC-001 THRU 003
6"-CWS-280-030-L1
1172 245-PI-T-007

12"x8"
6"-B-13-GO TO AIR COMPRESSOR
PACKAGES
265-GC-011 THRU 015
8"-CWS-280-008-L1
2540 265-PI-T-001
8"-B-13-GO

245-03-04
TO HYDROMET
COOLING TOWER
16"-CWR-280-061-L1 280-CT-001
1690 280-PI-T-009

DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL

QUALITY CONTROL

DISCIPLINE MANAGER NAME SIGN


DOCUMENT CONTROL

THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN NAME SIGN AND STAMP

SCALE : PROJECT
REFERENCES REVISIONS REVISIONS NOTICE SHEET SIZE

DWG. NO. TITLE NO. DESCRIPTION BY CHECK APPROVED DATE NO. DESCRIPTION BY CHECK APPROVED DATE
A1 TOROMOCHO PROJECT
THIS IS A COMPUTER GENERATED DRAWING. ALL
000-PI-T-001 PIPING LEGEND P&ID A ISSUED FOR INTERNAL REVIEW EAD VVD TT RC 02/09/10 CHANGES HERE TO SHALL BE PERFORMED USING
AREA
CADD ONLY. DRAWN BY: JMR/MKM DATE : 11/12/09 280-GENERAL Mo HYDROMET UTILITIES C-560 REVISION
000-PI-T-002 INSTRUMENTATION LEGEND P&ID B ISSUED FOR CLIENT APPROVAL JMR SKR JHL RC 02/01/11 THIS DRAWING IS THE PROPERTY OF AND EM BODIES
PROPRIETARY INFORMATION BELONGING TO AKER TITLE CAD NO.
SOLUTIONS AND MUST BE RETURNED IMMEDIATELY CHECKED BY: JHL DATE : 02/01/11
0 ISSUED FOR CONSTRUCTION MKM JHL JHL RC 04/21/11 UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE
OR IN PART, NOR THE INFORMATION SHOWN THERE
ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE
1 UPDATED AND RE-ISSED FOR CONSTRUCTION CAC JHL JHL RC 07/22/11 JHL DATE : 07/22/11 COOLING TOWER 560-280-PI-T-010
WRITTEN PERMISSION. APPROVED BY:
2
2 UPDATED AND RE-ISSED FOR CONSTRUCTION OBM APP MMB RC 05/11/12
AUTHORIZED BY: RC DATE : 07/22/11 COOLING WATER DISTRIBUTION
DWG. NO.

MINERA CHINALCO PERU S.A. P & ID


MCP APPROVED: TO DATE : 04/21/11 280-PI-T-010
10-05-2012 17:05:25

You might also like