Professional Documents
Culture Documents
280-PI-T-010
1. FOR GENERAL NOTES, SEE DRAWING 000-PI-T-001.
2. BLOWDOWN FOR COOLING TOWER.
FROM 280-LSL-0141
CLOSE
2489 280-PI-T-011
TO 280-LSL-0381
FIT FIC OVERRIDE
2765 280-PI-T-027
0111 0111
FAL
FE FV
+ +
4"-A-3 3/4"-A-3
1"-A-3
10"-CWR-280-061-L1
16"-CWS-280-061-L1
10"-CWS-280-061-L1
FROM HYDROMET ELECTRIC
STEAM BOILER FEED WATER
SAMPLE COOLER
1"-CWR-280-015-L1 TO BOILER FEED
1725 280-PI-T-023
WATER SUPPLY
FROM ADM CRYSTALLIZER SAMPLE COOLER
SURFACE CONDENSER 1"-CWS-280-13297-L1 1906 280-PI-T-020
286-CD-140
8"-CWR-286-050-L1
1681 286-PI-T-005 TO CRYSTALLIZER
SURFACE CONDENSER
286-CD-140
FROM ADM CALCINER
MOLYBDIC OXIDE COOLER 8"-CWS-280-11720-L1
1657 286-PI-T-005
287-CK-110
2"-CWR-287-071-L1-PP 8"-B-13-GO
1685 287-PI-T-004 TO CALCINER
-PP MOLYBDIC OXIDE COOLER
287-CK-110
2"-CWS-280-068-L1-HC
FROM AUTOCLAVE AGITATOR 1659 287-PI-T-004
-HC
SEAL COOLING SYSTEM
16"x10" 2"-A-3
2"-CWR-282-11735-L1
1679 282-PI-T-014
16"x10"
FROM AGITATOR SEAL
CIRCULATION COOLER
282-CK-001 TO AUTOCLAVE AGITATOR
1"-CWR-282-058-L1 SEAL COOLING SYSTEM
1913 282-PI-T-013 2"-CWS-280-11718-L1
1656 282-PI-T-014
FROM BOILER FEED WATER 2"-A-3
SAMPLE COOLER 1"-A-3 TO AGITATOR SEAL
1"-CWR-280-13299-L1 CIRCULATION COOLER
1907 280-PI-T-020 282-CK-001
16"-CWS-280-061-L1
1"-CWS-280-058-L1
1658 282-PI-T-013
FROM RECIRCULATING
CONDENSER COOLER 1"-A-3
283-HX-008 TO HYDROMET ELECTRIC
8"-CWR-283-059-L1 STEAM BOILER FEED
1683 283-PI-T-003 WATER SAMPLE COOLER
1"-CWS-280-032-L1
1727 280-PI-T-023
12"-CWR-280-061-L1
FROM FILTER PLANT
AIR COMPRESSORS
16"x12"
245-GC-001 THRU 003 TO RECIRCULATING
6"-CWR-245-005-L1 CONDENSER COOLER
1161 245-PI-T-007 283-HX-008
8"-CWS-280-057-L1
1654 283-PI-T-003
FROM AIR COMPRSSOR
PACKAGES 12"x8" 8"-B-13-GO
265-GC-011 THRU 015 TO FILTER PLANT
8"-CWR-265-007-L1 16"x12" AIR COMPRESSORS
1082 265-PI-T-001 245-GC-001 THRU 003
6"-CWS-280-030-L1
1172 245-PI-T-007
12"x8"
6"-B-13-GO TO AIR COMPRESSOR
PACKAGES
265-GC-011 THRU 015
8"-CWS-280-008-L1
2540 265-PI-T-001
8"-B-13-GO
245-03-04
TO HYDROMET
COOLING TOWER
16"-CWR-280-061-L1 280-CT-001
1690 280-PI-T-009
QUALITY CONTROL
THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN NAME SIGN AND STAMP
SCALE : PROJECT
REFERENCES REVISIONS REVISIONS NOTICE SHEET SIZE
DWG. NO. TITLE NO. DESCRIPTION BY CHECK APPROVED DATE NO. DESCRIPTION BY CHECK APPROVED DATE
A1 TOROMOCHO PROJECT
THIS IS A COMPUTER GENERATED DRAWING. ALL
000-PI-T-001 PIPING LEGEND P&ID A ISSUED FOR INTERNAL REVIEW EAD VVD TT RC 02/09/10 CHANGES HERE TO SHALL BE PERFORMED USING
AREA
CADD ONLY. DRAWN BY: JMR/MKM DATE : 11/12/09 280-GENERAL Mo HYDROMET UTILITIES C-560 REVISION
000-PI-T-002 INSTRUMENTATION LEGEND P&ID B ISSUED FOR CLIENT APPROVAL JMR SKR JHL RC 02/01/11 THIS DRAWING IS THE PROPERTY OF AND EM BODIES
PROPRIETARY INFORMATION BELONGING TO AKER TITLE CAD NO.
SOLUTIONS AND MUST BE RETURNED IMMEDIATELY CHECKED BY: JHL DATE : 02/01/11
0 ISSUED FOR CONSTRUCTION MKM JHL JHL RC 04/21/11 UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE
OR IN PART, NOR THE INFORMATION SHOWN THERE
ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE
1 UPDATED AND RE-ISSED FOR CONSTRUCTION CAC JHL JHL RC 07/22/11 JHL DATE : 07/22/11 COOLING TOWER 560-280-PI-T-010
WRITTEN PERMISSION. APPROVED BY:
2
2 UPDATED AND RE-ISSED FOR CONSTRUCTION OBM APP MMB RC 05/11/12
AUTHORIZED BY: RC DATE : 07/22/11 COOLING WATER DISTRIBUTION
DWG. NO.