You are on page 1of 1

800

529
5
103
5
800
529
5
103
5
800
529
5
103
5
A 15.03.2019 J.H.JEON G.Y.KIM S.Y.JEON FOR APPROVAL

Rev. Revision Date Created by Checked by Approved by Description

Revision History

Description Latest Revision :


Stamp

FOR APPROVAL
Owner

JAWA SATU PO ER
Owner's Engineer

Project Title

JAWA-1 COMBINED CYCLE GAS


TURBINE POWER PLANT (1760MW)
Contractors

M EI N DO
ELANG INDAH
SAMSUNG C&T
Replaces Scale Project Document Code
- - JAW/00/K/A-----EP78/IT/177
Responsible dept. Created by Checked by Approved by Format
TRANSMISSION LINE J.H.JEON G.Y.KIM S.Y.JEON A3
Originator Document Type Document Status
DRAWING Issued For Approval
Title, Subtitle Identification number

© COPYRIGHT 2018 SAMSUNG C&T SAMSUNG C&T Wire Clearance Diagram J1-SCT-DRG-L00-0149

All rights reserved. This document is the property of SAMSUNG C&T and all associated companies. It must not be copied, loaned or transferred nor must Tower Type DD Rev. Date Lang. Sheet
the information it contains be disclosed to any third party without the written consent of SAMSUNG C&T. A 15.03.2019 En 2/2