Address : 41 gaytri nagar agar road Mob: 8965019592 Ujjain (M.P) India 456001 Date of Birth 30-01-1981 PROFILE WORKING I have 11 year Experience in MEP Execution work in many Construction projects like 01.2018 - present High rise building, Residential township, Mall and Kajima India Pvt. Ltd. multiplex, Industrial MEP Engineer (Mechanical) and Kabul Parliament project. Omori India Pvt. Ltd. Rania New Plant Vadodara (Gujarat) EDUCATION 01.2017 - 01.2018 2001 - 2007 Sharma And Associates Firetech Pvt. Ltd. Medicaps institute of technology and Project Engineer (Mechanical) management 03.2015 - 12.2016 Mechanical Engineering BSC-C&C 'JV' 2013 - 2015 Assistant Manager MEP EIILM University Afghan Parliament Building Kabul Afghanistan Correspondance MBA (Material Management) Project
05.2014 - 03.2015 SKILLS
Hitachi Plant Technology India Pvt. Ltd. Microsoft Office Mechanical Engineer AutoCAD Ford Vehicle and Assembly Plant Project Sanand Ahmadabad Gujarat MEPF Execution Project Management 05.2013 - 05.2014 Dainik Bhaskar Group Contract Managemnt MEP Engineer Quality Control DB City Township Project Gwalior (M.P) Project Planning 09.2011 - 05.2013 Entertainment world developers pvt. ltd. PERSONALITY MEP Engineer Communicative Indore Treasure Market city,PVR Cinemas,Daiwik Hotel Punctuality Pvt. Ltd. Project Creativity 06.2009 - 09.2011 Organized Sharma and associates firetech pvt. ltd. Project Manager LANGUAGES Ujjain Treasure Bazaar,SEL Textile Industries,Central Hindi Mall Indore Project English 08.2007 - 06.2009 Firepro System Pvt. Ltd. Site Engineer Seven Seas Mall Vadodara, Kohlar Glass Industries Ankleshwar project PROJECT DETAIL RESPONSIBILITIES AND JOB (1) Omori New Plant Rania Vadodara Gujarat PROFILE (2) Apollo Hospital Indore 1. Coordinate with site team,contractor's person in (3) Parliament Project Kabul Afghanistan. (4) Ford Vehicle and Engine Assembly Plant Sanand daily site coordination meeting and discusses all Gujarat issues and resolve. (5) Dainik Bhaskar Group, DB City Project in Gwalior 2. Facilitate problem solving, as may arise, between (6) Indore Treasure Township Bijalpur MEP Subcontractors during construction. (7) PVR Cinemas 3. Validate design issues related to MEP and suggest (8) Indore Treasure Market City. (9) SEL Textile Ltd. alternative solutions. (10) Indore Central Mall 4. Assist in the receipt and review of MEP submittals (11) Ujjain Treasure Bazaar and Shop drawings submit by the contractors. 5. Log and post all MEP changes and as-built CERTIFICATION information on field drawings. (1) Appreciation Certificate From Afghan Parliament 6. Assist in the scope review, budgeting and Building Kabul Afghanistan. (2) Safety Certificate From Hitachi Plant Technology. justification of MEP change work order. (3) Dainik Bhaskar Group (DB) 7. Assist in the installation of MEP work.Direct (4) Entertainment World Developers Pvt. Ltd. (EWDPL) monitor and control the activities of MEP (5) Sharma And Associates Firetech Pvt. Ltd. Subcontractor. 8. Coordinate with contractor MEP related MAR,MSR PASSPORT DETAIL and shop drawing control sheet preparation. Passport No. : Z3914885 Issue Place : Bhopal (M.P) 9. Coordinate with the contractor on daily basis DOI : 20/06/2017 related mechanical services site issues,planning. DOE : 19/06/2027 10. Provide advice to the Project Director in regard to any mechanical services related variation costs that DETAILS may be claimed by the Contractor during the course Whatsapp no. : 8965019592 of the works. Skype Id : akshay.jadon32 LinkedIn Id: www.linkedin.com/in/akshay-jadon- 11. Review and comments submit by the Contractor’s 43059363 operation and maintenance manuals,Shop drawings,MAR,DAF and MSR etc. REFFREANCE NAME 12. Attend project progress meetings,site coordination Name : Mr. Savio Almaida meeting as required with the contractor's. Designation: HR Manager 13. Attend the Project Manager’s internal meetings to Company: Kajima India Pvt. Ltd. Contact No. : 09435186829 resolve specific site problems and critical issues as Name : Mr. Sumit Cowshik required. Designation: DGM 14. Review and approve Contractor’s ‘as built’ Company: BSC-C&C ‘JV’ Kabul Afghanistan drawings and erection bills. Contact No. : 09501107901 15. Prepare the MEP master schedule,AMR tracking sheet and Material procurement schedule for project planning and achieve the target.