RUM JUNGLE
REHABILITATION PROJECT
INPLENENTATION REPORT =. “i
VOLUME 1 REPORT 1
OCTOBER 1981 |
PREPARED BY
DEPARTMENT OF TRANSPORT AND WORKS |
~ WATER DIVISIONSECTION 1
11
1.2
1.3
SECTION 2
2.1
2.2
2.3
2.4
SECTION 3
34
3.2
3.3
3.3.1
3.3.2
3.3.3
3.3.4
3.3.5
INDEX
TERMS OF REFERENCE
The Comission of the Project Group
Objectives of the Report
Relevant Documents for Background Informat ton
PROJECT TASK FORCE
Structure of the Task Force
Project Resources Requirements
N.T. Government Resources
Project Task Force Organisation Chart
PROJECT REHABILITATION CRITERIA
Purpose for Criteria
Expected Life of the Rehabilitation Works
Rum Jungle Rehabilitation Standards
Water Quality
Radiation/Randon Emanation Levels
Flora Revegetation
Fauna/F isheries Rehabilitation
Land UseSECTION 4
4
42
4.2.1
4.2.2.
4.2.3
4.2.4
4.2.5
4.2.6
4.2.7
4.2.8
SECTION 5
5.1
5.2
5.3
5.4
SECTION 6.
6.1
SECTION 7
mw
1.2
DETAILED SITE INVESTIGATION PROGRAMMES
Reasons for Further Investigations
Detailed Programmes
Sofls Classification and Quantity Survey
Surface/Groundwater Hydrological and Quality
Survey
Radiation and Radon Emanation Survey
Wetal lurgical /Geochemical/Geology
Investigations
Flora/Fauna Base Data Study
Meteorological Data Collection
Topographical/Land Survey
Bathymetric Survey
DESIGN AND SITE WORKS CRITERIA
Results of Investigations
Design Criteria and Unresolved Problems
Detailed Design and Documentation
Site Works
MONITORING PROGRAMME
Collection of Base Line Data and Monitoring Programme
PROJECT COST ESTIMATES
General: Previous Estimates and the Degree
of Confidence
Sumary of Estimates