Professional Documents
Culture Documents
Components
1 Alien
ware 17 R5
port shuts while the drain valve port opens. During the backwash process, pressure
is released and the spine�s piston
As per ISBL process inputs - Hazardous area classifications for the ISBL in
existing
Sludge Holding & existing Ballast Tank Farm will be same as existing refinery ETP
area is
�classified� however for Barat tank farm area classifications for the new ETP
1 Power Cord (UK)
1 Additional Software
Software
Service
Water Pumps (1 x 20 m3/hr & 1 x 10 m3/hr) are considered for rain water
1 Limited Warranty:Yr1 Collect & Return (Labor)