You are on page 1of 2
._D. DYNACIATE ENGINEERING SDN BHD 101772, 20N 128, AWASAN PERINDUSTRIAN PASIR GUDANG, [section “Habe oo nev. 32 Bywnciare 51700 PASIR GUDANG, JOHOR, MALAYSIA pate: sana WELDER CONTINUITY LOG Name ‘Mow NURULAFIQ Wen. se0i2s.115265 Welder No. yaweo3t WeldingProcess + oTaW Weng 7] NOE Wisal Verfed by THT no] Project no. pred vate | Veries by eNO. | aeport Dat» | Report No. | "PH ac | cent Weider 1 | quattication | 12.08.2018 | ovwar-204 | 12022019 Test (wan) s ese/1437/ 2| 1a7movec | 2os2.208 | zz27155 | 12082019 paaisioss 2 “This og on ts own Qualifies the welder for 6 months from the date of sue. eyond ths date, \weldng records must be const to ensure the satisfactory performance has been mantaned. DYNACIATE ENGINFFRING SON BHD 101772, 200 128, KAWASAN PERINDUSTRIAN PAR GUOANG, JRev. 2 [smiion abi Svnnginre SIROTA GHNANG OREN MAUS (pe restnas WELDER CONTINUITY LOG sane ono naanza tere besos waar, | DYNES Wing ocess + GTA SHAWSAW = (ine, rina] WTB some Pucca] Wetev FT io] woman. | aRT | NETTESTT cnt oe | vere | YOY iter 1 cuntreaton | 2t0nz03 | ovwarse | 220201 "esr vier 2] aaaneton | rcor2o8 | ovwarse | sscnan9 Tex) 3 | 17 moot esos possjoz. 2.032019 “This log ons own Qualifies the neler for 6 month rm he date of sue. Beyond this date, welding records mast be consulted to ensure the satstactory performance hasbeen mantle.

You might also like