Punch list

1 FW upgrade to resolve CLI command issue

2 Integration DPTech firewall to EMS

3 4G export based on ECGI


4 CSFB vs HO 4G to 4G failied

5 Ping issue from loopback to internet Gi interface

Data lost when active GGSN/PGW power off. System detect alarm too slow,
6 takes 80s-90s to detect the alarm, request system can detect alarm less than
20s.

7 no priority in the command ADD SGSNHOST, then need to explain how


system selects the host; and how service flow at that time
8 Validate smart paging configuration on MME
9 Separate DNS in different uMAC for redundant

10 Provide table name in database of uMAC, xGW, EMS for all Performance
measurement

11 LTE user but no PGW server information and xGW1 select instead of xGW3

12 offload all 4G user from uMAC1 to uMAC2.


During offload, new user still access to the offloading uMAC. Then request
13 the offloading uMAC will prevent new user to access but current user
service is not effected.

14 HO 4G to 3G low success rate (KPI)

15 KPI PDP success rate downgrade after cutover, need to collect all error code
from xGW

16 KPI attach SR is very low with error on MME, SGSN; need to check what is
real error

17 KPI PDP-S on SGSN low success rate

18 SMS MO success on SGs is very low 50%

19 CSFB MT success is very low

20 software Parameter Configuration document descriptions

21 Pre-defined Timer document descriptions

Note: Attached on PAT document


ZTE comments Deadline
contact Dptech to get upgrade version and document 28-Feb-17
first.
the current version of EMS can support DP firewall 5-Feb-17
integration.
2017.1.20 provide MME version 5-Feb-17
checking the reason now. 5-Feb-17
can make ping test with loopback, but need all the route
can be back from public network. Try to use public ip to 5-Feb-17
test

R&D confirmed can not be less then 60s, confirm if it


can be changed to be more less in the next version. If 5-Feb-17
not, explain the detail.

confirm tonight. 5-Feb-17

answered by wangxiaoqing 5-Feb-17


discuss the date plan with bitel 5-Feb-17

provide the simple and interface ducument 5-Feb-17

confirm tonight. 5-Feb-17

confirm tonight. 5-Feb-17

confirm tonight. 5-Feb-17

need to check 5-Feb-17

need to check 5-Feb-17

need to check 5-Feb-17

need to check 5-Feb-17

need to check 5-Feb-17

need to check 5-Feb-17

MME and SGSN document will be finished in 2017 April 31-Mar-16

MME and SGSN document will be finished in 2017 April 31-Mar-16


Update Progress

on going

on going

on going
Answered

Answered

Answered

Answered

Answered
Ready

Answered

Answered

Answered

Answered

Need to check, New Network of 4G, should be


optimized
Need to check, New Network of 4G, should be
optimized
Need to check, New Network of 4G, should be
optimized
Need to check, New Network of 4G, should be
optimized
Need to check, New Network of 4G, should be
optimized
Need to check, New Network of 4G, should be
optimized