Professional Documents
Culture Documents
Date: Time:
Lock Number: Tag/Lock holder Name:
Equipment Involved: Team Leader completing form:
Manager:
Actions
1. Determine if Lock / Tag holder is still on Inspect clock card.
premises Findings/Action:
Manager/Supervisor Signature:
___________________________
2. Attempted to contact Lock / Tag holder at Findings/Actions:
Home:
Witness Signature:
___________________________________
Items removed (Please tick)
□ Personal Safety Lock Removed □ Danger Tag removed
□ Barrier Tape/Temporary Barricades □ Other (specify)
Another person’s Personal Lock Out Tags and Personal Safety Locks can only be removed by the
production Manager/Maintenance Manager, after all steps on this form have been carried out to
locate or contact the original person who applied the Lock Out / Tag.