You are on page 1of 5

UNITATEA/UNIT Fire Detectors and Central Panel

ŞANTIER/SITE SIBIU WWTP PUNCT DE LUCRU/WORK SECTION


OBIECTUL/OBJECT

Raport de Acceptare a Calităţii/ Report of Quality Acceptance

Nr./No DATA/DATE 2/8/2007

Data Inspectiei/Inspection Carried Out At:

Echipamente livrate in santier.


Equipment delivered for General Site Buildings

Documentatie Folosita/Document Used:

Facturi / Documente Vamale


Invoices / Costumes.

Din Verificarile Efectuate pe Teren si Examinarea Documentelor au Rezultat Urmatoarele / Findings, as a


Result of Site Inspections and Document Examination:

Fire Detectors and Central Panel/ BOQ No. 4.38.3

Au Fost Stabilite Urmatoarele Masuri (concluzii)/Measures Taken (conclusions reached):

Echipamentele depozitate in mod corect.


Properly stored / installed.

Mentiuni Speciale/Special Observations:

Echipamentele corespund specificatiei din contract


Equipments are comply with contract specification.

ENGINEER BENEFICIAR CONTRACTOR

Numele/Surname CORFAR POPA SAYIN


Prenumele/ Firs Name ADRIAN DAN TAMAY
Semnătura/ Signature:
UNIT_________________
_____________________
_____________________
___________________
SITE_________________
_______ WORK
SECTION_____________
_____________________
______

OBJECT______________
_____________________
_____________________
___________________

REPORT OF QUALITY ACCEPTANCE


No._______ Date__________

Inspection carried out at:

_____________________
_____________________
_____________________
_____________________
_____________________
_____________________
_____________________
___________________
Documents used:
_____________________
_____________________
_____________________
_____________________
_____________________
_____________________
_____________________
___________________
Findings, as a result of
Site Inspections and
document examination

_____________________
_____________________
_____________________
_____________________
_____________________
_____________________
_____________________
___________________
Measures taken
(conclusions reached)

_____________________
_____________________
_____________________
_____________________
_____________________
_____________________
_____________________
___________________
Special observations:

_____________________
_____________________
_____________________
_____________________
_____________________
_____________________
_____________________
___________________
INVESTO DESIGNE CONTRA
R R CTOR
________ ________ ________
Surname _ ___ _
________ ________ ________
First Name _ ___ _
________ ________ ________
Signature __ ___ _

You might also like