PETRONAS GAS DEHYDRATION PLANT PHASE 2

TECHNICAL REQUISITION FOR


ENGINEERING SERVICES
REV.: A Attachment-3

ATTACHMENT-3

DEVIATION LIST

DEVIATIONS LIST
PETRONAS GAS DEHYDRATION PLANT PHASE 2
TECHNICAL REQUISITION FOR
ENGINEERING SERVICES
REV.: A Attachment-3

Sr.No Document Clause Abstract of Description Reason/ Alternate


No. & Title No / Requiremen of Deviation Justification for Proposal
Section t against Deviation
/ Para which
deviation is
presented
1 FDP- 8.1 Add CML shall Standard
COM-52- taken where practice.
MC-SP- there is
GE-015_Spe Metallurgy
c_CML change in
Baseline the specs
Survey, Rev and CML
1 shall be
taken at the
lower
metallurgy
section as
per this
standard
2 FDP- 8.1 Add CML shall Standard
COM-52- taken at the practice.
MC-SP- mixing points
GE-015_Spe
c_CML
Baseline
Survey, Rev
1
3 FDP- 8.1 Add CML shall be Standard
COM-52- taken at practice.
MC-SP- Dead legs .
GE-015_Spe
c_CML
Baseline
Survey, Rev
1
PETRONAS GAS DEHYDRATION PLANT PHASE 2
TECHNICAL REQUISITION FOR
ENGINEERING SERVICES
REV.: A Attachment-3