You are on page 1of 4

PETRONAS GAS DEHYDRATION PLANT PHASE 2

TECHNICAL REQUISITION FOR


ENGINEERING SERVICES
REV.: A Attachment-3

ATTACHMENT-3

DEVIATION LIST

DEVIATIONS LIST
PETRONAS GAS DEHYDRATION PLANT PHASE 2
TECHNICAL REQUISITION FOR
ENGINEERING SERVICES
REV.: A Attachment-3

Sr.No Document Clause Abstract of Description Reason/ Alternate


No. & Title No / Requiremen of Deviation Justification for Proposal
Section t against Deviation
/ Para which
deviation is
presented
1 GFDP- 2.3.8 Add Site Welding RT has a low
COM-51-PP- Fabrication probability-of-
SP-99-0005 Sequence- detection for
100 % Shear sidewall lack-of-
wave UT/ fusion
PAUT shall
be carried
out.
2 GFDP- 2.3.8 Delete Weekly 10%
COM-51-PP- UT and 10% Not relevant
SP-99-0005
MPI/DPI
shall be
inspected for
welders and
shall be
carried out
for Quality
purposes.
3 GFDP- 2.4 Add *All PWHT
COM-51-PP- shall be Standard
SP-99-0005 performed in procedure
accordance
with WPS as
per ASME
31.3
4 GFDP- 2.4 Delete The not Repeated
COM-51-PP- required Please follow *
SP-99-0005 unless
requires by
WPS
5 GFDP- 2.5 No clarity NDT Group 2
COM-51-PP- and Group 3
SP-99-0005
PETRONAS GAS DEHYDRATION PLANT PHASE 2
TECHNICAL REQUISITION FOR
ENGINEERING SERVICES
REV.: A Attachment-3

6 GFDP- 2.5.2 RT shall be in RT shall be


COM-51-PP- accordance in Standard
SP-99-0005 procedure
with ASME V, accordance
Article 2 with with
the following ASME31.3
additional and ASME
requirements Sec V,
Article 2

7 GFDP- 2.5.4 ASME B31.3 ASME31.3 Standard


COM-51-PP- or ASTM and ASME procedure
SP-99-0005
E709. Sec V,
Article 7
8 GFDP- 2.5.5 DP shall be RT shall be Standard
COM-51-PP- in in procedure
SP-99-0005
accordance accordance
with ASME V, with ASME
Article 6 31.3 and
ASME Sec
V, Article 6
9 GFDP- 2.17 DELETE -EN ADD ASME Standard
COM-51-PP- 1020 3.1 and 31.3 procedure
SP-99-0005 3.2

10 GFDP- 7 Results of Results of


COM-51-PP- acceptable ALL PMI
SP-99-0005 PMI tests
11 GFDP- A6 B- H1C HIC
COM-51-PP- Note 2
SP-99-0005
12 GFDP- 9- Add Surface of Standard
COM-51-PP- APPEN bends shall Procedure
SP-99-0005 DEX 2-1 be within the
reqiuired
tolerance
and be free
of defects
below
13 GFDP- 9- Add Hydrostatic
COM-51-PP- APPEN tests shall be
SP-99-0005 DEX 2-2 carried in
accordance
with ASME
31.3
PETRONAS GAS DEHYDRATION PLANT PHASE 2
TECHNICAL REQUISITION FOR
ENGINEERING SERVICES
REV.: A Attachment-3