ERA PROTECT
fe
he
IGitencoRTERETEN,
B
The, Light.
term recor
Transport,
Rail Transit prdibee was one
mmendations of the comprehensiv
Land Use & Development Plann:
£ the long-
€ Manila
ing Project
(MMETROPLAN) which wes conducted from 1976 to 1977.
‘The MMETROPLAN Study xrécommended the coi
the early 1980's of -a street-level (ate
system for Metro Manila. |
I
An inter-agency steeting group tasked t
above LRT recommendation. submitted its
in June 1878. The report identified t
Baclaran corridor to be technically fe:
operations as Line _ Immediately
President issued LOI’ 708° ox June 14, 19
a Light Rail Transit Committee to, amo!
prepare 4 detailed fedsibility study o!
No. 2., | establish | bia
evaluate bids, offers, and/or proposal
submi thes, | '
| i
The Ministry of Transportation & Commun
assumed-pverall responsibility for the
struction in
rade) LRT
evaluate the
final report
e Monumento-
sible for initial
hereafter, the
718, creating
g others,
the LRT Line
chnical parameters and
that would be
ications (MOTC)
LRT Project,=
' Line 1
soon after its creation in guiy.1979
A re-appraisal
study of Line No.1 was undertaken and completed in
November 1979. It confirmed the eco!
alignm
conflii
and, at
capacity.
+ 4. The Pre:
projec
of a
"Associ
compose:
5. In June,
economi|
nt, to Fully segregate the LR’
ting at-grade vehicular and p:
the same time, to optimize e:
ident authbrized the- implemen|
, On July 5, 1980 with the sig)
urnkey contract lwhich had bee
‘tion for the Manila LRT Syste
Hi4
d of the following-Belgian an
Charleroi |(ACEC
Brugeoise et Nivelles (BN);
Tractionel Engineering Inter:
Transurb Consult (1c); and
Philippines now
Philippine N
Corporation (PN
cL
1980, the Philippines and Be’
Ateliers de Eonteiuctions Eleetri
system
ssenger
P
ng and
Construction seen eet Corporation
2
& technical codperation agreement.
omic viability of
however, the study recommended an elevated
from
traffic.
isting road
ation of -the
approval
awarded to the
2m Construction,"
Philippine companies:
ques de
ation] (TEI);
of the
ional Construction
gium concludea an
The First
-.%iLady, Madame Imelda R, Marcos signed in behalf of the
Philippines while Belgian Ministers. Charles Ferdinand
a Nothomtb, Robert Urbain and:Raul:Hartry signed for th
ety Belgian government. The agreement provided for the
“ * granting of assistance to- the Philippines to finance “
the LRT project. Among others, the agreement also
provided for ‘the training of Filipinos by Belgian
experts in the operation and maintenance of the
railway system. t
cA de Mol tiee Al MeetreS ene apneic ae ogeld on
0 A Ranignd Pedal 0 tegen thetigh Crete Oman Me Go ) Le Unrlaneh
: eT Bep bets 2 Cacao | it me eectlo cla
6. In November 1980), detailea engineering design works
commenced and in October 1981, actual civil works
construction activities started. In July 1981, work
started with the clearing_of the area for the depot/
workshop. “In early Al gust 1981, the relocation of
MWSS, PLDT, MERALCO and’ Manila “Gas Facsetes
commenced in Taft Ave. At the EDSA-Taft Avenue
i intersection, the first among the bre than 3000
i piles was driven on September .10, 1981.
In January 1982,/the government through the National
Housil Authority started the relocation of the
7 residents from, Barrio Pilipina to dive way for the
4 Sepot/workshop site,.to a newly reclaimed area in the
nearby bon Carlos Viltage and Barris Santo Nizo in -
: Pasay City.
dy