Enabling effective collaboration is critical for increasing productivity and
delivering a robust design. With modern computer-aided design (CAD)
tools and intelligent software, designers are able to synchronize their data
more efficiently and collaborate between domains more effectively on
critical items, thereby ensuring the design intent is properly implemented.
This enables engineers to do what they do best: innovate.
www.solidedge.siemens.com
White paper | Solid Edge Wiring and Harness Design
• Electrical systems design is rarely completed in one representation of the same module displays a functional
pass. Instead, it is often an iterative process between or schematic view that transcends the physical structure
the electrical and mechanical engineer. Every time of the object. Certain electrical functions might be
there is such an iteration, each engineer must mapped to several circuit boards and connectors, mak-
reinterpret modifications. This introduces even more ing it impractical to associate a single function to a
opportunity for human error single physical part.
These shortcomings result in errors that proceed down- When designing the electrical aspect of a system, the
stream, where they manifest in issues that cause several right components must be selected, including connec-
rounds of prototyping and testing. So the assumption tors, terminals, shielding, wire material, etc. There’s
that isolated departments of design can still work effec- plenty of electrical design to ensure the system achieves
tively is no longer valid. Electrical and mechanical its required functionality. There is, however, a signifi-
design can no longer be islands of isolation. cant amount of mechanical design in the development
of electrical systems, too. The electrical connections
Impediments to ECAD-MCAD collaboration have to be carefully routed through the physical prod-
Unfortunately, facilitating collaboration between the uct and past electronics emitting electromagnetic inter-
people who are executing electrical computer-aided ference (EMI). This needs to be done so there are no
design/mechanical computer-aided design (ECAD- clashes with components, lengths are correct (respect-
MCAD) is easier said than done. The potential impedi- ing the physical reality of bend radii) and other consid-
ments are numerous. Foremost is the traditional separa- erations are taken into account, such as retention points
tion between the electrical and mechanical disciplines. are located correctly.
Electrical and mechanical engineers typically work with
As a result, there are many iterations between electrical
completely different tool sets and vocabularies. Many
and mechanical engineers to develop a good electrical
times they even reside in separate physical locations.
system. They need to share detailed design information
Furthermore, mechanical and electrical CAD systems
with each other, which requires close communication
have different ways of presenting the structure of the
and collaboration between them.
same object.
However, previous efforts to collaborate have met with
In an MCAD system, a computer module might be repre-
limited success. Earlier, ECAD-MCAD collaboration tools
sented in a physical BOM such as the screws, casing,
used everything from sticky notes and email to Excel®
circuit board and connectors. However, an ECAD
spreadsheet software. These approaches fell far short The electrical system is strongly interlinked with the
for obvious reasons. physical design so changes in the electrical system may
require changes in the mechanical packaging, too.
Electrical systems developed with a combination of a
These kinds of architectural changes – whether electri-
general purpose diagram tool, spreadsheets and 2D
cal or mechanical – are easier and cheaper to make in
CAD can be used to design and develop an electrical
the early design phase of a product.
system, but there are several risks:
Adding new intelligent software to the design process
• The items designed in each of these tools are com-
gives the engineer data about the device being
pletely disconnected from one another. That means
designed. This data can be used for simulation and
someone could change the diagram, and if that modi-
analysis purposes, which are cornerstones of a con-
fication is missed, the drawing and BOM won’t reflect
nected and integrated electromechanical design flow.
the change
Simulation also reduces the need for physical prototyp-
• Because the items in the diagram, BOM and drawing
ing, cutting both time and cost from a program.
are nothing more than lines on a drawing, there is no
Computer-based methods for simulating and evaluating
ability to perform simulations to check their function-
electrical designs represent a major step forward in
ality. Design a fuse to accommodate too little current
validating design integrity – far beyond what can be
and engineers won’t know their fuse will blow until
achieved using physical prototypes.
they physically test the design
• Because there is no intelligence in these artifacts, A typical intelligent design workflow
there is no automation in the handoff from electrical An electrical designer publishes a BOM for the electrical
design to routing the system through the mechanical system, which can then be integrated into a robust 3D
product. Mechanical engineers have to manually CAD environment, such as Siemens PLM Software’s
review the electrical design to determine which har- Solid Edge® software. With this integration, the electri-
nesses to route and where they should be placed cal system can be designed with explicit knowledge of
potential wet, hot and other exclusion zones in the
Fortunately, new design automation processes exist
mechanical design. Doing so allows the electrical design
that address these challenges. Intelligent ECAD-MCAD
engineer to take into account mechanical constraints
processes provide collaboration between engineers
when designing the electrical system. On the mechanical
working in electrical and mechanical domains.
side, space reservations can be made and the severity of
Simulation allows electrical behavior and performance
bends in the harness can be adjusted to account for the
to be forecast in order to optimize and prove a design,
wiring bundles that must route through the mechanical
and seamless cross probing between applications
structures. With access to this contextual information
enables closer integration.
from other domains, both electrical and mechanical
engineers are able to quickly reconcile incompatibilities
A new approach to ECAD-MCAD collaboration
between the electrical and mechanical designs.
It’s clear that developing modern electromechanical
systems is not an easy or simple task. Instead, it’s a The mechanical engineer wants to make sure the bun-
highly constrained and iterative process. Companies dle containing all of the necessary wires will route
need new, automated and intelligent solutions that through the allotted physical space. But the mechanical
enable true collaboration. Yet in too many development engineer does not want to create and manage these
projects today, connected and integrated design is wires in the MCAD model; it would be too difficult and
viewed as a luxury. The question should be: How much time-consuming. Instead, the electrical definition is
does it cost to have a product miss its market window? created in software such as Solid Edge Wiring and
Harness Design. The maximum allowed bundle diam-
Electrical quality can have a huge impact on the success
eter, based on various mechanical constraints, can be
or failure of a product, and simulation and analysis play
sent to the Solid Edge module, which will confirm that
a key role in the early validation of the electrical system.
synthesized or routed wires in these bundles do not
Electrical simulation during the initial design phase can
exceed this maximum allowable diameter. This can be
reveal problems that may require a fundamental rethink
done by using the automatic design rule checks func-
of the entire electrical architecture.
tionality in Solid Edge Wiring and Harness Design.
Furthermore, the addition of objects like clips, grom- Harness Design enables customers who have not typi-
mets and tubing to the harness design requires cross- cally been able to access such tools to enjoy greater
domain collaboration. These objects are best created in success and outpace their larger competitors.
a 3D MCAD environment and then merged with electri-
When used with Solid Edge 3D CAD, Solid Edge Wiring
cal data from the ECAD tool. Once this association is
and Harness Design offers capabilities with significant
made, the fully buildable wiring harness can be auto-
advantages for the collaboration between electrical and
matically engineered and fully configured.
mechanical engineers, including:
At the end of this collaborative process, each engineer
• Providing a complete set of information about the
knows that his/her part of the design works in the con-
electrical system to Solid Edge 3D CAD. This means
text of the entire system.
the mechanical engineer receives a list of compo-
nents to place and electrical connections to route.
Adding intelligence to the electromechanical
Furthermore, because Solid Edge knows which and
design process
how components are connected, it can automatically
Solid Edge electrical design software is designed to
route the wire, cable or harness, eliminating human
specifically meet the needs of midmarket customers, for
error from 3D routing
whom considerations such as ease of implementation
and low total cost of ownership (TCO) are paramount. • Communicating changes back and forth seamlessly.
This design software goes beyond traditional capabilities Cross probing and cross visualization between
in this market, bringing in sophisticated, high-end func- environments enable designers to understand signal
tionality, such as advanced simulation of voltage and routing in the 3D space, so they can determine
currents, and highlighting problem areas such as short optimal routing to avoid electromagnetic and radio
circuits and validating fuse sizing. By coupling this func- interference. One engineer simply has to push his or
tionality with its highly automated harness design and her modifications to the other and they show up in
documentation capabilities, Solid Edge Wiring and
the design. This further eliminates human error in the communicate efficiently and accurately. Today’s prod-
design process ucts aren’t functional without good electrical systems.
• Offering interactive highlighting. When an electrical Electrical design is strongly interlinked with the physi-
engineer selects a wire in the diagram, the cor- cal packaging and attributes – the resistance of a wire
responding wire in the 3D mechanical assembly is is dependent on its resistivity and length. In the early
highlighted. It works in reverse, too, with the wire days of electrical design and analysis, the definition of
in the diagram highlighted when the corresponding wire lengths, for example, was an intensely manual
wire in the 3D mechanical assembly is selected. This process. But as electrical designs became more com-
enables more accurate discussions about identifying plex, the manual approach became impractical, and
and resolving issues across engineering domains tight integration between the electrical and physical
design was developed to address the requirement to
• Adding intelligent diagrams, BOMs or drawings,
have consistent and coherent models between the
knowing that each of these representations are part
domains. This integration is achieved by creating a
of the same component, connector or wire. A change
roundtrip interface between the ECAD and MCAD tools,
in any of these places shows up everywhere, eliminat-
in which the ECAD tool contributes the connectivity
ing the potential for errors because a change wasn’t
information for each wire, along with other important
manually updated
attributes. The MCAD tool then routes the wire, cable
• Enabling electrical engineers to simulate systems or harness through the 3D physical space, and sends
and run analyses to verify that everything works as the wire lengths back to the ECAD tool. This collabora-
expected. They’ll catch the state of the electrical tive process enables faster design.
system that results in a blown fuse long before proto-
Collaboration has long been recognized as a potential
typing and testing
enabler for increasing productivity and ensuring a
• Enabling the design information to be handed off as a robust design. With modern CAD tools and intelligent
set, providing a to-do list for the mechanical engineer software, designers are able to synchronize their data
routing the system through the product more efficiently and collaborate between domains more
effectively on critical design items, thereby ensuring the
Using Solid Edge Wiring and Harness Design helps
design intent is properly implemented and can achieve
resolve the challenges of electromechanical design.
first-pass success.
Supported by industry-leading electrical software from
Mentor Graphics, now part of Siemens PLM Software, A tightly integrated electromechanical solution, such as
the tightly integrated solution enables co-design across Solid Edge Wiring and Harness Design, enables collabo-
domains. And coming from a single vendor, Solid Edge ration across domains, freeing engineers from having to
Wiring and Harness Design provides an intimate integra- attend meetings to discuss changes introduced by man-
tion that is not possible with third-party and private- ual errors. Using an intelligent design methodology, the
labelled add-ons. When used with Solid Edge 3D CAD, impact of a change in both domains can be assessed in
the capabilities of Solid Edge Wiring and Harness Design a collaborative environment, allowing engineers to do
allow companies to design and develop electromechani- what they do best: innovate.
cal systems quicker and more cost effectively.
As a tool that provides simulation, a direct connection
between multidisciplinary domains and cross-probing
Conclusion
functionality, Solid Edge Wiring and Harness Design
In most products on the market today, especially in
liberates engineers from the drudgery of manual
smart connected products, electrical systems are cru-
tasks, enabling them to spend more time creating
cial. They supply the correct power for electronic
great products.
devices, and enable multiple, interconnected systems to
Europe
Stephenson House
Sir William Siemens Square
Frimley, Camberley
Surrey, GU16 8QD
+44 (0) 1276 413200
Asia-Pacific
Unit 901-902, 9/F
Tower B, Manulife Financial Centre
223-231 Wai Yip Street, Kwun Tong
Kowloon, Hong Kong
+852 2230 3333
www.siemens.com/plm
©2018 Siemens Product Lifecycle Management Software Inc. Siemens, the Siemens logo and
SIMATIC IT are registered trademarks of Siemens AG. Camstar, D-Cubed, Femap, Fibersim,
Geolus, GO PLM, I-deas, JT, NX, Parasolid, Solid Edge, Syncrofit, Teamcenter and Tecnomatix
are trademarks or registered trademarks of Siemens Product Lifecycle Management Software
Inc. or its subsidiaries in the United States and in other countries. Simcenter is a trademark or
registered trademark of Siemens Industry Software NV or its affiliates. All other trademarks,
registered trademarks or service marks belong to their respective holders.
71985-A7 9/18 Y