Southern Expressway Extension Project Section 4

From Mattala to Hambantota via Andarawewa

INTERNAL MEMO
From :- Site Engineer Attachment Yes
Through :- Mobile :- 0710159949
To :- Highway Construction Engineer Date :- 11/07/2016
Subject :- Use of siutable Materials for pioneer road Time :-
No
Southern Expressway Extension Project Section 4
From Mattala to Hambantota via Andarawewa

INTERNAL MEMO
From :- Site Engineer (H.J.D Karunarathna) Attachment Yes
To :- QA/QC Manager (Mr.Gu Cheng Peng) Mobile :- 0710159949
Copy :- Resident Engineer (T.J Bandula) Date :- 19/09/2016
Subject :- Protection for the post tensioning strands Time :-

The contractor is not taking sufficient actions to protect the post tensioning strands which were brought
to the site. I have already given a site instruction regarding this on 13th September 2016(Copy attached).
But still they did not attend for any preventive action. Please find the photograph attached here to show
the current situation.
No

ch were brought
6(Copy attached).
ed here to show
Southern Expressway Extension Project Section 4
From Mattala to Hambantota via Andarawewa

INTERNAL MEMO
From :- Site Engineer (H.J.D Karunarathna) Attachment Yes No
To :- Highway Construction Engineer (Mr.Bai XiandeMobile :- 0710159949
Copy :- Resident Engineer (T.J Bandula) Date :- 19/09/2016
Subject :- Tensioning of Structure A2P7G2-C5 Time :-

When the tendons stressed up to 100% of Jack Force ( 1367.1 kN ), the calculted elongation
was 229mm. Which was 110.3% from the expected elongation. It exceeded the tolerence given
in the method statement (+/- 8% ), we stressed it at 75%UTS for 15 seconds and this UTS
has been taken as Design UTS of strands. These were done on your verble instruction.
This is for your confirmation please. (copy of stressing report attached)
Southern Expressway Extension Project Section 4
From Mattala to Hambantota via Andarawewa

INTERNAL MEMO
From :- Site Engineer (H.J.D Karunarathna) Attachment Yes No
To :- QA/QC Manager (Mr.Gu Cheng Peng) Mobile :- 0710159949
Copy :- Resident Engineer (T.J Bandula) Date :- 27/10/2016
Subject :- Grouting Procedure Time :-

The grouting method which is going to follow by the contractor is as belows with
your verbal instructions

1. Use 1m Flexible Hose for Inlet and Outlet for pumping the grout
2. Start pumping from one side and check the fluidity at other side
3. If outlet fluidity is satisfied (Within the range) close it and stop the pumping until the hose tighten
4. Bend the hose upward and tighten it on the GI pipe which was held vertically close to outlet
5. Continue pumping until the pressure shows 0.5MPa
6. Stop the pumping and close the inlet hose
7. Bend the hose upward and tight it on the GI pipe which was held vertically close to inlet
8. Open the both side hoses and re-fill it again, when the fluid level goes down

This is not the procedure described on their method stattement submitted via letter
No.CHEC/RDA/SEEP/CONT/S4/0 1.39/0/001435 and approved by us via Letter
No.FSDI/CHEC/831.
Also as per the Cl.553.7.1 Of Technical Specification (page 38 of 144) "The outlet valve shall
then be closed, and the pumping pressure held momentarily ". Also As per the BS-EN
446:1996, cl.7.6 NOTE.2 says that "This may be facilitated by maintaining a pressure of
0.5MPa for 1min"

This is for your confirmation of the aforesaid procedure which is going to carryout by the contractor.
Southern Expressway Extension Project - Section 4
From Mattala to Hambantota via Andarawewa

INTERNAL MEMO
From :- Team Leader Attachment Yes No
To :- All Staff Mobile :- 0769366188
Copy Date :- 19/12/2016
Subject :- Updated Numbering System for Site Instruc Time :-

Please be informed that the following numbering system is required to be followed as


appropriate when issuing Site Instructions to the Contractor.

File No To be issued by

ESEP-S4 / SI / SE / 01,02.. Site Engineer


ESEP-S4 / SI / Geo / 01,02… Geotechnical Engineer
ESEP-S4 / SI / Str.Design / 01,02.. Structural Design Engineer
ESEP-S4 / SI / Hwy.Design / 01,02.. Highway Design Engineer
ESEP-S4 / SI / Pavement / 01,02.. Pavement Specialist
ESEP-S4 / SI / Str.Construction / 01,02 Structural Engineer Construction
ESEP-S4 / SI / Survey / 01,02.. Surveyor
ESEP-S4 / SI / Hwy.Construction / 01,0 Highway Construction Engineer
ESEP-S4 / SI / HSE / 01,02.. HSE Manager/Env.Specialist
ESEP-S4 / SI / Material / 01,02.. Material Specialist/ Material Engineer
ESEP-S4 / SI / QAQC / 01,02.. QAQC Manager

Dong Wei
Team Leader
ESEP-S4