You are on page 1of 24
— - ENP ane Ea e2PagBT 22 Feb 2816 19:88. _ _ PAB1Z824 THE GENERAL PETROLEUM Co. S.A.E GPC 8, DR. MOUSTAFA ABOU ZAHRA ST. NASER CITY - CAIRO Jn case of had trancmission, please contact fax no, 707.24034076 To: ENPPI FAX: is, ATTENG. Manal Khalifa 22 #438 | Chairman Assistant proposal & contracts division SUBJECT - Upgrading AL-hamd station to an integrated oil treatment facility DATE : 21/2/2016 Reference to A/M subject, and your letter dated Jan 11,.2016, please find attached our reply on Enppi clarification No.1 We request to send us your representative to hand over a hard copy reply for some items, where they are not available as a soft copy Best regards... "CHAIRMAN ASSISTANT FOR PLANNING AND ROJECTS ENG. ADEL ABDEL NABI —Mihenond!:. 23 payer --- @ Feb 2616 15°88... PAB2/B24 Fan:22 744981 __. - . —ENPPT PCS 2.0305 Empp! PAGE 10F 6 PROJECTNo : 8700-108 CUSTOMER INFORMATION NEEDS LIST CUSTOMER : GENERAL PETROLEUM COMPANY ': UPGRADING EL HAMD STATION TO AN INTEGRATED OIL TREATMENT FACILITY 10 ISSUED BY : Enppi ISSUE DATE: 11/01/2016 ORIGINATING | REQUEST RECEIPT DISCIPLINE DATE DESCRIPTION NEED DATE DATE: REMARKS Please submit the total feed stream flow used in the design of the . This flow rate skould linclude the flow rate of the oil, gas & lwater phases. Gross 40000 (BPD) & net 30000 (BPD) & W.C (25:40%) VOL.& attached no.(1} 11/01/2016 Please submit the detailed compositional lanalysis of the ‘otal feed stream that will lbe used in the design cf the new facilities. ‘The composition should ude the detziled components lof any petroleum components included 1VO12016 fi, the components breakdown (ex. c36+), This composition should cover the feed stream thee phases and include any contaminants (such as ‘oral suifur, sand, |H; nercaptans, salt content, BS&W, nitrogen, eholrides, wax, toral acidity number, CO,,asphaltenes content, lash content, metals content, corrosive attached no.(1) --- @ Feb 2616 15°88. _ _ _PAB3/824 Fan:22 744981 __. - . —ENPPT CUSTOMER INFORMATION NEEDS LIST Exnppi 8700-100 PAGE 20F 6 GENERAL PETROLEUM COMPANY PROJECT: UPGRADING EL HAMD STATION TO AN INTEGRATED OWL TREATMENT FACILITY ISSUE No: 0 ISSUED BY : Enppi ISSUE DATE: 11/01/2016 SERIAL No ‘ORIGINATING DISCIPLINE ‘REQUEST DATE DESCRIPTION NEED DATE ‘RECEIPT DATE REMARKS fete...) that need to be considered in the \design of the new facilities. 11/01/2016 [Please submit the complete detailed lanalysis of the fresh water stream. attached no.(2) notes: using shegar water for desaltation& nile awter for hot water eycle Process 11/01/2016 Please submit the feed stream crude oil ltansport special properties at the ldifferent (at least three) operating mis range including but not to oil emulsion viscosity, pour point, ete. [Furthermere, please sudmit the feed stream crude oil Flash Point and RP. attached no.(3) 11/01/2016 [Client is requested to submit the detziled lanclysis of the produced water coming lwith the feed stream. PCS 42-0805,

You might also like