Load  Added Net 

Set  HSA  W/C  Conc.  Amb. 


Date Mix Design Location 4 7 14 28 28 28 56 Size  WR Water  Mixing  Slump Air Comments
Trial  Number (L) Ratio Temp C Temp C
(m3) (L) Water (L)
Mix #
1 29‐Nov‐18 35 Mpa Rev 5.0  Sonic Plant 21 25.5 31.9 33.8 34.4 34.3 36 3 40 4.50% 16.5 Test completd at the truck chute
1 29‐Nov‐18 35 Mpa Rev 5.0  Sonic Plant 22 24.7 18.1 33.1 32.7 34.4 33.1 3 40 5.90% 16.5 Test completed at the end of the pump 
2 27‐Feb‐19 35 Mpa Rev 6.0  Sonic Plant 23 32.3 35 38.9 37.3 38.1 4.5 45 4.90% 15.0 ‐6.0
3 8‐May‐19 35 Mpa Rev 6.0  East WingWall 25 19 21 X 20.2 X 6 877 0.385 ‐13.000 35 4.50% 24.0 22.0 No Ice Added
3 8‐May‐19 35 Mpa Rev 6.0  East WingWall 26 16.5 24.1 25.4 X 28 7 724 0.272 284.000 60 4.90% 21.5 22.0 No Ice Added
4 16‐May‐19 35 Mpa Rev 6.0  Sonic Plant 2 23.4 26 29.6 40 5.50% 17.5 No Ice Added
5 24‐May‐19 35 Mpa Rev 6.0  On Site after West WW 3 22.4 28.4 31.6 3 0.57 1.975 402 0.353 30.000 60 5.90% 16.0 17.0 180 kg of ice added
6 28‐May‐19 35 Mpa Rev 6.0  On Site  4 30.5 34.3 3 0.57 1.975 418 0.367 14.000 35 4.20% 16.0 22.0 130 kg of ice added
7 31‐May‐19 35 Mpa Rev 6.0  On Site  5 28.1 3 0.57 1.975 419 0.368 13.000 45 4.90% 13.5 19.0 97 kg of ice added
8 3‐Jun‐19 35 Mpa Rev 6.0  On Site  6 31.5 3 0.57 1.975 431.8 0.379 0.200 30 5.20% 14.0 14.0 100 kg of ice added