DATE ACTIVITY
May 06, 2019 Orientation about safety measures and designation
(Monday) of work activities with the assigned personnel.
May 07, 2019 Observation of Crusher, Concrete and Asphalt
(Tuesday) Plant production.
Observation of crasher operation, process and
capacity of every jaw crasher (Primary and
Secondary Jaw).
Interpreting the schematic diagram of Concrete
and Asphalt Plant.
Assisted in monitoring the operation of the
concrete and asphalt plant in the control room.
May 08, 2019 Cleaning of trucks and machines or equipment
(Wednesday) used during operation in the batching plant.
Repairing of pan machines of the asphalt plant by
checking the blower and changing the pam belt.
May 09, 2019 Observed the different materials used for road
(Thursday) repair.
Observation about pouring of roadways at
Carpenter Hill.
May 10, 2019 Observation of the Flood Control and Drainage
(Friday) structure at Barangay Sto. Nino, Koronadal City.
Monitored the pouring of copping and excavation
of drainage.
May 11, 2019 Observed the pouring of Bridge Slab and Girder at
(Saturday) Timuguines, Lambayong, Sultan Kudarat.
IANNE SILVEDERIO
Human Resource Manager
Gemma Construction Supply Inc.