Combined Cycle Gas Turbine Plants in India

CCGT Plants in India - other states

Dabhol
Location: Maharashtra HPL Cogen
Operator: Ratnagiri Gas and Power Pvt Ltd Location: West Bengal
Configuration: 1 X 670-MW, 2+1 CCGT, 2 X 740-MW Operator: Haldia Petrochemicals Ltd
2+1 CCGT with 9001 FA gas turbines Configuration: 110-MW, 2+1 CCGT with 6551B gas
Fuel: naphtha, natural gas, distillate oil turbines, 17-MW steam set, CHP
Operation: 1999-2007 Dadri Fuel: naphtha, natural gas, LFO, refinery residues
HRSG supplier: Vogt, Kawasaki Location: Uttar Pradesh Operation: 2000
T/G supplier: General Electric Operator: NTPC Ltd HRSG supplier: L&T
EPC: Bechtel Configuration: Two 409-MW, 2+1 CCGT blocks with T/G supplier: GE, ABB
Quick facts: Dabhol is on a 1,700ac coastal site V94 gas turbines EPC: L&T/S&L
about 160km south of Mumbai. It was originally Fuel: natural gas, oil Quick facts: In Aug 1997, the engineering contract
developed by Enron and budgeted at $2.8bn with 3 X Operation: 1992-1994 for this CCGT at the HPL works in Midanpore Dist
695-MW CCGT blocks an an LNG terminal. After HRSG supplier: Biro was awarded to L&T. This integrated naphtha-based
7yrs of development, Unit-1 was dedicated in May T/G supplier: Siemens, BHEL petrochemical complex is at Haldia, a major river
1999, about 2yrs behind the original schedule. The EPC: Lahmeyer, Tata port town about 60km from Kolkata at the
$1.8bn Phase-II financing closed in Apr 1999 and in Quick facts: This is one of the early Indian CCGT confluence of Hugli and Haldi Rivers. The cracker
Jun, a $300mn order was placed with GE for two CC plants. The site is on the Upper Ganga Branch and associated process units produce ethylene,
209FA blocks. From Jan to May 2001, the four Canal in Gautambudhnagar District. Ga is supplied propylene, and other materials. HPL Cogeneration
Phase II GTs were progressively synchronized and from the HBJ Pipeline. The plant cost Rs 960.35 Ltd was set up as a 49:51 power generation joint
steam blows completed on the HRSGs. The Dabhol- Crore and was built with financing assistance from venture between HPL and L&T, but in May 2008,
2 steam turbine was rolled in April and the Dabhol-3 KfW. HPL bought out the L&T stake and also began
steam set was nearly ready for testing when work preparations to partially switch the plant to natural
was halted on 17 Jun 2001. In May 2001, MSEB gas. Two auxiliary boilers and duct-firing systems
unilaterally rescinded the DPC PPA and Dabhol allow for the production of up to 480 tph of process
Phase I was shutdown. Finally, the state steam. In 2006, Evonik obtained a 6yr O&M
government and other parties took over the project, contract for the HPL plant.
which gradually returned to service during 2006/07,
first on naphtha and finally on natural gas as
originally designed.

Kathalguri Kayamkulam
Karuppur Location: Assam Location: Kerala
Location: Tamil Nadu Operator: Northeastern Electric Power Corp Ltd Operator: NTPC Ltd
Operator: Aban Power Co Ltd Configuration: Three 97-MW, 2+1 CCGT blocks with Configuration: 360-MW, 2+1 CCGT with 9001E gas
Configuration: 120-MW, 1+1 CCGT with 6001FA gas 6001 gas turbines (Block 1) and M251 gas turbines turbines
(Blocks 2&3) Fuel: naphtha
turbine (Blocks 2&3) Fuel: naphtha
Fuel: gas Fuel: natural gas Operation: 1998
Operation: 2005 Operation: 1995-1998 HRSG supplier: NEM
HRSG supplier: Thermax HRSG supplier: ?? T/G supplier: GE, BHEL
T/G supplier: GE, DDIT T/G supplier: GE, BHEL, MHI, Melco EPC: Development Consultants Private Ltd
EPC: BHEL Quick facts: This project was largely funded by Quick facts: In Nov 1998, NTPC commissioned the
Quick facts: This CCGT plant was commissioned on Japan Bank for International Cooperation. In addition first gas turbine at the Kayamkulam plant at
11 Aug 2005 and uses natural gas from the to building the CCGT plant to use Assam’s natural Choolatheruvu, Alappuzha district. The plant was
Kuttalam gas field in Thanjavur Dist, Tamil Nadu. All gas reserves, funding was made available for a fully commissioned in October 1999, but was little
power generated is sold to Tamil Nadu Electricity substantial associated transmission system. At used initially since its only available fuel was
Board. GEA supplied an air-cooled condenser completion, Kathalguri was able to supply 25% of naphtha. Financial assistance for the Rs1,190cr
electricity demand in the Northwest Region and scheme was obtained from the World Bank. Three
helped to alleviate regional power shortages that had 650-MW CC blocks are in development at
steadily worsened during the 1990s. Kayamkulam, which is also known as Rajiv Gandhi.

Tanirbavi
Location: Karnataka
Operator: GMR Energy
Configuration: 220-MW, 4+1 CCGT power barge with
M6000PC gas turbines
Fuel: naptha
Regency
Operation: 2000 Uran
Location: Tamil Nadu
HRSG supplier: Hyundai Location: Maharashtra
Operator: KSK Energy Ventures
T/G supplier: General Electric, Alstom Operator: Maharashtra State Power Generation Co
Configuration: 59-MW, 1+1 CCGT with 6001 gas
EPC: Hyundai, TCE Ltd
turbine CHP
Quick facts: In Oct 1999, Hyundai won a $160mn Configuration: 4 X 60 MW V93 GT (Unit-1 scrapped
Fuel: gas
contract to build the Tanirbavi barge-based CCGT 2003), 2 X 336-MW, 2+1 CCGT blocks withV94.2
Operation: 2006
plant. Financing closed in September 2000 and in gas turbines
HRSG supplier: ??
Apr 2001 the American ExIm approved $5.1mn in Fuel: natural gas, oil
T/G supplier: BHEL
support for the $207mn project, which at the time, Operation: 1982-1994
EPC: Toyo Engineering
was owned by PSEG Global and GMR in a 49:51 HRSG supplier: Deutsche Babcock
Quick facts: In Feb 2005, BHEL received a Rs84
joint venture. The 106m barge was built in Ulsan and T/G supplier: Siemens
crore equipment contract for this industrial CHP at
moored in the Gurupur River in Mangalore. Metso EPC: Siemens, Lahmeyer, Tata
Kallugurani village in Ramanathpuram Dist.
Automation supplied its maxDNA digital control Quick facts: Uran power station is near Bokadvira
Financial closure was in Aug 2005. Regency Power
system. Simple-cycle operations started in Jun Village, 1km away from Uran town and 55Km from
Corp was set-up to build the plant for a number of
2001 when it was considered the largest single- Mumbai by road. The site is surrounded on three
industrial customers including Regency Ceramics,
barge, generating facility in the world. In Oct 2002, side by the Arabian Sea. Uran cost about Rs
Brakes India, Lakshmi Mills, and Orchid Chemicals.
PSEG sold its stake in Tanirbavi for $45mn. In Jun 1,118.5 Crores. Grid connection is by 4 X 220Kv
KSK was responsible for project implementation,
2008, the original PPA expired and, in Sep 2009, lines to Apta S/S and 2 X 220kV lines to Kharghar
permitting, procurement, and the wheeling
GMR announced it would move the barge power S/S.
arrangement with TNEB. Natural gas is from the
plant to Kakinda in Andhra Pradesh starting in Jan
Cauvery basin.
2010. The 1,200km move and dredging on the
Godavari River upstream from Kakinda cost about
R245cr. Fuel at the new site will be LNG and
operation is expected in April 2010. GMR plans to
retain the 30ac Mangalore site plus associated
infrastructure for possible future use.
Valuthur
Location: Tamil Nadu
Operator: Tamil Nadu Electricity Board
Configuration: 95-MW, 1+1 CCGT with 6001FA gas
turbine, 92-MW, 1+1 CCGT with V643.A gas turbine
Fuel: gas
Operation: 2002-2008
HRSG supplier: Alstom
T/G supplier: BHEL, Siemens/Ansaldo, Alstom
Power India
EPC: Fichtner India, BHEL, Vasavi Power, GEA
India, Dastur & Co
Quick facts: Gas supply is by GAIL from an ONGC
field Ramanathapuram zone. The gas turbine of the
second block went commercial on 18 Jun 2008.