Professional Documents
Culture Documents
Company Profile
Contents
1
About Us
2
ATW Solution
3
Certificates
Regulation Frameworks
2013 2017 2018 2019
PLN Director Regulation National Energy Ministry of Energy and Ministry of Energy and
0733.K/DIR/2013 General Plan Mineral Resources’ Mineral Resources’
(“Peraturan Direktur PLN”) (“Rencana Umum Energi Nasional”) Decree No.49/2018 Decree No.12/2019 and
Any person can install solar panels and Indonesia government targets (“Peraturan Menteri ESDM”) No.13/2019
that excess power will be purchased 6500 MWp of solar PV installations
Solar rooftop installation is explicitly (“Peraturan Menteri ESDM”)
by PLN on a 1-1 ratio. to achieve 23% renewable energy
excluded from Peraturan Menteri
in the energy mix. Operating Permit requirement
ESDM No. 01/2017. Industrial tariff
is still subject to 40 hours parallel threshold is increased to any
Ministry of Energy and operation charge and excess power installation larger than 500 kVA whilst
any installation below will be deemed
Mineral Resources’ net metering is valued by PLN at
to have satisfied regulatory
65% of the customer purchase.
Decree No.01/2017 requirements.
(“Peraturan Menteri ESDM”)
Any PLN customer is allowed to Ministry of Energy and
operate other power generation in Mineral Resources’
parallel whilst Operating Permit
(“Izin Operasi”) is required for Decree No.16/2019
anything larger than 200 kVA. Those (“Peraturan Menteri ESDM”)
who do so will be subject to 40 Parallel operation charge for industrial
hours parallel operation charge. tariff is reduced from 40 hours to
5 hours.
01 *STRICTLY CONFIDENTIAL
About Us
Vision Products
ATW Solar envisions energy independence for
everyone by the power from the sun.
Exponential
Residential
Growth Having done a total installation of more than 3000
Houses including the largest solar housing cluster in
Indonesia (Summarecon) and Asya Astra-Modernland.
20 MWp
Solar PV Projects, only in
3 years
into operation.
Industrial
ATW Solar also specializes in industrial segments
(rooftop, carport, ground-mount) with industrial grade
equipment and international engineering standards.
PT ATW Sejahtera
Trading, Distributorships
Key Advantage
EPC Rental
High Savings No Capex
Proven over-performing results Zero upfront investment
Pro-active after sales service Zero operation and maintenance risk
No inflation in utility price Immediate benefit from day one
Project support,
EPC, O&M
After-sales service,
Spare-parts allocation
EPC, O&M
Project-financing,
Commercial - Lease
Technical Assistance
Industrial
Developments
948.6 MW
This includes joint developments
Completed Projects In 2020, ATW Group and Shizen from a joint venture to
Main Benefit Full saving enjoyed by customer Smaller saving enjoyed by customer (remaining majority
goes to ATW Investasi Hijau)
Saving (Revenue) Fully enjoyed by customer Shared with ATW Investasi Hijau to cover its investment
risk and interest
Ownership Right away after EPC completes After rental contract matures (20-30 years)
Happy Customers
>3 years proven track record in residential, off-grid, and commercial-industrial segments with 15 MWp installation
ATW’s ISO
Nama Sertifikat Nama Peserta Berlaku Sampai Penerbit
REC Authorized Distributorship PT ATW Sejahtera 31/12/2021 REC Solar Pte Ltd
REC Solar Professional Installer PT ATW Solar Indonesia 31/12/2020 REC Solar Pte Ltd
Izin Usaha Jasa Penunjang Tenaga Listrik PT ATW Sejahtera PTSP Kota Jakarta Utara
(IUJPTL)
Sertifikat Badan Usaha Pembangunan dan PT ATW Sejahtera 14/10/2024 Lembaga Sertifikasi Badan Usaha
Pemasangan Instalasi Penyediaan Tenaga PT AK Lima
Listrik
Pembangunan dan Pemasangan PLTS Eduardus Pandik 30/06/2022 Kementerian Energi dan Sumber Daya
Level 5 Mineral RI
Pembangunan dan Pemasangan PLTS Victor Samuel 30/06/2022 Kementerian Energi dan Sumber Daya
Level 4 Mineral RI
Pembangunan dan Pemasangan PLTS Chairiman 30/06/2022 Kementerian Energi dan Sumber Daya
Level 4 Mineral RI
Pembangunan dan Pemasangan PLTS Roynaldo Parlindungan H 30/06/2022 Kementerian Energi dan Sumber Daya
Level 4 Mineral RI
Pembangunan dan Pemasangan PLTS Cholis Indra Masruri 10/04/2022 Kementerian Energi dan Sumber Daya
Level 4 Mineral RI
Pembangunan dan Pemasangan PLTS Adim Ardi Jana 10/04/2022 Kementerian Energi dan Sumber Daya
Level 4 Mineral RI
Pembangunan dan Pemasangan PLTS Ahmad Asyif Yahya 10/04/2022 Kementerian Energi dan Sumber Daya
Level 4 Mineral RI
Pembangunan dan Pemasangan PLTS Irfan Murdiyono 10/04/2022 Kementerian Energi dan Sumber Daya
Level 3 Mineral RI
Pemeliharaan PLTS Erduardus Pandik 30/06/2022 Kementerian Energi dan Sumber Daya
Level 5 Mineral RI
Pemeliharaan PLTS Roynaldo Parlindungan H 30/06/2022 Kementerian Energi dan Sumber Daya
Level 4 Mineral RI
Pemeliharaan PLTS Cholis Indra Masruri 10/04/2022 Kementerian Energi dan Sumber Daya
Level 4 Mineral RI
Pemeliharaan PLTS Adim Ardi Jana 10/04/2022 Kementerian Energi dan Sumber Daya
Level 4 Mineral RI
Pemeliharaan PLTS Ahmad Asyif Yahya 10/04/2022 Kementerian Energi dan Sumber Daya
Level 4 Mineral RI
Pemeliharaan PLTS Irfan Murdiyono 10/04/2022 Kementerian Energi dan Sumber Daya
Level 3 Mineral RI
Pengoperasian PLTS Roynaldo Parlindungan H 24/06/2023 Kementerian Energi dan Sumber Daya
Level 3 Mineral RI
Pengoperasian PLTS Cholis Indra Masruri 24/06/2023 Kementerian Energi dan Sumber Daya
Level 3 Mineral RI
Pengoperasian PLTS Adim Ardi Jana 24/06/2023 Kementerian Energi dan Sumber Daya
Level 3 Mineral RI
Pengoperasian PLTS Irfan Murdiyono 24/06/2023 Kementerian Energi dan Sumber Daya
Level 3 Mineral RI
K3
Nama Sertifikat Nama Peserta Berlaku Sampai Penerbit
Management Team
> 20 yrs experience in banking, manufacturing and mining > 6 yrs experience in financial audit and accounting > 3 years experience in HRGA and legal
industry (Fuji Bank, Mizuho Bank, Toyota Astra, Atlas),
specialised in corporate planning & administration. Experience in managing project (USD 30M/year) Universitas Kristen Satya Wacana, Bsc in Law
University of Indonesia, BA in Administration Science. PPM School of Management, Magister Mgmtct
> 4 yrs exp. in HSE operation > 4 years exp. in solar sales and marketing
Led corporate certification for ISO 9001:2015, OHSAS Closed >20 MWp solar deal
18001:2007, ISO 14001;2015
Washington State University, BSc in Mech. Engineering
University Esa Unggul, BSc in Public Health
Operation Team
Melbourne University, BSc in Civil System Jember State Polytechnic, Professional Bachelor (D4)
Led innovation in frontier product: solar ice-maker,
in Renewable Energy Engineering
solar canopy, centralised monitoring, hybrid system
3 yrs experience in solar engineering and project >5 yrs exp purchasing and procurement 3 yrs experience in solar energy sales & marketing
management
Politeknik Padjajaran Bandung Tanri Abeng University, BA in Entreprenuerial & Small
Jember State Polytechnic, Professional Bachelor (D4) Business Operations
in Renewable Energy Engineering
ATW’s Inverter
ATW Portfolio’s
Largest Solar
Carparking
Canopy
ATW Portfolio’s
SCG Solar
PV Canopy
ATW Portfolio’s
Summarecon
Solar PV
Canopy
1 PT. Kalbio Global Medika PT. Kalbio Global Medika 2018 0.2
4 PT. SCG Lightweight Concrete PT. SCG Lightweight Concrete Indonesia 2018 0.34
Indonesia
8 PT. Akuo Energy Indonesia Solar Desalination, Desa Papagaran, NTT 2019 0.01
12 PT. Astra Modernland Rumah Contoh, Asya Kluster, Jakarta 2019 0.01
Garden City
15 Kawasan Pabrik Deltamas Cikarang PT. Bintang Toedjoe, PT. Sakafarma 2019-2020 4.58
Laboratories, PT. Enseval Putera
Megatrading, Tbk., PT. Global
Chemindo Megatrading, Tbk.
16 PT. Xurya Dana Indonesia Lindeteves Trade Center, Jakarta 2020 0.82
21 PT. Cikarang Listrindo PT. NSK, PT. Komatsu 1 & 2, PT. Ferron 2020 0.81
25 PT. Indo Tenaga Hijau PT. Indo Tenaga Hijau 2021 (On Going) 1,3
TOTAL 20
Jl. Mandar VI Blok DC4 No. 12 Bintaro Jaya - Tangerang Selatan Banten 15225, Indonesia
atw-solar.id
IG: atw_solar
Linkedin: ATW Solar