PT ATW Investasi Hijau: Energy Independence for Everyone

C o m p a n y Profile (March 2022)


Why Solar Energy?

Sustainability

Green

Self-sufficiency

Saving

Smart
About Us

Regulation Frameworks
2017 2018 2019 2021

Ministry of Energy and Ministry of Energy and


National Energy Ministry of Energy and
Mineral Resources’ Mineral Resources’
General Plan Mineral Resources’
Decree No.12/2019 and Decree No.26/2021
(“Rencana Umum Energi Nasional”) Decree No.49/2018
Indonesia government targets 6500 (“Peraturan Menteri ESDM”) No.13/2019 (“Peraturan Menteri ESDM”)
• The regulation applies not only for PLN
M W p of solar PV installations to Solar rooftop installation is explicitly (“Peraturan Menteri ESDM”) customers, but also IUPTLU ones.
achieve 23% renewable energy in the excluded from Peraturan Menteri Operating Permit requirement • Exported electricity compensation is
energy mix. ES D M N o. 01/2017. Industrial tariff is threshold is increased to any increased from 65% to 100%.
still subject to 40 hours parallel installation larger than 500 kVA whilst • Processing time of rooftop solar PV
Ministry of Energy and operation charge and excess power any installation below will be deemed permit proposal is reduced to 5 days
to have satisfied regulatory without electricity buy-sell agreement
Mineral Resources’ net metering is valued by PLN at
requirements. adjustment and 12 days with it.
65% of the customer purchase.
Decree No.01/2017 • Carbon trading from rooftop solar PV
is possible.
(“Peraturan Menteri ESDM”)
Any PLN customer is allowed to Ministry of Energy and • Software-based solar PV program
proposal, report, and supervision.
operate other power generation in Mineral Resources’ • Rooftop solar PV complaint center is
parallel whilst Operating Permit
(“Izin Operasi”) is required for Decree No.16/2019 available.

anything larger than 200 kVA. Those (“Peraturan Menteri ESDM”)


who do so will be subject to 40 Parallel operation charge for industrial
hours parallel operation charge. tariff is reduced from 40 hours to 5
hours.

04
+50 ATW Group also specializes in
industrial segments (rooftop, carport,

plants ground-mount) with industrial grade


equipment and international
engineering standards.

+3000 Having done a total installation


of more than 3000 Houses including

houses the largest solar housing cluster in


Indonesia (Summarecon) and Asya
Astra-Modernland.

+40 ATW Group currently has portfolio

MWp of 30 MWp solar PV projects, only


in 4 years into operation.
Vision
ATW Group envisions energy independence
for everyone by the power from the sun.

Exponential
Growth 30+ MWp
Solar PV Projects
only in 4 years into operation.
ATW Group: An Integrated Solar Energy Company
Catching the sunny opportunity

PT ATW Sejahtera Procures and distributes world’s


best solar equipment at the best
Trading,
price
distributorships

PT ATW Solar Indonesia


PT ATW Investasi Hijau
Engineering,
Rental / Lease
construction, R&D

Engineers & constructs solar PV system aiming Operating leases solar equipment with long
maximum yield and long-term reliability term period to provide saving for companies
without CAPEX
Innovates solar PV products for catering unique
needs in society
ALL RIGHTS RESERVED.
ATW Products

On-Grid Solar PV System

A L L RIGHTS R E S E R V E D 08
ATW Solution

Rental Solar PV Benefits for Customers

No upfront cost


No risk
No maintenance cost
Direct saving
Emission reduction
Green brand
Higher valuation
Easier access for
future financing
Achievements

R&D Achievements

Solar PV Canopy Monitoring System Solar Ice Maker


Largest industrial solar canopy Self-developed monitoring system Indonesia first off-grid solar ice maker for
remote fisherman
Generating electricity from parking lot, Customized user interface design
carport, terrace Automated technology with dynamic
M onitor PV Generation and electricity operation: ice generation synchronous to
W aterproof design consumption on hourly,daily, monthly, sunshine
yearly bases

Icemaking capacity 1.2 tonnes/day


Outdoor system monitoring display

A L L RIGHTS R E S E R V E D 26
Achievements

ATW IT Development and Automation System

ATW proprietary monitoring and


control system for C&I and
residential sector.

ATW internal software for


Online residential portal calculator integrating C&I solar simulation
for instant quotation sales managing software and ATW full
for certified 3rd party reseller. customized proposal.
Integration with banking sector for
sales and collection.

27 A L L RIGHTS R E S E R V E D
Achievements

R&D Roadmap

What we can do
Building integrated PV System
Energy Storage
EV Charger
Towards Future Grid
Internet of Things Community Storage and
Generation/Microgrid
Virtual Power Plant
Wholesale electric market

Making it smarter
Internet of Everything
Smart Home/Building System
Energy Management System

A L L RIGHTS R E S E R V E D 28
ATW’s Portfolio

Happy Customers
>4 years proven track record in residential, off-grid, and commercial-industrial segments with >30 M W p installation

29 A L L RIGHTS R E S E R V E D
ATW Portfolio

ATW Portfolio
Largest
Pharmaceutical
Factory with
Solar Energy

A L L RIGHTS R E S E R V E D 32
ATW Portfolio

ATW Portfolio
MW Scale
Ground-
Mounted
Solar
Energy in
East Java

A L L RIGHTS R E S E R V E D 33
ATW Portfolio

ATW Portfolio
Largest Solar
Carparking
Canopy in
Indonesia

A L L RIGHTS R E S E R V E D 34
ATW Portfolio

ATW Portfolio
Bio-
pharmaceutical
Solar Powered
Facility

A L L RIGHTS R E S E R V E D 35
ATW Portfolio

ATW Portfolio
SCG -
Lightweight
Brick
Manufacturer

36 A L L RIGHTS R E S E R V E D
ATW’s Portfolio
No Nama Pelanggan Waktu Penyelesaian Kapasitas (kWp)

1 Projects before 2021 2017-2020 5.18

2 PT Kahatex April-21 0.16

3 Universitas Negeri Semarang April-21 0.13


August-21
4 PT Indo Tenaga Hijau 1.50

5 PT Xurya Daya Indonesia August-21 0.84

6 PT. Cikarang Listrindo - PT. Ferron June-21 0.24

7 PT Sumber Graha Sejahtera (Sampoerna Kayoe Tanon) September-21 1.20

PT Sumber Graha Sejahtera (Sampoerna September-21


8 0.54
Kayoe Pundong)

9
September-21
PT. Bintang Toedjoe Deltamas Phase 2 1.20

September-21
10 PT. Bintang Toedjoe Pulogadung 0.60

11 PT Riau Prima Energi


October-21 1.35

PT. Sumber Alfaria Trijaya


August-21 0.20
12

13 PT Agung Automall December-21 0.80

14 PT. Cikarang Listrindo - PT Denso Indonesia August-21 0.40

A L L RIGHTS R E S E R V E D
No Nama Pelanggan Waktu Penyelesaian Kapasitas (kWp)

15 PT. Cikarang Listrindo - PT Mane Indonesia November-21 0.35

16 PT. Cikarang Listrindo - PT NSK December-21 0.15

February-22
17 PT. Cikarang Listrindo - PT Indofood 1.00

January-22
18 PT. Cikarang Listrindo - PT Asahi Denso 0.36

PT. Cikarang Listrindo - PT Denso


19 April-22 1.00
Manufacturing
April-22
20 Maven - PT Sanghiang Perkasa 1.60

PT Tanjung Kreasi Parquet Indonesia -


21 April-22 2.00
DSN Group

22 PT. Cikarang Listrindo - PT Komatsu March-21 0.33


June-22
23 PT. Steel Pipe Industry of Indonesia, Tbk 0.97

June-22
24 PT Eco Paper Tbk 3.40
June-22
25 Bekasi Power - APL 0.81
June-22
26 Bekasi Power - BP 0.22
April-22
27 PT. Cikarang Listrindo - PT NSK Phase 2 0.86
January-22
28 PT Indesso Aroma 0.15

BECIS - Danone AQUA April-22 0.13


29
A L L RIGHTS R E S E R V E D
ATW’s Portfolio
No Nama Pelanggan Waktu Penyelesaian Kapasitas (MWp)
June-22
30 Xurya - PT Aneka Jaya 0.20
December-22
31 PT Riau Prima Energy (April Group) 12.75
July-22
32 BECIS - PT Multispunindo Jaya 3.90

PT Cikarang Listrindo - PT Puratos July-22 0.15


33
PT Cikarang Listrindo - PT Denso
34 July-22 0.50
Indonesia (Bekasi Plant)
PT Toyota Motor Manufacturing
35 July-22 0.15
Indonesia
December-22
36 PT Kencana Energy Tbk 1.40

37 PT Cikarang Listrindo - PT Astra Honda Motor August-22 0.29


August-22
38 SOHO Padang Parit Global 0.50
August-22
39 PT SOHO Industri Pharmasi 0.63

TOTAL 48.15

A L L RIGHTS R E S E R V E D
Thank you
Contact Us
victor@atwhijau.id
+62 811-992-778
PT ATW Investasi Hijau
atwhijau.id
Energy Independence for Everyone Jalan Duren Tiga Selatan No.8, Pancoran,
Jakarta Selatan, 12760, Indonesia