Quotation No – New Policy 2023/05

Date:

Engineering, Procurement & Development (EPC) Proposal for Solar Ground Mount PV Plant

Client Name – M/S KRISHI RASAYAN EXPORTS PRIVATE LIMITED

Address - PLOT NO. 19/1, PHASE-IV, GIDC PANOLI, TA. ANKLESHWAR, DIST.BHARUCH-394116

Proposed Capacity – 1000 KW AC /1250 KW DC

Contact Email /Number – chirag.patel@krepl.in (Mobile no -9512009190)

206 S. B. Centre beside apple hospital, Udhana Darwaja -395002


Email – sunsnatch.commercial@gmail.com / Monark.sunsnatch@gmail.com
GSTIN Number: 24ACLFS0537R1ZK
Contact – Name (mobile No)
Quotation No – New Policy 2023/05
Company Overview

Sunsnatch Solutions LLP was founded in 2013 with the goal of becoming a pioneer among renewable energy system
developers thanks to the aptitude and strength of its skilled personnel. With its headquarters in Surat Gujarat, the
organization specializes in a broad range of services in Energy, Infrastructure, Engineering and Project Management
domain across India as well as overseas, with a focus on the commercial and industrial sectors. The team of
sunsnatch consists of esteemed professionals and associates from well-diversified backgrounds to provide the right
set of comprehensive, smart solutions

The company’s services include - delivery of end-to-end turnkey projects in the areas of solar EPC, Solar Water
heater & Street Light. We at Sunsnatch support the planning, sales, operation and maintenance of renewable
energy systems. Our dedicated and skilled team of experts strive to offer a perfect balance of cost and quality while
delivering the projects within the required timescale that meets the client’s requirements.

 In Solar EPC space, Sunsnatch has commissioned more than 4000+ projects in 3 states with a cumulative
capacity of 75 MWs in Rooftop (Residential +industrial) and 410+ MWs of Ground Mounted Projects.
 GEDA, MNRE Channel Partner, ISO 9001:2015 Certified.

Sunsnatch has displayed an exceptional growth rate ever since its inception with utility MW scale projects for Govt.
institutes, Manufacturing companies, private firms etc.

Leveraging on the rich experience and expertise of over 10 years of the advisory board and team members in their
respective areas, the company has been able to establish itself as a trusted brand among its extensive client base
and continue to move forward in contributing to a sustainable and greener tomorrow.
Quotation No – New Policy 2023/05
Our Valuable Clients

Brand Partners

“More than 4000+ (Residential & Industrial) trusted Company “


Quotation No – New Policy 2023/05
Project Summary -
Sunsnatch Solar hereby submits the detailed proposal outlining the EPC program from concept to commissioning of
the Solar PV plant and following is the summary of our proposal:

Company Name M/S KRISHI RASAYAN EXPORTS


PRIVATE LIMITED
Light bill Month Oct-23
Consumed Unit 645968
Required Solar 5383.1
Proposed Capacity 1000 KW AC / 1250 KW DC
Note –As per Gujarat Government Solar Policy 2023 you will Installed 1 MW in solar Rooftop

Total Project Cost (GST Exclusive) summary as follows

Plant Size (KWp) = 1250 kWp

Project Cost
Description Basic Cost (INR/Wp)
(Exclusive of GST)

Design, Engineering, Procurement


28.8 3,60,00,000
&Commissioning Solar Project

GST 13.8% Extra

GEDA fess, Meter & Connectivity


Government Charges Extra As actual
Charged

Sprinkler System (Optional) Cleaning System Extra As actual

Project Include – Mono Bifacial Trina 665 wp module (World largest module & highest efficiency module) +
Solar on grid inverter Sun grow /Solis/Growatt + Polycab Wire +UPVC Astral Conduit Pipe +Plant safety Railing +
Walkway +Module mounting structure +Lighting arrestor & Standard BOS
Quotation No – New Policy 2023/05

Timeline – Sunsnatch Solar shall submit a detailed project schedule of the EPC startup outline the activities
encompassing the material supplies, construction, and installation-commissioning. The expected schedule shall not
exceed 06 months from date of land handover for execution considering advance payment milestone and contract
signing is completed.

Payment Terms -
 20% Advance Against Po

 65 % Against Module BL/PO/Dispatch LR

 10% Against 80% Project cost on complete installation completion

 5% against Plant handover

Guarantees and Warranties


 PV Modules - Solar modules used in solar power plants/ systems are warranted for their
degeneration rate in rating/ output peak watt capacity of up to 2.00% in the first year and at the
reduced rates of 0.55% p.a. in the subsequent years. It is further warranted that output peak
watt capacity of solar modules shall not be less than 92.00% (approx.) at the end of 10 years and
84.80% at the end of 25 years (Mono).

 Inverters - Inverters are warranted against any manufacturing/ design/ installation defects for a
period of 5 years +5 Year extendable

 Mechanical Structures, Other Electrical Works and Balance of Plant –Mechanical


structures, electrical/ electronic items, balance of plant and overall workmanship of the SPV
power plants/ systems are warranted against any manufacturing/ design/ installation defects for
a period of 2 years.

 Service period – 5 Year from complete installation

 Manufacturers’ Warranties/ Guarantee -Sunsnatch solar shall be primarily responsible to for


observance and compliance of the above guarantees and warranties. Sunsnatch solar shall
arrange to pass on to the aforesaid guarantees/ warranties from the manufacturers/ suppliers of
respective components of solar plants/ systems. Sunsnatch solar shall facilitate and try their
level best without sparing any efforts for the enforcement of guarantees/ warranties on
manufacturers/suppliers of the components, in case if there is any guarantee/ warranty claim.
Sunsnatch solar Workmanship warranty will be 24 months from Commencement Operation
Date.
Quotation No – New Policy 2023/05

Light bill Calculations

Consumer No 40756
Reference Light bill OCT 2023
Contract Demand 1300 KVA
Total Unit consumed 645968 Unit /Month
Total Light bill 5378490.55 INR
Total Demand Charges 350830 INR

Charges UNITS Amount Per unit charges


Energy Charges 645968 2713065.6 4.2
Fuel charge 645968 2163992.8 3.35
TOU 215829 183454.65 0.85

Night Rebate 219542 94403.06 -0.43


PF Rebate 2713065.6 58330.91 -0.0215
Total light bill 5258609.08
Electricity Duty 119881.47 0.19
Demand /Fixed
charge impact on per unit 0.54
Per Unit Rate 8.68

After Solar installation


Applicable Unit rate 8.68 Existing Unit rate
Fixed Charges -0.54 Not change after solar installation
Night Rebate -0.43 Not change after solar installation
PF Rebate -0.021 Not change after solar installation
This charge applicable on total light bill. Huge saving
ED -0.19 after solar installation but at that time will be consider
for worst condition
As per policy 2023 Banking charges 8 % applicable on
Banking charges -1.10 total units. But decision pending in GERC. Banking charge
consider as per previous rule

Net saving Rs /Unit 6.40 Net benefit on unit rate


Quotation No – New Policy 2023/05

ROI calculation, 3D Design Attached separately

Thank You