You are on page 1of 6

Calculo de presiones de vivienda unifamiliar

Ubicación: calle mayta capac # 212 –Talarita-Castilla-Piura


Ancho de vía: 6.60 m.
PM: 32 m
PS: 3.5 m
Htm: 2 m
HT: 7.55 m
Hdf: 20.95 m
La vivienda cuenta con:
2 duchas = 1.5 3
2 inodoros = 3 6
2 lavatorios = 0.75 1.5
3 lavaderos = 2 6
16.5 und.
Q: 0.47
Tramo A-B
0.00047 = 0.2788 (140) (0.0254)2.63 (S)0.54
S = 0.0456
Hf = 0.0456 (4.83+1.495) = 0.288
V = 0.92
PB = 32 - 0.288 – 2 = 29.71m
Tramo B-C
0.00047 = 0.2788(140) (0.0254)2.63 (S)0.54
S = 0.0456
Hf = 0.0456 (9.4+12.87) = 1.01 m
V = 0.92
PC = 29.71 - 1.01 – 0 = 28.69 m

Tramo C-D
0.00012 = 0.2788(140) (0.0254)2.63 (S)0.54
S = 0.0036
Hf = 0.0036 (3.19+18.84) = 0.080 m
V = 0.23
PD = 28.69 – 0.080 – 1.2 = 27.415 m

Tramo C-E
0.000235 = 0.2788(140) (0.0254)2.63 (S)0.54
S = 0.0126
Hf = 0.0126 (5.26+32.29) = 0.475 m
V = 0.46
PE = 27.415 – 0.475 – 1.2 = 25.74 m
Tramo C-F
0.00016 = 0.2788(140) (0.0254)2.63 (S)0.54
S = 0.0062
Hf = 0.0062 (14.86+24.827) = 0.246 m
V = 0.31
PF = 25.74 – 0.246 – 0.6 = 24.894 m
TRAMO P HT Q D C S Hf V L Le N° T-C VG
PM 32 0 0
A-B 29.7114511 2 0.00047 0.0254 140 0.04562399 0.28854894 0.92755469 4.83 1.4945 1 0
B-C 28.6953591 0 0.00047 0.0254 140 0.04562399 1.01609195 0.92755469 9.4 12.871 3 1
C-D 27.415119 1.2 0.00012 0.0254 140 0.00364082 0.0802401 0.23682248 3.19 18.849 7 1
C-E 25.7403852 1.2 0.000235 0.0254 140 0.01263951 0.47473379 0.46377735 5.26 32.2995 16 1
C-F 24.8942261 0.6 0.00016 0.0254 140 0.00620251 0.24615909 0.3157633 14.86 24.827 11 1

PM PS HT Hdf T-C ´/und M/und


32 3.5 7.55 20.95 1 4.9 1.4945
VG
1 27.5 8.3875
TRAMO P HT Q D C S Hf V L Le N° T-C VG
PM 32 0 0
A-B 28.8511641 2 0.00047 0.01905 140 0.18522142 1.14883587 1.64898612 4.83 1.3725 1 0
B-C 25.105987 0 0.00047 0.01905 140 0.18522142 3.74517715 1.64898612 9.4 10.82 3 1
C-D 23.6177506 1.2 0.00012 0.01905 140 0.01478078 0.28823639 0.42101773 3.19 16.31075 7 1
C-E 20.6766971 1.2 0.000235 0.01905 140 0.0513131 1.74105351 0.82449306 5.26 28.67 16 1
C-F 19.1533886 0.6 0.00016 0.01905 140 0.02518057 0.92330847 0.56135698 14.86 21.8075 11 1

PM PS HT Hdf T-C ´/und M/und


32 3.5 7.55 20.95 1 4.5 1.3725
VG
1 22 6.71
TRAMO P HT Q D C S Hf V L Le N° T-C VG
PM 32 0 0
A-B 20.8022799 2 0.00047 0.0123 140 1.55959646 9.19772011 3.95545764 4.83 1.0675 1 0
B-C -7.17688057 0 0.00047 0.0123 140 1.55959646 27.9791605 3.95545764 9.4 8.54 3 1
C-D -10.3681888 1.2 0.00012 0.0123 140 0.12445677 1.99130827 1.00990408 3.19 12.81 7 1
C-E -23.5266733 1.2 0.000235 0.0123 140 0.4320652 11.9584845 1.97772882 5.26 22.4175 16 1
C-F -30.8987436 0.6 0.00016 0.0123 140 0.21202474 6.77207029 1.34653877 14.86 17.08 11 1

PM PS HT Hdf T-C ´/und M/und


32 3.5 7.55 20.95 1 3.5 1.0675
VG
1 17.5 5.3375