PAKAGE ROUTE. ROUTE NAME FLAT (m2) KERB (m) BERM
NO
S E U S KM 0.05 0.06 0.07 CMP
D203 Jalan Bandar Baru Jeli 0.00 3.82 3.82 3.82 57,600.00 2,880.00 8,520.00 511.20 960 67.20
D204 Jalan Lama Bandar Jeli (dari Simpang KM 97.25) 0.00 3.12 3.12 3.12 26,000.00 1,300.00 141.80 8.51 -
D205 Jalan ke Kuarters Kerajaan 0.00 1.20 1.20 1.20 9,600.00 480.00 - -
J1 Jalan Kg.Rahmat - Air Lanas 0.00 0.59 0.00 0.59 0.59 5,600.00 280.00 - -
Jalan Kg.Lakota - Masjid Lakota 0.00 0.80 0.00 0.80 0.80 6,400.00 320.00 72.00 4.32 -
Jalan Gemang - Jalan Air Kulim 0.00 0.76 0.00 0.76 0.76 13,600.00 680.00 62.00 3.72 -
Jalan Air Kulim - Lakota 0.00 0.60 0.00 0.60 0.60 6,400.00 320.00 54.60 3.28 -
J1 SUB TOTAL 10.89 8.14 2.75 10.89 125,200.00 RM6,260.00 8,850.40 RM531.03 960.00 RM67.20 -
D207 Jalan Kuala Long - Kg.Sg. Rual (km0.00 - km10.00) 0.00 10.00 10.00 10.00 120,000.00 6,000.00 - -
J2
D208 Jalan Batu Melintang Luar - Kg.Sg.Luar 0.00 5.00 5.00 5.00 55,000.00 2,750.00 - - -
Jalan Kalai Baru - Jambatan Sg.Tadoh 0.00 1.50 1.50 1.50 6,000.00 300.00 - - -
J3 D206 Jalan ke Kem 302 Bt. Melintang 0.00 3.10 3.10 3.10 21,700.00 1,085.00 54.00 3.24 1080 75.60
RO3
Conversi
Maintenance
KM on RM RM RM
Length (km) Length
PAKAGE ROUTE. ROUTE NAME FLAT (m2) KERB (m) BERM
NO
J3 S E U S KM 0.05 0.06 0.07 CMP
Jalan Kalai Baru - Post Sempadan 0.00 5.60 5.60 5.60 86,000.00 4,300.00 174.00 10.44 14000 980.00
J3 SUB TOTAL 10.20 10.20 - 10.20 113,700.00 RM5,685.00 228.00 RM13.68 15,080.00 RM1,055.60 -
Jalan Kg.Jerimbong Ke FT 066 (I) 0.00 1.24 1.24 1.24 15,000.00 750.00 - - 2664 186.48
J4 Jalan Kg.Jerimbong Ke FT 066 (II) 0.00 3.11 3.11 3.11 45,650.00 2,282.50 11030 772.10
Jalan Kg.Baru Kuala Balah 0.00 4.02 4.02 4.02 41,100.00 2,055.00 - -
J4 SUB TOTAL 8.37 8.37 - 8.37 101,750.00 RM5,087.50 - RM0.00 13,694.00 RM958.58 -
RCP BC TOTAL 100.00 CMP RCP BC TOTAL 130.00 CMP RCP BC TOTAL 160.00 2.00 1.00
1 1.00 100.00 - - 3.00 3.00 480.00 170.00 340.00 3,670.00 3,670.00 1,620.00
- - 2.00 2.00 260.00 3.00 3.00 480.00 10.00 20.00 1,060.00 1,060.00 100.00
1.00 - 1.00 RM100.00 - 2.00 - 2.00 RM260.00 2.00 19.00 3.00 24.00 RM3,840.00 410.00 RM820.00 12,813.00 RM12,813.00 2,160.00
1 1.00 100.00 4.00 4.00 520.00 40.00 40.00 6,400.00 30.00 60.00 10,656.00 10,656.00 95.00
1.00 - 1.00 RM100.00 bn 4.00 - 4.00 RM520.00 7.00 40.00 - 47.00 RM7,520.00 120.00 RM240.00 16,426.00 RM16,426.00 227.00
3 3.00 300.00 3.00 3.00 390.00 - - 80.00 160.00 1,326.00 1,326.00 37.00
- - 10.00 10.00 1,300.00 1.00 1.00 160.00 70.00 140.00 3,005.00 3,005.00
RO5 (NOS) RO5 (M)
RCP BC TOTAL 100.00 CMP RCP BC TOTAL 130.00 CMP RCP BC TOTAL 160.00 2.00 1.00
- - 2.00 2.00 260.00 16.00 16.00 2,560.00 33.00 66.00 11,730.00 11,730.00
3.00 - 3.00 RM300.00 - 15.00 - 15.00 RM1,950.00 - 17.00 - 17.00 RM2,720.00 183.00 RM366.00 16,061.00 RM16,061.00 37.00
- - - RM0.00 - 6.00 - 6.00 RM780.00 - 16.00 - 16.00 RM2,560.00 220.00 RM440.00 10,786.00 RM10,786.00 871.00
Di Luluskan Oleh
Pengurus Seksyen
1.2 3 1.3 2 2 4
SUB TOTAL
RO7 (M) SUB TOTAL (RO5&RO7) TOTAL / MONTH
(RO3)
RM RM RM (Intercepto RM RM
Monsoon BERM 1st r Drain) Cascade RM RM / 4 (3 CYCLE) RM
Drain & 2nd BERM 1st Drain
& 2nd
1.20 3.00 1.30 2.00 2.00
RM2,592.00 - RM0.00 1,620.00 RM2,106.00 - RM0.00 162.00 RM324.00 6,858.23 22,531.00 5,632.75 12,490.98
RM RM RM (Intercepto RM RM
Monsoon BERM 1st r Drain) Cascade RM RM / 4 (3 CYCLE) RM
Drain & 2nd BERM 1st Drain
& 2nd
1.20 3.00 1.30 2.00 2.00
RM44.40 - RM0.00 7,540.00 RM9,802.00 - RM0.00 65.00 RM130.00 6,754.28 31,243.40 7,810.85 14,565.13
RM1,045.20 - RM0.00 6,896.00 RM8,964.80 - RM0.00 365.00 RM730.00 6,046.08 24,576.00 6,144.00 12,190.08