0.05 0.06 0.

07

RO3

Conversi
Maintenance
KM on RM RM RM
Length (km) Length
PAKAGE ROUTE. ROUTE NAME FLAT (m2) KERB (m) BERM
NO
S E U S KM 0.05 0.06 0.07 CMP

D203 Jalan Bandar Baru Jeli 0.00 3.82 3.82 3.82 57,600.00 2,880.00 8,520.00 511.20 960 67.20

D204 Jalan Lama Bandar Jeli (dari Simpang KM 97.25) 0.00 3.12 3.12 3.12 26,000.00 1,300.00 141.80 8.51 -

D205 Jalan ke Kuarters Kerajaan 0.00 1.20 1.20 1.20 9,600.00 480.00 - -

J1 Jalan Kg.Rahmat - Air Lanas 0.00 0.59 0.00 0.59 0.59 5,600.00 280.00 - -

Jalan Kg.Lakota - Masjid Lakota 0.00 0.80 0.00 0.80 0.80 6,400.00 320.00 72.00 4.32 -

Jalan Gemang - Jalan Air Kulim 0.00 0.76 0.00 0.76 0.76 13,600.00 680.00 62.00 3.72 -

Jalan Air Kulim - Lakota 0.00 0.60 0.00 0.60 0.60 6,400.00 320.00 54.60 3.28 -

J1 SUB TOTAL 10.89 8.14 2.75 10.89 125,200.00 RM6,260.00 8,850.40 RM531.03 960.00 RM67.20 -

D207 Jalan Kuala Long - Kg.Sg. Rual (km0.00 - km10.00) 0.00 10.00 10.00 10.00 120,000.00 6,000.00 - -
J2
D208 Jalan Batu Melintang Luar - Kg.Sg.Luar 0.00 5.00 5.00 5.00 55,000.00 2,750.00 - - -

J2 SUB TOTAL 15.00 15.00 - 15.00 175,000.00 RM8,750.00 RM0.00 - RM0.00 -

Jalan Kalai Baru - Jambatan Sg.Tadoh 0.00 1.50 1.50 1.50 6,000.00 300.00 - - -

J3 D206 Jalan ke Kem 302 Bt. Melintang 0.00 3.10 3.10 3.10 21,700.00 1,085.00 54.00 3.24 1080 75.60
RO3

Conversi
Maintenance
KM on RM RM RM
Length (km) Length
PAKAGE ROUTE. ROUTE NAME FLAT (m2) KERB (m) BERM
NO
J3 S E U S KM 0.05 0.06 0.07 CMP

Jalan Kalai Baru - Post Sempadan 0.00 5.60 5.60 5.60 86,000.00 4,300.00 174.00 10.44 14000 980.00

J3 SUB TOTAL 10.20 10.20 - 10.20 113,700.00 RM5,685.00 228.00 RM13.68 15,080.00 RM1,055.60 -

Jalan Kg.Jerimbong Ke FT 066 (I) 0.00 1.24 1.24 1.24 15,000.00 750.00 - - 2664 186.48

J4 Jalan Kg.Jerimbong Ke FT 066 (II) 0.00 3.11 3.11 3.11 45,650.00 2,282.50 11030 772.10

Jalan Kg.Baru Kuala Balah 0.00 4.02 4.02 4.02 41,100.00 2,055.00 - -

J4 SUB TOTAL 8.37 8.37 - 8.37 101,750.00 RM5,087.50 - RM0.00 13,694.00 RM958.58 -

Di Sediakan Oleh Di Semak Oleh

Pembantu Penyelia tapak Penyelia tapak


100 130 160 2 1

RO5 (NOS) RO5 (M)

< 600 RM 601 - 900 RM > 900 RM RM RM


BRIDGE LINED UNLINED

RCP BC TOTAL 100.00 CMP RCP BC TOTAL 130.00 CMP RCP BC TOTAL 160.00 2.00 1.00

1 1.00 100.00 - - 3.00 3.00 480.00 170.00 340.00 3,670.00 3,670.00 1,620.00

- - - - 8.00 8.00 1,280.00 190.00 380.00 4,650.00 4,650.00 -

- - - - 2 2.00 320.00 - 1,800.00 1,800.00 -

- - - - - - 40.00 80.00 880.00 880.00 -

- - - - 3.00 1.00 4.00 640.00 - 200.00 200.00 170.00

- - 2.00 2.00 260.00 3.00 3.00 480.00 10.00 20.00 1,060.00 1,060.00 100.00

- - - - 2.00 2.00 4.00 640.00 - 553.00 553.00 270.00

1.00 - 1.00 RM100.00 - 2.00 - 2.00 RM260.00 2.00 19.00 3.00 24.00 RM3,840.00 410.00 RM820.00 12,813.00 RM12,813.00 2,160.00

1 1.00 100.00 4.00 4.00 520.00 40.00 40.00 6,400.00 30.00 60.00 10,656.00 10,656.00 95.00

- - - - 7 7.00 1,120.00 90.00 180.00 5,770.00 5,770.00 132.00

1.00 - 1.00 RM100.00 bn 4.00 - 4.00 RM520.00 7.00 40.00 - 47.00 RM7,520.00 120.00 RM240.00 16,426.00 RM16,426.00 227.00

3 3.00 300.00 3.00 3.00 390.00 - - 80.00 160.00 1,326.00 1,326.00 37.00

- - 10.00 10.00 1,300.00 1.00 1.00 160.00 70.00 140.00 3,005.00 3,005.00
RO5 (NOS) RO5 (M)

< 600 RM 601 - 900 RM > 900 RM RM RM


BRIDGE LINED UNLINED

RCP BC TOTAL 100.00 CMP RCP BC TOTAL 130.00 CMP RCP BC TOTAL 160.00 2.00 1.00

- - 2.00 2.00 260.00 16.00 16.00 2,560.00 33.00 66.00 11,730.00 11,730.00

3.00 - 3.00 RM300.00 - 15.00 - 15.00 RM1,950.00 - 17.00 - 17.00 RM2,720.00 183.00 RM366.00 16,061.00 RM16,061.00 37.00

- - - - - - 1.00 1.00 160.00 153.00 306.00 1,990.00 1,990.00 25.00

- - - - - 9 9.00 1,440.00 67.00 134.00 5,476.00 5,476.00 -

- - 6 6.00 780.00 6 6.00 960.00 - - 3,320.00 3,320.00 846.00

- - - RM0.00 - 6.00 - 6.00 RM780.00 - 16.00 - 16.00 RM2,560.00 220.00 RM440.00 10,786.00 RM10,786.00 871.00

Di Luluskan Oleh

Pengurus Seksyen
1.2 3 1.3 2 2 4
SUB TOTAL
RO7 (M) SUB TOTAL (RO5&RO7) TOTAL / MONTH
(RO3)

RM RM RM (Intercepto RM RM
Monsoon BERM 1st r Drain) Cascade RM RM / 4 (3 CYCLE) RM
Drain & 2nd BERM 1st Drain
& 2nd
1.20 3.00 1.30 2.00 2.00

1,944.00 - 1620 2,106.00 - 162 324.00 3,458.40 8,640.00 2,160.00 5,618.40

- - - - - 1,308.51 6,310.00 1,577.50 2,886.01

- - - - - 480.00 2,120.00 530.00 1,010.00

- - - - - 280.00 960.00 240.00 520.00

204.00 - - - - 324.32 1,044.00 261.00 585.32

120.00 - - - - 683.72 1,940.00 485.00 1,168.72

324.00 - - - - 323.28 1,517.00 379.25 702.53

RM2,592.00 - RM0.00 1,620.00 RM2,106.00 - RM0.00 162.00 RM324.00 6,858.23 22,531.00 5,632.75 12,490.98

114.00 - - - - 6,000.00 17,850.00 4,462.50 10,462.50

158.40 - - - - 2,750.00 7,228.40 1,807.10 4,557.10

RM272.40 - RM0.00 - RM0.00 - RM0.00 - RM0.00 8,750.00 25,078.40 6,269.60 15,019.60

44.40 - - - - 300.00 2,220.40 555.10 855.10

- - 540 702.00 - 16 32.00 1,163.84 5,307.00 1,326.75 2,490.59


SUB TOTAL
RO7 (M) SUB TOTAL (RO5&RO7) TOTAL / MONTH
(RO3)

RM RM RM (Intercepto RM RM
Monsoon BERM 1st r Drain) Cascade RM RM / 4 (3 CYCLE) RM
Drain & 2nd BERM 1st Drain
& 2nd
1.20 3.00 1.30 2.00 2.00

- - 7000 9,100.00 - 49 98.00 5,290.44 23,716.00 5,929.00 11,219.44

RM44.40 - RM0.00 7,540.00 RM9,802.00 - RM0.00 65.00 RM130.00 6,754.28 31,243.40 7,810.85 14,565.13

30.00 - 1381 1,795.30 - 50 100.00 936.48 4,281.30 1,070.33 2,006.81

- - 5515 7,169.50 - 315 630.00 3,054.60 14,219.50 3,554.88 6,609.48

1,015.20 - - - - 2,055.00 6,075.20 1,518.80 3,573.80

RM1,045.20 - RM0.00 6,896.00 RM8,964.80 - RM0.00 365.00 RM730.00 6,046.08 24,576.00 6,144.00 12,190.08

Di Terima Oleh