Petrovietnam’s Objectives
0.8 140%
to n e s / y e a r
0.7 120%
0.3
0.6
100%
0.5 BioDiesel B100
80%
0.4
BioEthanol
60%
0.3 0.1
0.5 40% Petrovietnam/Vietnam
MM
0.2
0.1 0.25 20%
0.0 0
0.0075 0%
2010 2015 2025
Petrovietnam’s Plan
Production
&
Blending
Feedstock
Securing
R&D
Transportation
&
Distribution
In operation
Plant
Southern Biodiesel
Plant : 100 ML/year
Project Under
BinhPhuoc Construction
LongSon Refinery
(10 MM TPA), 2015 Investment
Preparation
Condensate Plant Project
(270,000 TPA), 2004
Conclusions
Petrovietnam’s objectives.
The Intellectual Flame of Petrovietnam Page 21