This document provides a recapitulation calculation of the domestic component level (TKDN) for a project. It shows the domestic (DN) and foreign (LN) values and percentages for materials, equipment, general services, and total costs. The total project cost was Rp. 478,755,000 with a TKDN of 100% for materials, equipment, and overall.
This document provides a recapitulation calculation of the domestic component level (TKDN) for a project. It shows the domestic (DN) and foreign (LN) values and percentages for materials, equipment, general services, and total costs. The total project cost was Rp. 478,755,000 with a TKDN of 100% for materials, equipment, and overall.
This document provides a recapitulation calculation of the domestic component level (TKDN) for a project. It shows the domestic (DN) and foreign (LN) values and percentages for materials, equipment, general services, and total costs. The total project cost was Rp. 478,755,000 with a TKDN of 100% for materials, equipment, and overall.
FORMULIR REKAPITULASI PERHITUNGAN TINGKAT KOMPONEN DALAM NEGERI (TKDN)
Nilai Gabungan Barang/Jasa (Rp) TKDN
Uraian Pekerjaan Total Barang/ DN LN Ribu Rp % KDN Jasa Gabungan 1 2 3 4 5 6 7 BARANG I. Material Langsung (Bahan baku) 416,516,850 71,813,250 416,516,850 87% 87% 87% II. Peralatan (Barang jadi) 0 0 0 0% 0% 0% A. Sub Total Barang 416,516,850 71,813,250 416,516,850 87% 87% 87% JASA III. Jasa Umum 62,238,150 0 62,238,150 13% 13% 13% B. Sub Total Jasa 62,238,150 0 62,238,150 0% 0% 0%
C. TOTAL Biaya (A + B) 478,755,000 71,813,250 478,755,000 100% 100% 100%