Equipment for the start and run-out phase of the TBM

Hofmühlenstraße 5 – 15, 01187 Dresden, Germany

Telephone: 0049 (3 51) 42 34 – 0 Fax: 0049 (3 51) 42 34 - 103


E-Mail: info@msd-dresden.de Web: www.msd-dresden.de
1. Start phase
Start phase consist of:

1.1. Concrete shuttering pipe 1.3. Shield cradle 1.5. References


1.2. Starting seal 1.4. Compensation ring with abutment steel construction
1. Start phase
1.1. Concrete shuttering pipe
1.2. Starting seal

Version 1 Version 2
Simple seal Double lip seal

In tunnels with a large diameter In tunnels with a small diameter

Advantages Advantages

- Little weight of the seal, - only one seal admission (steel


the steel manufacture for fixing the structure) is needed, thus a smaller
seal is not so strong complexity of the steel structure
- reconciliation of larger tolerances in - the assembly of the seal is easy
the steel structure of the starting seal,
with the TBM and with the starting
situation of the machine

Disadvantages Disadvantages

- You need 2 separate seal receptions - the distance of the individual lips is
for the steel structure geometrically given, this means only
- Great deal of assembly work this distance can be used to tolerance
reconciliation
- higher weight
1.2. Starting seal - Version 1 - Simple seal, Type Hydro Shield
1.2. Starting seal - Version 2 - Double lip seal, Type Hydro Shield

Concrete shuttering pipe


1.2. Starting seal - Version 3 - Simple lip seal, Phönix, Type Hydro Shield
1.2. Starting seal - Version 4 - Simple lip seal, Dätwyler, Type EPB Shield
1.2. Starting seal - Version 5 - Additional starting seal, Type EPB Shield
1.2. Starting seal - Version 6 - Additional starting seal, Type Hydro Shield
1.2. Starting seal - complete, Type Hydro Shield
1.3. Shield cradle / start cradle - with blind ring support
1.4. Compensation ring with abutment steel construction
1.5. References - Start phase
1.5.1. Project Channel-Tunnel-Rail-Link - London, UK

Manufacturing shield cradle


1.5. References - Start phase
1.5.1. Project Channel-Tunnel-Rail-Link - London, UK

Manufacturing abutment steel construction


1.5. References - Start phase
1.5.2. Project Pannerdensch Kanaal, Netherlands

Starting seal
1.5. References - Start phase
1.5.2. Project Pannerdensch Kanaal, Netherlands

Concrete shuttering pipe with stiffner cross


1.5. References - Start phase, Type EPB and Hydro Shield
1.5.3. Project Wientalsammler, Austria
1.5. References - Start phase
1.5.3. Project Wientalsammler, Austria

Start phase
1.5. References - Start phase, Type EPB Shield
1.5.4. Project Katzenbergtunnel, Germany
1.5. References - Start phase
1.5.4. Project Katzenbergtunnel, Germany

Start phase
1.5. References - Start phase
1.5.4. Project Katzenbergtunnel, Germany

Start phase
1.5. References - Start phase
1.5.5. Project Flughafen S-Bahn Hamburg, Germany

Start phase
1.5. References - Start phase
1.5.6. Project City Tunnel Leipzig, Germany

Start phase
Projekt
2. Run-out
Channel-Tunnel-Rail-Link
phase, Type Hydro- London,
Shield UK
Run-out phase consist of:

2.1. Concrete shuttering pipe


2.2. Run-out construction, chassis / compensation ring
2.3. Chassis cover
2.4. Extension
2.5. Shield cradle
2.6. References

aber
2. Run-out
Projekt Channel-Tunnel-Rail-Link
construction, chassis / compensation
- London, UKring

start supe
r
2.1. Concrete shuttering pipe with stiffener cross

start supe
r
2.2. Reception ring, chassis, compensation ring

start supe
r
Projekt
2.3. Special
Channel-Tunnel-Rail-Link
cover - anchored in the
- London,
shaft wall
UK

start supe
r
Projekt
2.3. Special
Channel-Tunnel-Rail-Link
cover - anchored in the
- London,
shaft wall
UK

start supe
r
Projekt Channel-Tunnel-Rail-Link
2.4. Extension - London, UK

start supe
r
Projekt Channel-Tunnel-Rail-Link
2.5. Shield cradle - London, UK

start supe
r
2.6. References - Run-out phase

2.6.1. Project Sophiatunnel, Netherlands

Delivery concrete shuttering pipe with stiffner cross


2.6. References - Run-out phase

2.6.1. Project Sophiatunnel, Netherlands

kl

Concrete shuttering pipe with stiffner cross


2.6. References - Run-out phase, Type Hydro Shield

2.6.1. Project Sophiatunnel, Netherlands

kl

Run-out phase
2.6. References - Run-out phase, Type Hydro Shield
2.6.1. Project Sophiatunnel, Netherlands

kl

Special cover - anchored in the shaft wall


Diameter: 11,5 m
Chassis: 40,0 t
Compensation ring: 10,0 t
If you use this special construction you don‘t need a abutment steel construction.
2.6. References - Run-out phase, Type Hydro Shield
2.6.2. Project Wesertunnel, Bremen, Germany

kl

Cover with back up support


2.6. References - Run-out phase, Type Hydro Shield
2.6.3. Project Channel-Tunnel-Rail-Link - London, UK

kl

Run-out phase on the jobsite


2.6. References - Run-out phase, Type Hydro Shield
2.6.3. Project Channel-Tunnel-Rail-Link - London, UK

kl

Connection ring
2.6. References - Run-out phase, Type Hydro Shield
2.6.3. Project Channel-Tunnel-Rail-Link - London, UK

kl

Run-out phase of the TBM