Matarbari Ultra Super Critical Coal-Fired Power Project

RFQ-Technical Specification

Technical Specification

< CONTENTS >

0. COMMON APPLICATION ............................................................................................2

1. CABLE / WIRE.............................................................................................................33

2. CONDUIT......................................................................................................................66

3. CABLE TRAY / DUCT / RACEWAY .........................................................................88

4. EARTHING / LIGHTNING SYSTEM..................................................................... 1010

5. LIGHTING / SOCKET OUTLET ............................................................................ 1111

6. COMMUNICATION SYSTEM................................................................................ 1919

7. SECURITY SYSTEM.............................................................................................. 3535

8. FIRE DETECTION AND ALARM SYSTEM ......................................................... 4545

9. EQUIPMENT ........................................................................................................... 5454

10. TEMPORARY POWER SUPPLY AND OTHERS ............................................... 6161

11. COMMON / OTHERS ............................................................................................. 7070


Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

0. Common Application

1) All tools and materials for installation are included in the scope of supply of
subcontractor.
2) Set/Chemical Anchor Bolt & Nut, Washer, Shim, Liner, Taper Liner for the
installation of all the equipments and materials are included in the scope of supply
of subcontractor.
3) Subcontractor should carry out self-test and accomplish the inspection of 3rd party
/ Owner / Contractor.
4) Subcontractor should submit the certificate of performance guarantee for the all
equipments and materials.
5) Subcontractor should accomplish all concerned inspection and test at the site
6) Subcontractor should obtain all necessary license of government office.
7) Components of Transformer, Switchgear and other Panels must be used as the
imported from foreign maker and can be assembled in Bangladesh.
8) All Cable and Wire’s terminal/connection works and test are included in the scope
of supply of subcontractor.
9) All Accessories / Sub-Materials /Components for each item’s supply and
installation are in the scope of supply of subcontractor.
10) The all Material of Steel should be Hot Dip Galvanized or SUS304/316, if it is
not specified in this specification or drawing.
11) Cables and cable trays have to fulfill the all necessary number plates for
identifying the cables
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

1. Cable / Wire

1.1 Power Cable

- Power Cable for underground(FR-CNCV)


: Fire Resistant / Flame Retardant, Concentric Neutral Type Power Cable XLPE
Insulated PVC Sheathed unarmored power cable for multiple earth underground
distribution line, Annealed Copper Wire conductor / Internal Semi-conductive
Layer: Semi-conductive Thermosetting Compound / Insulation: TR-XLPE /
External Semi-conductive Layer: Semi-conductive Thermosetting Compound /
Water Layer of Neutral Wire : Swelling Tape / Neutral Wire: Annealed Copper Wire,
including termination kit, terminal lug, Terminal cap, insulation tube, cable tie,
sleeve, Pull Box, Outlet Box, Cable Glands(BRASS & RUBBER PACKING), hi-pot
test, etc

- Power Cable (FR-CV)


: Fire Resistant, Cross linked polyethylene insulation, High Density Polyethylene
& PVC sheathed unarmored power cable, CU / XLPE / HDPE / UNARMOURED /
Flame-Retardant PVC, including termination kit, terminal lug, Terminal cap,
insulation tube, cable tie, sleeve, Pull Box, Outlet Box, Cable Glands(BRASS &
RUBBER PACKING), hi-pot test, etc

- HFIX Wire
: Fire Resistant, Low Smoke and Halogen Free Thermosetting Polyolefin
INSULATED WIRE (HFIX) for Building including terminal lug, Terminal cap,
insulation tube, sleeve, cable tie, Pull Box, Outlet Box, Cable Glands(BRASS &
RUBBER PACKING), WIRE CONNECTOR, etc

Note) Lighting Cable is included in “ 1.1 Power Cable ” item.


Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

1.2 Earthing / Lightning Wire

- GV Wire
: Fire Resistant GREEN PVC INSULATED, STRANDED COPPER WIRE including
Compression type terminal lug, Compression Type Connector, Sleeve, Clamp,
Earth Terminal/Test Box(with Busbar), Pull Box, Outlet Box, Bolt & Nut, cable tie,
sleeve, Cable Glands(BRASS & RUBBER PACKING), etc

- BC Wire
: BARE STRANDED ANNEALED COPPER WIRE, Including Compression type
terminal lug, Compression Type Connector, Heavy Duty Cast Cable Saddle(Copper),
One Hole Clip with Round head Steel Screw, Test Clamp with Countersunk Steel
Screw, Sleeve/clamp, Grounding Box(with Busbar), TEST WELL(with Busbar),
Rubber Expansion Anchor, Earth pad, cable tie, Pull Box, Outlet Box, Earthing BAR,
Steel Plate(Hot dip galvanized), Bolt&Nut,Washer, etc

- Zinc Steel Strip ( for Foundation Earthing & Screening)


: 30mm x 3.5t, 25kg role(weight : as fer maker standard), Hot-dip galvanized
Note) Instead, Min.10mm Dia. Zinc Coated Round Steel can be used after
receiving approval.

1.3 Control / Signal Cable

1) CVV
: Fire Resistant, 0.6/1KV FR-CVV (CONTROL CABLE, OVERALL SHIELD),
UNARMOURED, 0.6/1kV XLPE Insulated and Tray Flame-Retardant PVC
Sheathed Control Cable(TFR-CVV), including terminal lug, Terminal cap,
insulation tube, sleeve, cable tie, Pull Box, Outlet Box, Cable Glands(BRASS &
RUBBER PACKING), etc
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

2) CVVS
: Fire Resistant, 0.6/1KV FR-CVVS (SIGNAL CABLE, INDIVIDUAL+OVERALL
SHIELD), UNARMOURED/PVC INSULATION/COPPER TAPE SHIELD/FLAME-
RETARDANT PVC SHEATH, including terminal lug, Terminal cap, insulation tube,
sleeve, cable tie, Pull Box, Outlet Box, Cable Glands(BRASS & RUBBER
PACKING), etc

3) CVV-SB
: Fire Resistant, 0.6/1KV Tray Flame-Retardant PVC Sheathed Copper. Braid
Shield Control Cable, including terminal lug, Terminal cap, insulation tube, sleeve,
cable tie, Pull Box, Outlet Box, Cable Glands(BRASS & RUBBER PACKING), etc

4) CPEV
: Fire Resistant, City Pair Polyethylene PVC, UNARMOURED, Polyethylene
insulated Polyvinyl Chloride sheathed pair cable for telephone, shielding consists
of a combination of aluminum foil laminated polyester tape and drain wire, for easy
grounding, Flame retardant and weather resistant, including terminal lug, Terminal
cap, insulation tube, sleeve, cable tie, Pull Box, Outlet Box, Cable Glands(BRASS
& RUBBER PACKING), etc

5) UTP Cable
: UNSHIELDED TWISTED PAIR Cable, SOLID ANNEALED COPPER 1/0.5mm
CONDUCTOR, CAT.7-4/25/50/100P, PVC INSULATION, SCREENED AND PE
SHEATH, Including Pull Box, Outlet Box, terminal/Splicing/Connection kits &
communication test, Cable Glands(BRASS & RUBBER PACKING), etc
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

6) F/O Cable
: Fiber Optic Cable 12C(or24C), Loose Tube Optic Cable - Direct buried, 6hairs/
tube, 2 tubes, outdoor type, including Pull Box, Outlet Box, terminal kits and
Splicing/Connection work & communication test, Cable Glands(BRASS &
RUBBER PACKING), etc

7) FR-3 Cable
: Fire Resistant and Heat Resistant Cable, XLPE Insulated and PVC Sheathed
Heat-Resistant Control and Signal Cable, Solid or Circular stranded annealed
copper conductor, , Multi Cores or Twisted Pairs of cable shall be assembled to
form a circular cable with a fire-protect layer including terminal lug, Terminal cap,
insulation tube, sleeve, cable tie, Pull Box, Outlet Box, Cable Glands(BRASS &
RUBBER PACKING), etc

2. Conduit

2.1 ELP CONDUIT


1) Corrugated hard polyethylene pipe
2) Including accessories such as Coupling, Spacer(bottom, pair / intermediate),
End-Cap, Warning tape, Cable Gland, etc
3) Including separate support for conduit when it is installed to be exposed.

2.2 CD CONDUIT
1) Fire Resistant Polyethylene Corrugated Conduit
2) Including accessories such as Coupling, Coupling Socket, Saddle, Spacer,
Saddle Spacer, End-Bell, Outlet Box, Junction Box(Square, Circle, octangle,
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

2way, 3way, 4way, etc), Mounting Block Box, Box Connector, Conduit Clamp,
Conduit Bushing, Reducer, Pipe Mounting Bracket, Corn Sleeve, End Cover,
Other pipe fittings, Warning tape, etc

2.3 HI-PVC / HI-VE CONDUIT


- Fire Resistant High Impact PVC Rigid Unplasticized Polyvinyl Chloride Conduit
- Including accessories such as Coupling, Coupling Socket, Saddle, Spacer,
Saddle Spacer, End-Bell, Outlet Box, Junction Box(Square, Circle, octangle,
2way, 3way, 4way, etc), Mounting Block Box, Box Connector, Normal Bend,
Conduit Clamp, Conduit Bushing, Elbow, Cross, Tee, Reducer, Pipe Mounting
Bracket, Other pipe fittings, Bushing/Connector, Warning tape, etc

2.4 RIGID STEEL CONDUIT

: HOT-DIP GALVANIZED, NPT THREAD, BOTH ENDS WITH COUPLING,


Including HOT-DIP GALVANIZED Accessories such as Couplings(Pipe & Pipe,
Pipe & Box, Pipe & Normal Band), Union Coupling, Bushing, Normal Band, Lock
Nut, Pipe & Box Connector, Pipe & Flexible Connector, Threadless Pipe to Pipe,
Threadless Pipe to Box, U-Clamp, Pipe Hanger, Entrance Cap, Pipe Clamp, Multi
Clamp, Saddle, Pipe Rack, Cable Gland, Bolt/Nut, Condulet(LL/LB/LR/T/etc type),
Conduit Reducer, Pull Box, etc

Conduits and conduit fittings shall be used Class 4 protection against corrosion.
The protective coatings on conduits and associated fittings shall be identical. No
conduits having an outside diameter of less than 15mm shall be used. Conduit
boxes mounted outside a building shall have external fixing lugs. Boxes shall be
of malleable cast iron and shall have a protective coating of zinc. Box covers shall
have a machined surface around the perimeter matching with similar machined
surface on the box. The cover fixing screws shall be of brass.
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

2.5 FLEXIBLE STEEL CONDUIT

: WEATHER PROOF TYPE, ZINC ELECTRO PLATED, PVC COATED,


including Flexible male/female Connector(Zn - DIECASTING, RUBBER
PACKING), Union Coupling, Nipple, Plug, Adapter , Sealing compound, etc

2.6 FLEXIBLE STEEL CONDUIT (Explosion Proof Type)

: Explosion Proof Type, WEATHER PROOF TYPE, ZINC ELECTRO PLATED,


PVC COATED, including Flexible male/female Connector(Zn - DIECASTING,
RUBBER PACKING), Union Coupling, Nipple, Plug, Adapter , Sealing
compound, CONDUIT DRAIN SEAL FITTING(Horizontal / Vertical Type) , etc

3. Cable Tray / Duct / Raceway

3.1 Cable Tray(Ladder type)

- Ladder type, Hot Dip Galvanized


- Size : Height(100/150), Width(50/100/200/300/450/600/etc)
- Components : Straight, Elbow, Tee, Cross, Riser, Connector, Bonding
Jumper, etc
- Including Tray Cover, Clamp for tray cover, Bolt&Nut (Shank / Hex / Spring
/ LongStud) with Washer, Hold Down Clamp, etc
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

3.2 Cable Tray(Duct type)

- Duct type, Hot Dip Galvanized


- Size : Height(100/150), Width(50/100/200/300/450/600/etc)
- Components : Straight, Elbow, Tee, Cross, Riser, Connector, Bonding
Jumper, etc
- Including Tray Cover, Clamp for tray cover, Bolt&Nut (Shank / Hex / Spring /
LongStud) with Washer, Hold Down Clamp, SIDE RAIL CLAMP, etc

3.3 CABLE TRAY SUPPORT MATERIAL

1) Single Channel(Unistrut) : STS304, 41x41x2.6t, Hot Dip Galvanized


2) Double Channel(Unistrut) : STS304, 41x82x2.6t, Hot Dip Galvanized
3) Post Base(for Single Channel) : 41 x 41 x 2.6t-4 HOLES(or No-hole), Hot
Dip Galvanized
4) Post Base(for Double Channel) : 41 x 82 x 2.6t-4 HOLES(or No-hole), Hot
Dip Galvanized
5) Including Channel End CAP(PVC), 3-HOLE ANGLE FITTING, GUESSETTED
TEE BRACKET, ROUND HEAD BOLT & NUT W/WASHER (SUS 304, M10 x
30L), HEX HEAD BOLT & SPRING NUT W/ WASHER(M12 x 30L, HOT DIP
GALVANIZED or SUS316L), EXPANSION ANCHOR BOLT & NUT
W/WASHER(HOT DIP GALVANIZED, M12 x 100L)

3.4 LIGHTING FIXTURE RACEWAY

- Duct type, Hot Dip Galvanized, with Cover


- Size : Height(40/50/etc), Width(40/70/110/etc)
- Including Cover, Cover Band, Joiner, Elbow, Tee, Cross, Riser, Connector,
Expansion Joint, Bonding Jumper, Bolt&Nut(Shank),
Bolt&Nut(Hex/Spring/LongStud), Washer, Cover Clamp, Junction Box, End
Cap, Hanger(Ceiling Fixed Type or etc), Joint Box, etc
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

3.5 Cable Multi-Duct

- Material : Plastic or etc


- Ladder or Duct type, with Cover
- FOR FLOOR TYPE RECETACLE & TEL & LAN OUTLET, etc
- Size : Height(30~100mm), Width(30~100mm)
- Including Straight, Elbow, Tee, Cross, Riser, Connector, Expansion Joint,
Joiner, Duct Cover, Connection Material, Clamp, Support, etc

4. EARTHING / LIGHTNING SYSTEM

4.1 Grounding Rod


- 16Φ / 19Φ x 2400~3000L, tinned stranded soft copper conductor or copper
bars
- Including U-bolt Connector, Connector Clamp, Earth pad ( 82 x 82 x 8t,
Compression type FOR MANHOLE & TRENCH WALL), Earth terminal box /W
BUS BAR, Steel plate (100 x 50 x 6t ,Hot dip galvanized), Bronze bolt & nut
w/washer, TEST WELL, etc

4.2 Lightning Catching Rod(Air Terminal)

- Size : 16ф x 1000mmL / 15Øx500mmL

- Material : Stainless Steel


- Including Accessories such as Air terminal Base of Flat Saddle(Copper), Tee
Connector, Expansion Bolt, Sealing compound, HEAVY DUTY CAST CABLE
SADDLE (COPPER) WITH FIXING CSREW, TEST CLAMP (Link box),
SEALING COMPOUND, ONE HOLE CONDUIT CLIP HOT DIP
GALVANIZED, SHEET METAL SCREW STAINLESS STEEL(M5x25mmL),
RUBBER EXPANSION ANCHOR (w/WASHERS)(M5), etc
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

4.3 Cadweld system

- CADWELD : #15 / #25


- Including Mold : "TEE" & “CROSS” type
- Including Epoxy : AR-16 or equivalent
- Including BACKFILL CANISTER : Φ6"x84"L
- Including Powder, Handle Clamp, Flint Ignitor, Special Tool Kit, etc

5. Lighting / Socket Outlet

5.1 Lighting Fixture


1) LED Lighting Fixture (Ceiling Recessed Mounting Type)
General Purpose, IP44
Ceiling Recessed Mounting Type
High Purity Aluminum Reflector
Steel Plate Min. Thickness 0.7mm
High Power Factor & High Efficiency Electronic Ballast
240V AC, 50HZ, LED BULB(40W)

2) LED Lighting Fixture (Ceiling Recessed Mounting Type, with Battery)


General Purpose, IP44
Ceiling Recessed Mounting Type
High Purity Aluminum Reflector
Steel Plate Min. Thickness 0.7mm
High Power Factor & High Efficiency Electronic Ballast
240V AC, 50HZ, LED BULB(40W)
(Self-contained battery backup & test switch, 90 minute operation)

3) LED Lighting Fixture (PL DOWN LIGHTING type)


CEILING RECESSED MOUNTING TYPE, IP54
ENAMELED SHEET STEEL HOUSING W/ALUMINUM
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

DIFFUSER PORCELAIN MOGUL SOCKET


High Power Factor & High Efficiency Electronic Ballast
240V AC, 50HZ, LED BULB(40W).

4) LED Lighting Fixture (Ceiling Surface Mounting type)


CEILING SURFACE MOUNTING TYPE, IP54
ENAMELED SHEET STEEL HOUSING W/ALUMINUM
DIFFUSER PORCELAIN MOGUL SOCKET
High Power Factor & High Efficiency Electronic Ballast
Aluminum housing with PORCELAIN MOGUL SOCKET
with Sensor(for automatic light on when someone approach)
240V AC, 50HZ, LED BULB(40W)

5) LED Lighting Fixture (Concrete Surface Mounting Type)


Commercial Lighting, IP65
Concrete Surface Mounting Type
With Junction Box & Complete Mounting Hardware
Flexible Connector or Flex Cord
High Power Factor & High Efficiency Electronic Ballast
240V AC, 50HZ, LED BULB(40W).

6) LED Lighting Fixture (Concrete Surface Mounting Type, EXPLOSION PROOF


TYPE)
Commercial Lighting, IP65
Concrete Surface Mounting Type
With Junction Box & Complete Mounting Hardware
Flexible Connector or Flex Cord
High Power Factor & High Efficiency Electronic Ballast
240V AC, 50HZ, LED BULB(40W).

7) LED Lighting Fixture (Pipe pendant mounting Type)


Pipe pendant mounting type, IP65
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

Weather Proof
Cast iron mounting box & Cast aluminum alloy body
High Power Factor & High Efficiency Electronic Ballast
Heat resistant hard glass globe
Stainless steel guard, extra pure aluminum reflector
240V AC, 50HZ, LED BULB(130W).

8) LED Lighting Fixture (Pipe pendant mounting Type, Explosion Proof type)
Pipe pendant mounting type, Explosion Proof type IP65
Weather Proof
High Power Factor & High Efficiency Electronic Ballast
Cast iron mounting box & Cast aluminum alloy body
Heat resistant hard glass globe
Stainless steel guard, extra pure aluminum reflector
240V AC, 50HZ, LED BULB(130W).

9) LED Lighting Fixture(Flood lighting, Stanchion mounting type)


Stanchion mounting(5M) & junction box
Weather Proof, IP65
High Power Factor & High Efficiency Electronic Ballast
Cast iron mounting box & Cast aluminum alloy body
Heat resistant hard glass globe
Stainless steel guard, extra pure aluminum reflector
240V AC, 50HZ, LED BULB(400W).

10) LED Lighting Fixture(Food lighting, Stanchion mounting, Explosion Proof Type)
Explosion Proof Type
Stanchion mounting(5M) & junction box
Weather Proof, IP65
High Power Factor & High Efficiency Electronic Ballast
Cast iron mounting box & Cast aluminum alloy body
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

Steel ballast box


Heat resistant hard glass globe
Stainless steel guard, extra pure aluminum reflector
240V AC, 50HZ, LED BULB(400W).

11) LED Lighting Fixture(Food lighting, Bracket Mounting Type)


Bracket Mounting Type
Weather Proof, IP65
High Power Factor & High Efficiency Electronic Ballast
Cast iron mounting box & Cast aluminum alloy body
Heat resistant hard glass globe
Stainless steel guard, extra pure aluminum reflector
240V AC, 50HZ, LED BULB(400W).

12) LED Lighting Fixture(Food lighting, Bracket mounting type, Explosion Proof Type)
Bracket mounting type, Explosion Proof Type
Weather Proof, IP65
High Power Factor & High Efficiency Electronic Ballast
Cast iron mounting box & Cast aluminum alloy body
Heat resistant hard glass globe
Stainless steel guard, extra pure aluminum reflector
240V AC, 50HZ, LED BULB(400W).

13) LED Lighting Fixture(Road lighting with Pole)


Weather Proof, IP65
Photo Electrically Controlled Type
Die-cast aluminum housing w/anodized aluminum mirror
Heat resistant clear acryl bowl
High Power Factor & High Efficiency Electronic Ballast
240V AC, 50HZ, LED BULB(130W)
Pole(Hot Dip Galvanized, 8m) and Concrete Base
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

14) LED Lighting Fixture(Road lighting with Pole, Explosion Proof Type)
Explosion Proof Type
Weather Proof, IP65
Photo Electrically Controlled Type
Die-cast aluminum housing w/anodized aluminum mirror
Heat resistant clear acryl bowl
High Power Factor & High Efficiency Electronic Ballast
240V AC, 50HZ, LED BULB(130W)
Pole(Hot Dip Galvanized, 8m) and Concrete Base

5.2 LIGHTING DISTRIBUTION PANEL

1) LIGHTING DISTRIBUTION PANEL


OUTDOOR TYPE, METAL ENCLOSED, SELF-STANDING TYPE
IP55, 3PH, 4W, 50Hz, 415/240V
THERMAL RELAY, TIMER RELAY
GROUNDING SENSOR & RELAY
CONTROL & METERING
DEVICES AND ACCESSORIES
INCOMING MCCB : 4P x 100AF x 1 set
DISTRIBUTION BRANCH ELB : 4P x 100AF x 2 sets, 2P x 50AF x 10 sets

2) LIGHTING DISTRIBUTION PANEL


OUTDOOR TYPE, WEATHER PROOF TYPE,
METAL ENCLOSED, SELF-STANDING TYPE,
IP55, 3PH, 4W, 50Hz,415/240V
THERMAL RELAY, TIMER RELAY
GROUNDING SENSOR & RELAY
CONTROL & METERING
DEVICES AND ACCESSORIES
INCOMING MCCB : 4P x 50AF x 1 set
DISTRIBUTION BRANCH ELB : 2P x 30AF/20AF x 10 sets
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

5.3 DC Lighting System


lighting fixtures fed from 220V, DC Supply. The supply to the DC lighting panels
shall be automatically switched ON in case of loss of AC supply. The DC supply
will be automatically switched OFF after about 3 minutes following the restoration
of supply to normal AC or emergency AC lighting system. Emergency DC lighting
is to be provided, through self-contained DC emergency fixtures with four hours
back-up duration. In addition, safety "EXIT" lights are to be provided that The
safety “EXIT” lights must comprise a flame-resistant plastic casing for flush-
mounting, with a transparent, green, plastic cover and white lettering, in protection
type IP 54, equipped with bulb, reflector, cable connection terminals etc

5.4 Tumbler Switch


1or2-Way, 1or2GANG, 1or2 Socket, including weather proof type with cover
Normal / Explosion Proof Type

5.5 AIRCRAFT WARNING LIGHTING / Interior Lighting


The Contractor shall provide the Aeronautical lights in the stack. The arrangement
shall comply with the requirements and recommendations of the air transportation
authority. The lamp shall be mounted on the outside face of galvanized swing-type
window which is fixed on the windshield. The lamp shall be protected by a watertight
transparent cover mounted in such a manner that an electrical interconnection can
disconnect the power supply to the lamp when the cover is opened. The power
supply cables shall be copper conductor cable with PVC insulation set in galvanized
steel conduit. The aeronautical light system shall include a daylight switch. The
daylight switch shall have the switching off relay circuits by daylight intensity and
shall have sufficient amperes capacity to hold the relays continuously. The
Contractor shall supply the spare lamps to ensure the continuity of the services for
a period of not less than two (2) years from the expiry of the Guarantee Period
During the construction period of the stack throughout the duration of the contract
period, the Contractor shall provide temporary aeronautical lights at appropriate
levels of the windshield and remove it upon the commissioning of the permanent
aeronautical lights.
Medium intensity obstruction light & Low intensity obstruction light Including
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

Supporters, lighting panels of control unit(240V, 50Hz, Automatic Switch,


Auto/Manual Selector Switch, Fault report available on terminal, LED indicators,
Electronic Alarm, Lightning protection), daylight-operated switch device adjusting
range from 2 to 100 lux and ATS for normal or emergency

Interior Lighting and Small Power


The interior lighting and small power including all fittings shall be provided as per
maintenance and operation requirement subject to the approval of Engineer. The
Contractor shall include necessary provision for cabling and other associated works.
The lighting and small power installation shall comply with the relevant parts of the
Specifications.

Distribution Board
The Contractor shall provide the distribution board to supply power to the warning
lights, interior lighting and small power. The distribution board shall be mounted on
the wall inside the windshield with the top of the board being 1,800 mm above the
ground floor level.

5.6 Marine Warning Sign / Light

Marine(jetty, intake and outfall etc.) Warning Signs, Lights and Signals
Marine (Jetty, Intake and Outfall etc.), warning signs, lights and signals shall be in
accordance with port authority and local regulations.

5.7 SOCKET OUTLETS

1) Receptacle for Office/Accommodation


Protected Polycarbonate, Flush Mounted Type, weather proof type, AC 240V,
16A , 2G, 3P(Single phase+E), two outlets, with Lamp, with Cover,

2) Receptacle for Welding / Machine


Protected metal-clad to IPW55, Industrial type, Weather proof type, AC 415V,
63A / 125A, 5P(Three phase+Neutral+E), with male & female connector, with
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

spring-return flap cover, including ELB Box(for load disconnector switch and
residual current protection device rated at 30 mA).
The plug and socket shall be interlocked such that the unit cannot be switched
on until the matching plug is fully inserted, nor can the plug be withdrawn with
the switch closed.
Facility for incoming supply cable looping, and Provision for padlocking the
switch in the off position.

3) Receptacle for Welding / Machine (explosion Proof type)


Explosion Proof type, Protected metal-clad to IPW55, Industrial type, Weather
proof type, AC 415V, 63A / 125A, 5P(Three phase+Neutral+E), with male &
female connector, with spring-return flap cover, including ELB Box(for load
disconnector switch and residual current protection device rated at 30 mA).
The plug and socket shall be interlocked such that the unit cannot be switched
on until the matching plug is fully inserted, nor can the plug be withdrawn with
the switch closed.
Facility for incoming supply cable looping, and Provision for padlocking the
switch in the off position.

4) System Box
FLOOR/WALL FLUSH MOUNTED type, weather proof type
AC 240V, 16A , 3P(Single phase+E), two outlets for power receptacletwo
outlets(Data & Voice) for communication(8pin module, RJ-45) with Cover(brass)

5) LAN terminal Socket Outlet : 2port


Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

6. Communication System

6.1 TELEPHONE & LAN SYSTEM

The telephone system shall be suitably interfaced to the PA system to enable PA


announcements from each telephone set (depending on the granted permission
of the dedicated telephone set). The telephone system shall be a modern, state-
of-the-art hybrid Private Automatic Branch Exchange (PABX) which is based on
packet-switched IP and also supports traditional circuitswitched Time Division
Multiplex (TDM) telephony on one platform. The IP-PABX shall be of
microprocessor-based design with non-volatile memories and shall have voice
recording facilities, especially for the operator telephone sets. The system shall
be modular in design, enabling flexibility in re-configuring, building up and
expanding the system when required. The system shall be compatible and
connected to the public telephone system. All equipment shall be manufactured
according to the standard of IEC and ITU. The deliverables shall be designed
according to the requirements of the national Telecommunication Rules and
Regulations.

Telephone System Features


The IP-PABX equipment shall be implemented with the following network and user
facilities:
 Alternate path routing:
In case of faulty lines the IP-PABX shall submit call requests to other lines, as far
as alternate lines are available.
 Direct Inward Dialing (DID):
Routing of incoming calls from an incoming trunk directly to the called party
without operator intervention, or if the extension is not known the operator can
connect the caller to the required subscriber.
 Direct Outward Dialing (DOD):
Obtaining access to the telephone network without attendant assistance.
Outgoing trunk lines shall be provided for the connection to the Bangladeshi public
telephone network.
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

 Classes of service:
The IP-PABX shall provide various classes of service. The classes of service shall,
at minimum,
as follows:
1) internal calls only
2) internal calls plus outside calls set up by the operator
3) internal and local outside calls.
4) unrestricted calling.
 Automatic call back on busy:
When a called line or subscriber is busy it shall be possible to execute a call back.
When the busy line or subscriber becomes free the system shall automatically
alert the user that the extension has become free. Once the line is picked up it
shall automatically redial the line / subscriber that were initially busy.
 multiple trunk access codes:
Assignment of the trunk access codes shall be flexible, accommodating one or
two digit access codes
 Automatic Route Selection (ARS):
The equipment shall allow for automatic selection of the best available trunk route
for outgoing calls. If the primary route is blocked, the PABX switches shall be able
to select a secondary route.
 Night answer service:
Manual or automatic transfer or answering of incoming calls from a specified
subscriber number or energizing a common signal. Any user shall be able to
answer the call by entering a single digit code.
 programmable function keys:
The telephone sets shall have programmable function keys for direct or speed
dialing of subscribers
 Call forwarding:
Calls to an unattended user shall be forwarded automatically to another telephone
of the unattended user’s choice. At least three types of call forwarding shall be
supported: all calls, busy and no answer.
 Call transfer:
Transferring of calls to another user shall be possible.
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

 Call on hold:
The telephone system shall permit users to place a call on hold and be able to
dial a third party either local or external. The user shall be able to release or hold
the call, establish a second consultation call, return to the original call or connect
the original call and the consulted party together.
 Abbreviated dialing:
Abbreviated dialing of frequently dialed numbers within or outside the Plant. A
minimum of 50 numbers is required.
 Call waiting:
A busy user shall receive a distinctive tone indicating that a second call is waiting.
The user
shall be able to put the first call on hold to answer the second call and be able to
return to the
original call. Call waiting shall have a visual indication on the telephone.
 Camp-on:
If the called user is busy when a call is made, call- back ringing shall inform the
caller when the user becomes free by using this feature. After the extension
answers the call-back ringing, the dialed number shall be automatically redialed.
 Caller ID / call logging:
The incoming caller’s phone number, or name and number shall be displayed at
system display phones, which are sent from a trunk. Answered and not answered
calls shall be logged. Logged calls shall be called back by selecting the relevant
call and pushing the redial button / key.
 Conferencing:
The IP-PABX shall allow setting up multiple conference calls from 3-party up to 8-
party at the same time.

Voice Recording System


All incoming and outgoing voice communications to and from the power station
operators at any telephone sets and various keys in the CCR and the Hotline
telephone sets must be recorded online. Suitable voice recording equipment,
external to the IP-PABX, must be provided and connected to the IP-PABX.
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

Voice recording functionalities

The voice recording system must provide the following functionality and features
as a minimum requirement:
 configurable phone numbers (extension numbers) for voice recording
 Voice recording shall start immediately when the call is established.
 Start and end of voice recording shall be stored with a date and time stamp.
 For all answered and unanswered calls (incoming and outgoing) the call setup
time from ringing tone issue to call connection shall be stored with a date and time
stamp.
 All data, date and time stamps and the correlated voice recordings must be
locally stored within the voice recorder for at least one (1) week.
 Suitable automatic back up functionality must assure:
 that data or voice recording isn’t possible due to storage capacity of the voice
recorder.
 that a regular back up of data or voice recordings to external storage media
takes place.
 Suitable functionality shall be provided for search and playback of voice
recordings.
 Statistical analysis functionality shall be provided for:
1) recorded voice calls
2) duration of individual voice recordings in average
3) voice recordings per day, week and month
4) amount of successful / unsuccessful operator call (incoming and out-going)
5) graphical presentation of the statistical analysis data.

Telephone sets
Depending on the location different kinds of telephone sets shall be foreseen (e.g.
desk telephone set, handsets, wall mounted telephone sets, explosion poof type,
special heavy duty types with telephone booths and alarm bells).
All IP-PABX switches and subscriber locations shall be equipped with IP
telephone sets with builtin display and IP to analogue bridges for the stand alone
mobile DECT handsets.
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

For the selected persons at the power station advanced IP telephone sets
allowing for all exchange features shall be supplied. Pushbutton extensions
attached to these telephone sets shall contain a single push-button facility for
important contacts (e.g. NLDC, etc.). Pressing a button shall automatically
establish a call with the relevant attendant. These telephone sets shall be
connected to the existing exchange if the services described in this specification
are available.

Requirements for equipment


All telephones and associated equipment installed in the process area or in
outdoor locations shall have IP 65 weather protection in accordance to IEC 60529.
All telephones and associated equipment installed in hazardous areas shall be
certified explosion proof type according to the area of installation.
Suitable telephone booths have to be provided for plant rooms/areas with a high
noise level (e.g. STG hall, pump room, crusher area, burner gallery, etc.).

Office LAN/WAN System


The Office LAN System shall be state of the art. The LAN/WAN cabling provide
interconnection between telecommunication cabinets, equipment rooms, offices,
administration building and all other facilities.
The Office LAN system shall be independent of the data highway of the DCS. Any
connections to the DCS shall be via firewalls only and consider the requirements
specified for cyber security.
The physical requirements of the network interface are defined in the TIA/EIA-
569-A standard. The laying of star shaped cabling system shall be combined with
the cables of the telephone system with combined telephone/data outlets in the
offices, control rooms, electronic rooms, switchgear rooms, workshops. The
cabling shall ensure protection against electromagnetic disturbances, which can
occur in the Plant. Between buildings fiber optic cable shall be installed.
For each office at least two (2) outlets, (one more for each additional 10m²) shall
be provided, but offices/rooms in the Administration Building shall be equipped
with 6 outlets at minimum. For meeting rooms, at least one (1) outlet per two (2)
chairs shall be provided.
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

For each workshop, storage etc. (size until 25 m²) at least 2 outlets and further
outlets one for each additional 25 m² shall be provided (2 outlets for 25 m², 3
outlets for 50 m², etc.). The network system shall be according to the Category 6
or better of the Standard ISI/ IEC IS 11801 (EN50173) with RJ 45 Western type
connectors. The design aspects of the equipment room are specified in the
TIA/EIA-569-A standard. Equipment rooms usually house equipment of higher
complexity than telecommunications closets. The star shape cabling shall go to
common marshalling places containing among others the following equipment:
 marshalling racks for star shaped telephone system and data network with the
connected star shaped cables
 marshalling racks for multicore telephone cables, included in the scope of the
Telephone system
 spare place of at least 100% of the installed capacity and racks for the future
servers, data switches, etc. of the intended Office LAN system
 power supply in a computer room of the administration building for the future
installation of computer room equipment like servers, workstations, PCs and
peripheral equipment provided by others. An Uninterruptible Power Supply (UPS)
shall be provided and shall be located at the administration building to support all
essential computing and net-working equipment. All design drawings and
diagrams for the LAN/WAN system have to be submitted for approval prior
to any implementation.
Network redundancy to be highly considered in the design on the levels of power
supplies, cable route, switches, communication cabinets location and servers
network adapters in order to guarantee 100% network availability with no single
point of failure for the LAN/WAN. Minimum 24 core armoured multi-mode fiber
optic cables shall be laid for any route (outdoor/indoor).
Minimum 10 Gigabit Ethernet standard proven technologies shall be provided in
the LAN to build high-speed redundant connections between switches and
between switches and servers. No redundant connection is required for
Employer’s PCs. Minimum 100 Mbit/sec Ethernet to the desktop shall be provided
for all PCs. Number of ports on network switches shall be determined from the
structured cabling formula used for the buildings in order for covering the entire
work area. All switches shall comply with the standard of Layer3 and Layer4
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

switching techniques. Minimum specifications for Core Switches are as follow:


 high Performance, managed, scalable, high availability core switch for campus
Backbones
 switch provides scalable bandwidth and increased network reach with support
of Layer 2/Layer 3/Layer 4-7 intelligent services with a performance reach up to
210 Million packets per second
 redundant load-sharing power supplies (from independent DC sources)
 redundant supervisor engines, uplinks & system clock
 redundant switch fabrics
 hot swappable switching slot modules
 LAN, MAN & WAN convergence support
 supports various WAN modules (like E1, HSSI [High Speed Serial Inter-face],
E3 with 34.368Mbps, ATM and PoS [Packet-over-SONET]) through flexible WAN
module option.

1) TELEPHONE IP–PABX(INTERNET PROTOCAL Private Automatic Branch


Exchange)
- ELECTRONIC TYPE
- Telephone Operator Console and accessories
- ISDN DIGITAL PORT / DIGITAL TELEPHONE LINE
- Normal Telephone : 300Line
- IP Telephone : 300Line
- ANALOGUE LINE : 32LINE
- DIGITAL C.O (E1 PRI) : 60ch
- MAX EXCHANGER LINE 600LINES
- SWITCH 24PORT
- Patch Panel : 24port
- POWER DISTRIBUTOR UNIT
- HOT LINE TELEPHONE (USE RTU LINE - INSTRUMENT)
- FDF : 4 PORT
- ROUTER 2E / 2S
- GIGABIT ETHERNET - F/O-8PORT
- 19” Rack Cabinet
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

- Administration software and diagnostic facility


For the IP-PABX administration software shall be provided for changes and
modifications regarding feature assignments, line and trunk access, etc. System
management software should be ideally based on an MS-Windows 7 (or above)
operating system. The diagnostic facility shall allow the downloading of e.g. alarm
history and equipment status from each IP-PABX in the network to a central
station. The IP-PABX shall be equipped with self-diagnostic features that will
detect failed modules and give a warning to the operator of trouble. It is preferred
that the IP-PABX automatically isolates such faulty modules and gives an
indication of the location of the failed module or modules to service personnel.
The Contractor shall include any external test fixture or tester for repairing failed
modules. The self-diagnostic features of the IP-
PABX shall be described in the proposal.

2) Main LAN Equipment


- RACK CABINET 19" TYPE
- ROUTER 2E / 2S
- GIGABIT ETHERNET - F/O-8PORT
- SWITCH LAYER-3 SWITCH -24PORT
- PATCH PANEL - 24PORT / PATCH CORD
- POWER DISTRIBUTOR UNIT

3) SWITCH HUB
- Switch 24Port
- FDF : 4 PORT
- FiberOptic-LAN Converter
- Lan-Lan, Internet working Equipment
- PATCH PANEL - 24PORT / PATCH CORD
- Pig tail(SC TYPE)
- RACK CABINET

4) Server
- INTEL XEON TM PROCESSORS 3.0GHZ
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

- HDD SCSI 146GB


- IGB DDR – SDRAM
- LAN CARD AUTO SENSING 10/100BASE-T
- MONITOR 19" / ACCESSORIES
- DVD-WRITER / S/W FOR SERVER OPERATION
- FDF : 4 PORT
- RACK CABINET

5) MDF(MAIN DISTRIBUTION FRAME)


- Voice / Data Communication
- 19" RACK CABINET
- Internal : 2,000 Line
- INDOOR SELF STANDING TYPE
- FDF 64 PORT
- UTP PATCH PANEL 24PORT X2 / PATCH CORD
- POWER DISTRIBUTOR UNIT
- The MDF shall also be equipped with clip jumpers.
- RELATED ACCESSORIES

6) IDF(Intermediated Distribution Frame)


- VOICE : 350P / DATA : 64 PORT
- FDF 4 PORT
- UTP PATCH PANEL 24PORT X4 / PATCH CORD
- POWER DISTRIBUTOR UNIT
- RELATED ACCESSORIES
- RACK CABINET

7) Telephone (Indoor)
- SIP based Digital Telephone set with digital monitor
- Desktop or Wall-Mount or stand-alone cordless telephone type
- Including Telephone Outlet(RJ-45 for Voice and Data)
- Desk telephone sets shall be used only in air-conditioned rooms and offices,
and shall have high impact, dust-tight and temperature-resistant plastic cases.
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

8) Telephone (Outdoor)
- SIP based Digital Telephone set with digital monitor
- Wall-Mount, splash proof type
- Including Telephone Outlet(RJ-45 for Voice and Data)
- Wall-mounted telephone sets for use in rooms that are not air-conditioned
shall have water-and dust-tight (degree of protection at least IP 54)
temperature-resistant plastic cases or to be contained in weatherproof
container.

9) Telephone (Control Room Desk)


- One with separate exchange line for each case
- SIP based Digital Telephone set with digital monitor
- Desktop or Wall-Mount or stand-alone cordless telephone type
- Including Telephone Outlet(RJ-45 for Voice and Data)

10) Telephone (NLDC operations)


- An NLDC(National Load Dispatch Center) operations telephone shall be
provided on operator desk in CCR and this shall be a distinctly-colored
telephone as designated by PGCB. The operations telephone system will
communication with the NLDC over the OPGW (Optical Ground Wire) fiber
optic network
- SIP based Digital Telephone set with digital monitor
- Desktop or Wall-Mount or stand-alone cordless telephone type
- Including Telephone Outlet(RJ-45 for Voice and Data)

11) Telephone (Explosion-proof type)


- In hazard areas such as gas reduction station, etc. wall telephone sets with
explosion-proof and corrosion resistant metal cases shall be provided.
- SIP based Digital Telephone set with digital monitor
- Wall-Mount, splash proof type
- Including Telephone Outlet(RJ-45 for Voice and Data)
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

12) Flexi-call card phone


- Flexi-call card phone to be integrated in the telephone system
- SIP based Digital Telephone set with digital monitor
- Desktop or Wall-Mount or stand-alone cordless telephone type
- Including Telephone Outlet(RJ-45 for Voice and Data)

13) Alarm Bell


For use as an auxiliary bell connected to the relevant telephone sets to meet
the following
minimum requirements:
 type of enclosure IP 54
 housing, light metal, weatherproof
 sound pressure level 110 dB (max.) distance 1 m.
In hazardous areas, the alarm bells used shall be exclusive of the explosion-
proof type.

14) Telephone booth


The telephone booths for wall-mounting are to consist of high impact and
corrosion-proof steel or aluminum material (resistant to UV radiation) and are to
be equipped with the following:
 one (1) internal roof light, type IP 54 enclosure, fully wired with switch
 one (1) external call light, type IP 54 enclosure, marked on three sides
(mounted on roof of telephone booth)
 IP 54 enclosure, for telephone connection cable and cable connection
 including auxiliary bell and telephone relay for auxiliary bell
 noise level inside the telephone booth shall be low enough to enable a
telephone conversation.
For installing telephone booths in hazardous areas all equipment used shall be
exclusively of the explosion-proof type.
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

15) Fax Machine


- four-in-one equipment; tele- facsimile, copying, scanning, printing
- Modem Speed 33,600 bps
- Printer Type Laser
- Memory Capacity 16 MB
- LCD (liquid crystal display)
- Hi-Speed USB 2.0 connected to PC :
- Paper Size : A4

16) Internet Antenna


- Internet Bandwidth Connection
- Modulation : OFDM
- Transmit Power : 28(+/-2) dBM
- Wireless Mode : PTP & PTMP
- Antenna Type : External Antenna
- Port : RJ45 Gigabyte Ethernet
- Function : Audio, Video Network Signal
- Support Range : 50~100 KM
- Antenna Supporting Tower

6.2 PA SYSTEM

All complete PA system to be conforming to the latest state-of-the-art technology


- IP Based Public Address System shall be provided.
The public address system shall consist of:
 Amplifier station
 Control unit with microphone and function keyboard for the shift supervisor’s
office in the central control room (CCR) and the gatehouse
 Interface to telephone system
 Sufficient numbers of loudspeakers
 Digital memory for alarm tones and standard messages
 All required cables, junction boxes and auxiliaries
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

The complete IP based public address (PA) system shall conform to the latest
state of art in the field of PA system engineering.
The purpose of the loudspeaker system is to inform by loudspeakers either a
particular group of people on the whole power station area (incl. GIS area) from a
central point, or to issue suitable instructions to any of these in the event of the
development of any alarm conditions, therefore all areas in the Plant containing
personnel shall be effectively reached by the loudspeaker system.
It must be possible to switch on the following different tone and frequency signals
with the appropriate alarm buttons:
1 – fire alarm
2 – major, large-scale breakdown
3 – gas alarm
4 – all-clear signal (for resetting of alarm).
The PA system shall also be supplied with a siren based annunciation system to
cover all areas within the power station (incl. GIS area).
The following call types shall be signaled by a tone:
 selective call (e.g. only the loudspeakers in the switchgear building will be
switched in)
 group call of several loudspeaker lines
 collective call of all loudspeaker lines.
A central amplifier station shall be set up for broadcast of instructions and
information by plant personnel.

The loudspeaker lines shall be organized for the following zones (minimum)
inclusive of the rooms, which belong to them:
 administration building / workshops / offices
 turbine house / boiler house
 CCR/ LCCs/ electronic rooms
 water and waste water treatment plants
 Plant water pretreatment area
 coal handling plant
 jetty area
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

 GIS
 other outdoor areas.
The instructions and broadcast announcements shall be initiated from a control
unit with microphone on the shift supervisor's desk in the central control room or
from the gatehouse.
Additionally the PA system shall be suitably interfaced to the telephone system to
enable PA announcements from each telephone (depending on the granted
permission of the dedicated telephone set).
The number and placing of the respective loudspeakers shall suit the conditions
of operation and of the environment in such a way that broad cast announcements
can be clearly understood by the operating personnel at every corner of the plant
including the GIS area and non-technical buildings,
etc. The PA system shall serve the whole plant complex, including non-technical
areas. The Contractor shall provide all necessary line balancing assemblies
required in accordance with manufacturer’s recommendations.
Except for speakers in office and similar area, all speakers shall be of the heavy-
duty industrial type with permanent magnet drivers. The speakers shall be
provided with brackets for directional adjustment. Speakers in office and
administration areas shall be ceiling mounted. The speakers in control rooms shall
be concealed above the louvered ceiling in such a manner that they do not cast
objectionable shadows.
The raceways for the PA system shall be separate from those used for other
purposes. Under no circumstances shall communications systems cables be
installed in the same cable trays or conduits with power or control cables unless
so specified.

6.3 INTERCOM SYSTEM

The complete Intercom system (IP based),


The intercom (wireless personnel paging) system shall consist of:
 Desk top control base station (in CCR)
 Goose neck microphone
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

 Build-in loudspeaker
 Slave units with build-in loudspeaker and microphone.
 Junction boxes and auxiliaries.

An intercom system shall be provided for direct two-way communication between


the central control room and selected places in the plant. The intercom system
shall be designed for direct talk between special places, such as:
 central control room (CCR)
 all LCCs
 rooms with DCS equipment for testing and commissioning purpose
 water and waste water treatment plants
 entrance gate
 etc.
The control base station shall be located in the central control room. It shall be
communication via a desktop loudspeaker/microphone console.
Alternatively this system can be integrated in the telephone system as described
above.

6.4 Portable Radio System

The complete Potable radio system as specified under this Chapter 6.9.5.8.
This system shall include, but not limited to;
 Base station tower
 portable UHF transceivers and rechargeable batteries as well as additional
spare batteries with charger unit
 carrying cases for above transceivers with shoulder strap
 portable UHF transceivers with carrying case for use in hazardous areas
 transceivers for mounting in cars
 Eight (8) desk mounted radio stations
 Repeater stations.
Spare capacity after completion of commissioning
At least 15% free space shall be available in all cubicles, junction boxes and
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

marshaling racks after final commissioning. This free space shall be distributed
inside the cubicles in such a way that additional terminals, equipment or modules
may be added to any group of controls.
At least 15% spare cores shall be provided in each control and monitoring cable
(above 4pairs). All spare cores have to be terminated.
At least 10% spare capacity shall be available for defining new analog signals
in long term data storage under fast and slow scanning time.

6.5 Clock System

The complete clock system (IP based) as specified under this Chapter 6.9.5.5.
The clock system shall consist of:
 Redundant master clock (GPS based)
 Slave clocks
 Standalone independent cabinet for clock system
 All required cables, equipment, antennas and accessories.
 All required software
 Interfaces to other systems for time synchronization.

The Clock System shall be state of the art and as a minimum include a redundant
master clock, necessary number of slave clocks, independent power supply
equipment and specified interfaces for synchronizing all control and protection
systems, installed at Site.
The master clock shall provide for highly reliable, accurate and stable real time
information according NTP and Irig B protocol (or any other protocol as required
by systems to be synchronized) especially for the synchronization of the DCS in
order to ensure that time accuracy less than 1 msec. It shall be provided with
necessary interface for synchronizing form external standard time signals e.g.
GPS.
The master clock in turn shall provide necessary safe synchronizing signals to the
following:
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

the specified slave clocks


specified DCS
SCMS of the GIS
specified BPS /PPS
STG control and safeguarding system
electrical protection
maintenance/data management system
building management system
PADO systems
all other supplied PLCs
package unit controllers
specified CCTV surveillance and voice recording system
specified telephone system
servers installed in the LAN Network
access control system.

7. SECURITY SYSTEM

7.1 Access Control System

The complete access control system (IP based).


The access control system shall consist of:
 Main server with all necessary application software and hardware
 Control and data gathering panels/switches
 Card readers/RFID terminals
 Card reader interfaces for data exchange
 Sufficient number of (RFID) cards
 Card printers to be provided.
 All required cables, junction boxes and auxiliaries
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

In order to increase and enhance the level access security to the power plant
(incl. GIS) area, plant buildings, building sections and dedicated rooms an access
security system shall be provided as specified. The Access Security System shall
be fully automatic and shall provide for secure access to the specified locations.
The Access Security System shall be state of the art and as a minimum include a
master server, necessary number of control and data gathering panels, card
reader, magnetic locks, printers for ID cards, ID cards, push buttons, independent
power supply back up equipment and all software programs for the access
security system.
The Access Security System shall be based on a real time operating system and
have functions, but not limited to the following:

Management software
Software used for managing the cardholder access privileges and the policy with
at minimum listed
features:
 password protection against unauthorized tampering with the system
 card blocking functionality to allow access permissions to be withdrawn at any
time and that the entire key system do not need to be replaced
 freely definable closed days and blocked
 groups of exempted time zones
 real time monitoring of events
 logging of all error messages
 ability of retrieving messages/alarm that indicates incidents
 online analyses off personnel movements
 expandable and upgradeable
 automatic backup and restore facilities for at least one (1) year
 history of past movements with extensive query filters
 no limit for number of employees
 data should be recorded and saved in printable format
 report generation.
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

Interface ID-Works software


Software used for printing ID card with at minimum listed features:
 dynamic database definition and manipulation
 imaging
 custom layout design
 ID card printing
 providing a passport photo of the cardholder with high quality of image
 free definable type of cardholder, e.g. visitor, employee, contractor, etc.
 recording and saving of cardholder profile
 print ID card using general ID printer
 single/double sided layout creation
 portrait/landscape mode layout
 unlimited number of layout creation
 layout can include barcode, magnetic strip, holder signature, authorized
signature, background bitmap and database fields.

Location of hardware items


The following requirements for these locations shall be considered as minimum:
 All gates and access doors to the plant area (incl. GIS) shall have two card
readers for both side in/ out access.
 Main doors of all buildings shall have two card readers for both side in/out
access.
 Rooms, which requires high security attention, (e.g. CCR, LCR, engineering
room, electrical and electronic rooms, etc.) shall have access system with one
reader from outside and push button from inside.
 Push button to open all doors for emergency cases shall be available in
certain locations, which are easy to be reached and secured at the same time.
 If any door is kept open for a longer time than designated, then it shall show
an alarm and shall be registered.
 In case for a genuine reason like loading/unloading of material is being done,
then the door alarm shall be there – but it shall be ignored.
The Access Security System shall be capable of being zoned by area, time
and access provided to multiple zones. All failures/faults shall be centrally
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

annunciated. No single component, module or function shall lead to total


failure of the Access Security System and the effect of such a failure shall be
limited to a maximum of one surveillance site.
The Access Security System shall be modular designed to achieve the
maximum flexibility in configuring the system. The Access Security System
shall be fully expandable. The Access Security System shall control all main
gates/doors as well the doors to different areas/buildings/floors within the
buildings. Locations of card readers, control and data gathering panels, push
buttons and alarm points etc. shall be determined under engineering phase in
accordance with the final access and operation philosophy.
The access control system shall be interfaced with the CCTV system.

7.2 CCTV SYSTEM

The complete CCTV system (IP based) as specified under this Chapter 6.9.5.4.
The CCTV system shall be provided to overview complete plant, in particular:
: Sufficient number of color cameras including lenses (fixed and zoom lenses),
outings and housings to cover the whole power station (incl. GIS) area
 Pan/ tilt units for movable cameras with control units for remote control
 Color monitors for CCR, CH-LCC and guard houses
 Software based video matrix switcher and control system
 Network video recorder/ camera server with NAS
 Video transmission system including cabling, launch, line equalizing, repeating
amplifiers, etc.
 Special cameras for furnace flame and furnace bottom hopper viewing systems
including necessary auxiliaries such as mounting and cooling equipment.
 Color monitor for furnace flame viewing system in CCR
 Sensors for intrusion detection
 Interfaces to other systems.
 All required cables, junction boxes and auxiliaries
The CCTV (IP based) shall mainly consist of a mix of fixed and remotely controlled
cameras positioning devices located in the specific areas, optimized number of video
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

alarm and control monitors, control system for remote control, video recording
equipment, video switching matrices and transmission equipment.

IP-based colored Closed Circuit TV (CCTV) shall be provided for the observance of the
plant during erection, commissioning, re-commissioning, plant operation, etc. which
shall include, but not be limited to:
 stack for stack smoke emission monitoring
 boiler viewing: A number of CCTV cameras for the boiler for monitoring of burner
flames
(furnace flame viewing system) and furnace bottom hopper with adequate auxiliaries
(e.g.cooling system, etc.)
 coal handling plant:
Adequate numbers of cameras to overview coal unloading, coal conveyors, coal
stockpile, stacking and reclaiming
 unloading stations for fuel oil, etc.:
Adequate number of cameras for monitoring the unloading stations during unloading
activities
 jetty
Adequate number of cameras for monitoring the unloading and loading activities at the
jetty
 process areas:
Adequate number of cameras for monitoring of the process areas such as turbine hall,
raw coal feeders, ESP and FGD area, air heaters, boiler firing floor, ash handling areas,
cooling water pump house, demine plant area, air compressors, FGDWWTP,
condensate polishing areas, Plant water pump house etc.
 electrical areas:
Adequate number of cameras for monitoring of the electrical areas such as GIS area,
cable galleries at different areas, switchgear rooms, transformer bays, CER
 ash pond : Adequate number of cameras for monitoring of the ash pond area
 unmanned areas: for monitoring and safety requirements
 security system:
Adequate power station (incl. GIS) security facilities shall be provided for general
surveillance of the site particularly at vulnerable areas such as fences, gates and
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

revolving doors as well as building entrances. Exact locations for cameras shall be
decided during project implementation phase. A video/voice recording device, remote
control operation, multi-screen monitors shall be included in this system. Operation of
the facilities shall be from CCR, CH-LCC and gatehouse.In each case, the CCTV
system shall withstand to the site environment. The CCTV system shall have facilities of
remote control, pan, tilt, zoom, focus and other latest technology functions. For outdoor
cameras humidity conducts (i.e. wiper) shall be provided. All camera views of cameras
installed for fence monitoring shall overlap with adjacent cameras
along the entire perimeter. It shall have image tracking facility. The system must have
the features for identifying tail-gating, vehicle detection features and intrusion detection.
In the defined locations for monitor installation dedicated monitors for the CCTV system
shall be installed. The number shall be such that clear picture recognition is ensured.
In additional case, the CCTV system shall be interfaced with the large video screen
(LVS) monitors in CCR to enable viewing of CCTV picture on the LVS. The CCTV
system shall be ensured to be fully compatible with the large video screen monitor in
CCR. The Contractor shall clearly describe the CCTV system philosophy and
configuration in the bid.

Interfaces to other systems


All communication to other security subsystems and the plant systems shall be done by
standardized interfaces. CCTV shall be interfaced with the following systems so as to
achieve total integration:
 plant fire alarm system
 intrusion detection system (if not integrated)
 access control system
 LVS viewing of CCTV monitoring
CCTV shall be provided with standard interfaces (Ethernet or hardwired) for input and
output control and monitoring signals from the above mentioned systems.
The required I/O shall typically be as given below:
 inputs to CCTV from access control doors/gates of the specified specific areas e.g.
security entry/exit points, etc.
 contact inputs to CCTV from fire alarm system of specific areas (e.g. STG hall, coal
handling area, etc.)
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

 outputs from CCTV to e.g. access controlled doors/gates

Furnace Flame Viewing System


A flame viewing TV system shall be provided to monitor the main burner and igniter
flames. Cameras shall be installed in the furnace wall viewing the flames through
suitable lens tubes and the resulting image displayed on a monitor in the CCR.
The cameras shall be of a robust design specially designed for the purpose of furnace
flame viewing with suitable cooling to protect the equipment from the extreme local
environment. They shall also be protected against ingress of dust and moisture, varying
temperature and humidity and high vibration levels. The design shall allow easy access
and removal for maintenance. The lens, viewing tube and the associated equipment
shall be designed to ensure settlement of dust and debris on the lens is minimized.
Compressed air shall be used for keeping the camera lens clean. Color monitors shall
be provided for each unit and shall be mounted in the CCR. Alarms shall be provided
via the DCS for high temperature or common failure.

Technical requirements for CCTV System


The CCTV system shall be an open standard based integrated system with IP network
based functional and management architecture aimed at providing high-speed
manual/automatic operation for best performance.
The CCTV system shall have combination of digital color video cameras with individual
IP address, analogue CCD (Charge-Coupled Device) or CMOS (Complementary Metal-
Oxide-Semiconductor) color sensors with fixed or P/T/Z (Pan/Tilt/Zoom) lens, encoders
/ decoders, Network Video Recorders (NVR/camera server), Network Attached Storage
(NAS), application software, color video monitors, keyboards with joystick controllers /
mouse-keyboard, software based video matrix switcher, workstation for system
administration / management / maintenance etc. The video/voice shall be compressed
using MPEG-4 or better standard and streamed over the IP network.
The NVR / camera server can be embedded type or server based. However the NVR /
camera server software shall run on common off the shelf available servers (camera
server & database server). Each NVR / camera server shall be able to handle 36 or
more cameras.
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

System shall provide sufficient storage of all the camera recordings for a period of 30
days or more @ 25 FPS, at 4 CIF or better quality using necessary compression
techniques for all cameras.
The area under surveillance shall be monitored and controlled from CCR, CH-LCC and
guard house through workstations and/or joystick controllers.

The system shall operate normally under the maximum voltage and frequency
deviations of the power supply of the plant. It shall tolerate at least a 10% deviation in
the voltage and 2% deviation in the frequency. If necessary, conversion / correction
device for supply shall be supplied along with the equipment.
All the control equipment e.g. servers, NVR/ camera server, NAS, decoders etc. shall
be provided in standard racks.
All the cameras & control equipment shall be suitable for operation at site conditions as
specified elsewhere. This may be achieved with or without heater.
The aperture ratio (f-number) of the lenses shall be selected such that a good picture is
obtained at night with the power station and equipment lighting.
Housing of cameras meant for indoor use shall be of IP 42 rating whereas outdoor
camera housing shall be of IP 66 or better rating. These must be integrated by the
camera manufacturer. Where the environment requires, the camera and accessories
must be certified for the hazardous area i.e. explosion-proof certification as needed for
the installation location. The system shall be expandable i.e. the system shall have
facility for additional camera installation beyond the originally planned capacity.
System shall be triplex i.e. it shall provide facility of viewing, recording & replay
simultaneously.
The CCTV system shall have facility to export the desired portion of clipping (from a
desired date/time to another desired date/time) on CD or DVD. Viewing of this recording
shall be possible on standard PC using standard software like Windows media player
etc. The video surveillance application software shall support flexible 1/2/4 windows
split screen display mode or scroll mode on the PC monitor or on preview monitor as
per site requirement. The video surveillance application software shall be able to control
all cameras i.e. P/T/Z control, iris control, auto / manual focus, and color balance of
camera, selection of presets, video tour selection etc.
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

The software for employers shall also be working on a browser based system for
remote users. This will allow any authorized user to display the video of any desired
camera on the monitor with full P/T/Z and associated controls.

LOCATION OF CAMERAS
When selecting the camera positions, care shall be taken to prevent the direct sunlight
or lamps from shining into the camera lens.
The viewing angle shall be shown on the layout drawings.
Contractor shall submit detailed system schematic drawings and calculations on lenses
selection for the Employer’/Engineer’s review before fabrication and installation.

MOUNTING OF THE CAMERAS


Non-vibrating structures shall be used for mounting the camera, otherwise special
structures shall be provided. The location of the camera shall be selected such that the
camera and its supporting structure will present the least obstruction and that the risk of
accidental damage will be minimized. Housings shall be equipped with power supply,
for camera and drive, blower, heater and sunshield.
For outdoor cameras humidity conducts shall be provided.

MONITORS
Monitors shall be color LCD monitors and screen size shall be at least 24 inch with 1920
x 1200 minimal resolution. The monitors shall have facilities to loop the video signal
through to other monitors. The monitor shall remain dark if no camera is selected or if
there is no signal at the video input. The screen shall have a non-reflective surface. The
number of monitors must be chosen to suit the system.

1) MAIN CABINET
- WORKSTATION : Windows Based Digital Video Recorder for 32 channels with
3 Tera HDD, DVD R/W, and Motion Detection
- QUAD SWITCH : 16 PIECE
- CONTROL KEY BOARD : HALF DUPLEX TYPE
- VIDEO DISTRIBUTOR AMP (VDA) : 8CH
- AVR : 3KVA /220V
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

- DVR / MONITOR : 32CH / 20"


- SYSTEM RACK : 1800MM
- SIGNAL INTERFACE : CURRENT LOOP
- MONITOR with RACK & BRACKET : LCD TFT Color / "27 "
- POWER CONTROL : 8CH / RACK TYPE
- S/W for Monitoring, analysis & Storage
- DLP, Matrix Switcher and Cables
- Media Convert
- Control Keyboard
- including Cable connection kit and test
: for optical/coaxial/signal/control/power cable’s connection & splicing

2) CCD COLOR CAMERA(Indoor)


1) Indoor Fixed Dome Camera
2) Ceiling Mount type
3) 1/3 " 410,000 PIXELS / ZOOM TYPE, IP65
4) PAN / TILT / ZOOM - yp 350 DEGREES
5) Camera Control Junction Box : Wall Mount type, with F.D.F
6) FM MODULATOR - 2KM
7) CCD COLOR CAMERA POLL - 6 M / SAFETY SUPPORT
8) Including Bolt & Nut
9) including Cable connection kit and test
10) for optical/coaxial/signal/control/power cable’s connection & splicing

3) CCD COLOR CAMERA(Outdoor)


- 410,000 PIXELS / ZOOM TYPE, IP66
- MOTORIZED ZOOM LENS /C-MOUNT - SPEED DOME / ZOOM TYPE, IP65
- 1/3 " / 8 - 200MM
- CAMERA HOUSING / OUTDOOR WALL TYPE
- PAN / TILT / ZOOM - OUTDOOR TYPE / 350 DEGREES
- Camera Control Junction Box : Wall Mount type, with F.D.F
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

- FM MODULATOR - 2KM
- CCD COLOR CAMERA POLL - 6 M / SAFETY SUPPORT
- Including Bolt & Nut
- including Cable connection kit and test
: for optical/coaxial/signal/control/power cable’s connection & splicing

7.3 BARRIERS AT MAIN GATE

3.5 METER AUTO-VEHICLE BARRIER WITH LOOP DECTECTION


SELFSTANDING LONG RANGED CARD READER UP TO 2.1 M READ RANGE
SIGNAL INDICATOR (RED/GREEN)
MANUAL SWITCH FOR VEHICLE & PEDESTRIAN BARRIER
FULL-HEIGHT TURNSTILE WITH SHORT RANGED CARD READERS
ACU CONTROLLER WITH PSU, BACK-UP BATTERY

8. Fire Detection and Alarm System


The whole plant shall be furnished with an automatic fire detection system, divided
into individual alarm sections, including of Local Fire alarm control panels for each
section connected to the Main Fire Alarm Control Panel. The purpose of the fire
alarm system is to guarantee a reliable and fault-free early-warning system in the
event of fire by means of automatically activated detectors or manual call points,
so that orders for extinguishing the fire can be issued from a central point. If the
alarm is triggered by one of the installed automatic fire detectors, the alarm shall
be indicated first in the control room and on the CCR fire control panel and with
delay at the control center of the fire brigades. The delay time can be used by the
control room personnel to ascertain the cause of the alarm or to reset it in case of
a faulty activation.
The fire alarm system shall be designed in accordance with the relevant
international standards and regulations especially NFPA 72 and DIN VDE 0833,
and shall conform to the latest state-of-the-art in the field of fire alarm system
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

engineering.
The fire detection system shall be connected to an operator station at the CCR
and to the repeater stations at the security / gatehouse and the fire brigade house.
Surveillance with fire detectors shall be provided for all areas of the plant. A fire
alarm shall also trigger alarm sirens and sounders.
No restrictions on the proper functioning of fire alarm by reason of movement of
air, optical radiation, smoke, dust, vibration, high humidity, etc. are acceptable.
Moreover, fire alarms shall be located in the outgoing airflows of air-conditioning
and ventilation systems.
The alarm signal receiving units must be so designed that by use of a
standardized alarm unit socket, any of the types of detector may be used with
equal facility on any of the fire alarm circuits
Detectors installed in not readily accessible points such as cable ducts, false
floors, cable basements, etc. are to be connected in parallel to external optical
alarm indicators installed close by and in readily visible positions.
Detectors installed in false floors, suspended ceilings, cable ducts, air-
conditioning or ventilation systems are also to be combined to form separate
alarm sections.
Fire detection and alarm systems shall be arranged such that two circuits are
provided, with a minimum of two detectors on each circuit. The operation of any
one detector on either circuit shall initiate local "level l" audible and visual alarms
of fire repeated at the central control room. The operation of two detectors on
different circuits shall initiate "level 2" alarms of fire and the following actions:
 Shut-down of ventilation systems and operation of fire dampers to seal
openings
 Release of fire extinguisher within the enclosure.
The detectors shall be of the addressable type.
Gas detection is required for chlorination building and hydrogen building.
The term multisensory is defined among others in NFPA 72.

Turbine hall area


The turbine hall area shall be provided with manual and automatic fire detection
and alarm system utilizing manual call points and combined smoke/heat detectors.
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

The system in the turbine hall shall be suitably arranged to cover all lubrication
and control oil areas – e.g. oil room, oil channels, main stop valves and turbine
bearings and shall be provided with automatic fire detection and alarm system
utilizing flame and heat detectors and automatic fixed fire extinguishing system
with alternative manual operation.

8.1 MAIN FIRE ALARM CONTROL PANEL

Central fire alarm station


The fire alarm central station must be housed in sheet-steel enclosed cabinets and
located in the central control room or nearby in an appropriate location. Both optical and
audible signals must be given when a fire alarm or fault alarm occurs.
Power supply for the fire alarm system shall comply with the requirements of NFPA 72
and shall be taken from the safe AC busbar. Emergency supply shall be maintained by
a rectifier / battery set (1 x 100%), designed for a four (4) hour discharge time.
The fire alarm central station is to be implemented in all-digital / numerical electronic
technology using plug-in units and assemblies on the modular construction principle,
and shall be accommodated in metalclad enclosed panels with type IP 31 enclosure for
wallmounted / free standing installation.
The fire alarm and fault annunciation system shall be designed with optical and audible
alarms. Whereas the audible alarm must be resettable, the optical indication shall
persist until the annunciation is finally extinguished or the fault cleared. If a fault warning
is followed by a fire alarm annunciation, the fault indication must be stored and
suppressed until the fire alarm condition has been cancelled.
Provision shall be made for clear audible identification of the alarm / fault signal.
Furthermore, fire alarm signals and fault signals shall be strictly segregated.
Provisions shall be made to have an “all clear” dedicated audio siren alarm that will
indicate that the fire or other threatening event is suppressed, cleared, maintained or
negated and that is now safe to resume normal movement / work around the plant other
than those assigned to post event stabilization, repairing, clearing, cleaning, etc.
An automatic fire alarm signal shall be triggered and transmitted externally to the central
control room, gate house and the local fire brigade via a main alarm unit, inclusive of the
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

digital communicator. The alarm lines to the fire brigade shall be continuously
monitored.

The individual fire alarm lines and function lines of the fire-fighting equipment and
facilities, as well as important functional groups of the fire alarm central station (FACS)
shall be continuously monitored for faults and breakdowns e.g. for:
 Wire breakage of each alarm line.
 Short-circuit of each alarm line.
 Earth fault of the fire alarm system.
 Power supply system faulty.
 Main fuses and MCB's failure.
 Alarm modules disconnected from plug-in frame.
All fault signals shall be optically and audibly indicated.
For checking out the functioning of the complete fire alarm system including the fire
alarm lines and fire alarm devices, testing facilities shall be provided. When testing a
circuit, initiation of fire alarm warnings in external facilities shall be prevented. After
testing, the tested circuit shall automatically reset to normal operation.
Simulation (e.g. test pins) of all relevant fault signals as listed above as well as of all fire
alarms shall be possible in order to check-out the externally connected firefighting
facilities.
The fire alarm central station shall be provided with potential-free change-over contacts
wired to a central terminal board as follows:
 Contacts to control the fire protection doors.
 Contacts to control the air-conditioning and ventilation equipment.
 Contacts for spare.
Activation of fire protection doors shall be signaled as a group annunciation to the fire
alarm central station and included in the alarm annunciation system.
For recording all fire alarm and fault annunciations, control instructions and operator
actions, a line printer shall be provided with the facilities for printing out the alarm line
number, date and time of day in hours and minutes.

Layout display board


Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

For indicating fire alarm and fault annunciations from the fire alarm system, a layout
display board has to be provided in the panel in the central control room. This board
shall include a graphic display to show a simplified ground plan of the power plant and
of the individual buildings and shall feature signal lamps for the separate optical
indication of the alarm line, and shall include the annunciator with alarm test, reset and
acknowledge buttons. Preferably a separate monitor with appropriate graphics etc. shall
be installed. Additionally the gate house and fire brigade house shall be equipped with a
display board.
For information and guidance of fire brigade a simplified graphic display board shall be
installed in the power plant gate house and in the fire brigade house.

- Addressable fire detection and alarm system


- R TYPE (for 400 detectors, manual operated alarm, sirens, beacons)
- Enclosures (more than IP54)
- Power Supplier (Normal Power & Battery backup 4hours)
- Main Controller
- Alarm initiating device circuits (IDC)
- Signaling line circuits (SLC),
- Notification appliance circuits (NAC)
- Modules for input and output for detection & alarm and releasing & abort for
FM200 with isolation module where required.
- Network modules for TCP/IP communications
- Mimic panel for fire alarm Display & Control
- Visual annunciation
- Interlock with HVAC or cooling tower fans related to FM200.
(HVAC : Heating, Ventilation and Air-Conditioning)
- Audible alarm and Silence the supervisory alarm
- Monitoring alarm and trouble signals from the fire pump controllers.
- Electrical supervision of fire detection circuits, electric release devices, level
switches for fire water tank, alarm devices, etc.
- Testing devices of luminous indicators and acoustic signs.
- Battery : Autonomy - 24h under supervision, 15min under alarming, Sealed
Type
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

- Illustrative panel/scheme indicating the location of manual call points or


detectors.
- Communication interface to integrate with fire systems of other building / plant
or integrate to the fire brigade through MES network (TCP/IP, Bidirectional
communication).
- Interface with Public Address System / Auto-paging system to announce
evacuation in case of fire.
- Interface with FM200 system to control releasing or aborting the gas and
alarming.

8.2 LOCAL FIRE ALARM CONTROL PANEL


- R TYPE 10C
- LOCAL FIRE ALARM CONTROL PANEL
- Addressable

8.3 LOCAL FIRE SUPPRESSION SYSTEM PANEL


- LOCAL FIRE Suppression CONTROL PANEL
- Addressable

8.4 Automatic Fire Detector

The fire detector system elements and the associated mountings are to be provided with
sturdy, corrosion-proof plastic housings.
The fire alarm detectors are to be provided with optical means for signaling their
activation(e.g. light-emitting diode), and are to be suitable for the connection of an
additional optical external alarm indication.
In the central control room the necessary automatic fire detectors are to be incorporated
in the luminous ceiling.
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

Detectors belonging to a particular alarm section are to be incorporated in alarm lines,


the automatic and manual fire alarms being connected via separate alarm lines to the
common fire alarm central station in the central control room.
The fire alarm detectors shall automatically reset ready for operation following each
alarm, without outside intervention, and shall plug-in and be provided with suitable
means to prevent unauthorized removal or disconnection and for connection to the fire
alarm central station.

Smoke detector
For early identification of visible smoke generation, shall consist of photoelectric unit,
alarm electronics, optical alarm indication and detector socket. Smoke detectors referred
to in this Specification shall be of multisensor type and shall be incorporated into a probe
sampling system.
Smoke detectors referred to in thus Specification shall be of optical beam type.

Flame detector
For early identification of fire outbreaks and open flames consisting of: optical unit, alarm
electronics, optical alarm indication, detector socket and variable response sensitivity.
Flame detectors referred to, in this Specification, shall be of the UV or black body
immune solar-blind IR types.

Thermo-differential and thermo-maximum detector


For early identification of fires as they break out with rapid temperature rise and little
smoke generation, consisting of temperature sensor, alarm electronics, detector socket.
In case fixed temperature point type, the fixed temperature limit shall be 28 °C above
maximum ambient temperatures.
heat detectors referred to in thus Specification shall be of optical beam type.

1) Type : Addressable detectors, Ceiling Mounting/Void Type


2) Components
-. Detectors : Smoke Detector (Photoelectric, Ceiling Mounting/Void)
Heat detector (Fixed temperature or Rate of rise or Rate compensation),
Flame Detector
-. Base for detectors.
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

-. Isolation base for detectors if required.


-. I/O Module to communicate
-. Status LED
-. Supervision of status
-. Outdoor / Weather Proof type
-. Including accessories

8.5 Manual Call Point

Manual call points shall be of the break-glass type and shall be established in the whole
power plant at emergency exits, accesses to staircases, doorways, exits on recognized
access or escape routes and at hose reel stations.
They shall be painted red, with an interlocking mechanism to be reset by key.
If the push button of a manual call point were to be pressed, an alarm shall be released
and indicated immediately on the panel of the fire brigade control center and on the fire
control stations in the control room of the plant and the gate house.

- Type : Addressable
- Break-glass type
- Box for Manual Call Point
- I/O Module to communicate
- Supervision of status
- Outdoor / Weather Proof type
- Outdoor type
- Accessories

8.6 Horn & Strobe

Sirens and optical alarms


The personnel shall be alarmed and warned with acoustic and as far as necessary, e.g.
in case of a high background noise level with optical devices. Sirens for indoor and
outdoor installation must be provided for warning the operating personnel and all other /
incidental personnel within the power plant confines The protection degree of the sirens
for indoor and outdoor installation must be at least IP 54.
The outdoor sirens are to be arranged on the boiler area, transformer area, tank farm etc.
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

The arrangement of the indoor sirens must meet the requirements at site for satisfactory
warning of the operating personnel, e.g. mounting in the turbine hall, pipe ducts etc. The
control of the sirens shall be performed automatically by the fire alarm system, but
manual operation from the central control room must also be possible.

- Type : Addressable
-. Multi-Tone
-. I/O Module to communicate
-. Supervision of status
-. Outdoor / Weather Proof type
- Accessories

8.7 Remote LED Indicator


- Usage : this indicator is installed to inform the activity of a detector which is hided inside
a tax.
- Type : Addressable
- Outdoor / Weather Proof type
- Accessories

8.8 Manual Release Push Button


- Type : Addressable
- Outdoor / Weather Proof type
- Accessories

8.9 Exit Sign


- Outdoor / Weather Proof type
- Mounting Type
- Battery : 6V / 4Ah
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

9. EQUIPMENT

9.1 Transformer

1) TRANSFORMER
Type : OIL TYPE, Outdoor, Dyn11
Voltage : Primary 33kV , Secondary 11kV
Frequency : 50Hz
Wiring : 3ph, 3W
Tap : NLTC, ±2 x 2.5%
Capacity : 20MVA
Cooling : Oil Natural Air Forced
%Z : 10%
Protection : IP54
Note)
- Including Oil supply and filling to transformer by subcontractor
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection

2) TRANSFORMER
Type : OIL TYPE, Outdoor, Dyn11
Voltage : Primary 33kV , Secondary 0.415-0.24kV
Frequency : 50Hz
Wiring : 3ph, 3W(for Primary) / 4W(for Secondary)
Tap : NLTC, ±2 x 2.5%
Capacity : 0.5~3MVA
Cooling : Air Natural
%Z : 6~8%
Protection : IP54
Note)
- Including Oil supply and filling to transformer by subcontractor
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection
- Transformer Primary voltage can be changed from 33kV to 11kV if Contractor
requests at the engineering stage.

3) TRANSFORMER
Type : Mold TYPE, Outdoor, Dyn11
Voltage : Primary 11kV , Secondary 0.415-0.24kV
Frequency : 50Hz
Wiring : 3ph, 3W(for Primary) / 4W(for Secondary)
Tap : NLTC, ±2 x 2.5%
Capacity : 0.5~3MVA
Cooling : Air Natural
%Z : 6~8%
Protection : IP54
Note)
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection

9.2 Power Supply Panel

1) 33kV Switchgear
Type : VCB, Outdoor, Drawout
Voltage : 38kV
Wiring : 3ph, 3W
Frequency : 50Hz
Capacity : 1250A, 25kA(for Rupturing)
Protection : IP54
Components : LA, LDS/DS, GPT/PT, CT, Power Fuse, LBS and Meter(kWatt-
Hour, Ampere, Voltage, Watt/Var, Power Factor), Digital
Protection Relay(including Over Current/Ground, Over Voltage,
Under Voltage, Directional Over Current/Ground, Ratio
Differential Current Relay, etc
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

Note)
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection
- LDS/DS and Power Fuse will be installed at the incoming Concrete Pole
which is outside of Panel.

2) 11kV Switchgear
Type : VCB, Outdoor, Drawout
Voltage : 12kV
Wiring : 3ph, 3W
Frequency : 50Hz
Capacity : 1250A, 31.5kA(for Rupturing)
Protection : IP54
Components : LA, LDS/DS, GPT/PT, CT, Power Fuse, LBS and Meter(kWatt-
Hour, Ampere, Voltage, Watt/Var, Power Factor), Digital
Protection Relay(including Over Current/Ground, Over Voltage,
Under Voltage, Directional Over Current/Ground, Ratio
Differential Current Relay, etc
Note)
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection
- LDS/DS and Power Fuse will be installed at the incoming Concrete Pole
which is outside of Panel.

3) 415V SWITCHGEAR
Type : ACB, Outdoor, Drawout
Voltage : 600V
Wiring : 3ph, 4W
Frequency : 50Hz
Capacity : 800~6300A, 65kA(for Rupturing)
Protection : IP54
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

Components : Digital Protection Relay(including Over Current/Ground, Over


Voltage, Under Voltage, Directional Over Current/Ground, Ratio
Differential Current relay, etc), Digital Electronic Meter with class
of 0.2(Ampere, Voltage, Watt/Var, Power Factor)
Note)
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection

4) 415V MCCB Distribution Panel


Type : MCCB, Outdoor
Voltage : 600V
Wiring : 3ph, 4W
Frequency : 50Hz
Capacity : 630A, 65kA(for Rupturing)
Protection : IP54
Components : MCCB(Mold Cased Circuit Breaker)
and ‘kWH’ Meter for each MCCB feeder
Note)
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection

5) 415V MCC(Motor Control Center)


Type : Outdoor, Drawout
Voltage : 600V
Wiring : 3ph, 4W
Frequency : 50Hz
Capacity : 630A, 65kA(for Rupturing)
Protection : IP54
Components : Incoming(ACB or MCCB), Motor Control Unit(MCCB, Magnetic
Contactor, EOCR(Electronic Over Current Relay), Auxiliary
Transformer, etc
Note)
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection

6) PFI Panel
Type : Outdoor
Voltage : 600V
Frequency : 50Hz
Power Factor fulfillment of improvement : more than 95%
Capacity : according to Transformer Capacity and load condition
Protection : IP54
Components : Capacitor Bank for Automatic Power Factor control
, Power Factor/Voltage/Ampere Meter, etc
Note)
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection.

7) 110V DC Battery & Battery Charger


Type : Lead or Alkali Battery
Voltage : 600V
Frequency : 50Hz
Protection : IP54
Backup time : 30[minute]

Note)
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection.

8) Local Distribution Panel


Type : Outdoor
Voltage : 0.415-0.24kV
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

Wiring : 3ph, 4W
Frequency : 50Hz
Protection : IP54
Components : 400A(Main, MCCB), 225A x 3EA(3ph,ELB), 100A x
3EA(3ph,ELB), 40A x 4(1ph, ELB, Socket Outlet),
Ampere/Voltage meter, etc
Note)
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection.

9) Repair Panel
Type : Outdoor
Voltage : 0.415-0.24kV
Wiring : 3ph, 4W
Frequency : 50Hz
Protection : IP54
Components : 400A(Main, MCCB), 225A x 3EA(3ph,ELB), 125A x
2EA(415V,3ph,ELB, Socket Outlet), 63A x 3(415V, 3ph, ELB,
Socket Outlet), 16A x 3(240V, 3ph, ELB, Socket Outlet),
Ampere/Voltage meter, etc
Note for Panel)
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection.
Note for Socket Outlet)
- 3P(Single-phase+E) or 5P(Three phase+Neutral+E), with male & female
connector, with spring-return flap cover
- including ELB Box(for load disconnector switch and residual current
protection device rated at 30 mA).
- The plug and socket shall be interlocked such that the unit cannot be
switched on until the matching plug is fully inserted, nor can the plug be
withdrawn with the switch closed.
- Facility for incoming supply cable looping, and Provision for padlocking the
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

switch in the off position.

10) EMERGENCY DIESEL GENERATOR


- Engine:
No. Of. Phase : 3-Phase
Fuel : Diesel
Engine Speed RPM : 1500rpm
- Alternator:
Frequency : 50Hz
No. Of. Phase : 3-phase, 4 wire
Rated Voltage : 415/240V
Voltage regulation : within +/-1.5%
Excitation : Self exciting, Brushless (with AVR-Auto Voltage Reguator)
- ATS(Auto Transferring System) Panel : including Voltage Stabilizer

11) Manual Transfer Switch Panel


Type : Outdoor, installed on Substation(Township)
Voltage : 600V
Wiring : 3ph, 4W
Switching : 3 position(1st Power / Middle(No power) / 2nd Power)
Capacity : 6300A
Protection : IP54
Including Manual Switch handle

.
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

10. Temporary Power Supply and others

10.1 Transformer

Type : OIL TYPE, Outdoor, Dyn11


Voltage : 33/0.415-0.24kV
Frequency : 50Hz
Wiring : 3ph, 3W(for Primary) / 4W(for Secondary)
Tap : NLTC, ±2 x 2.5%
Cooling : Air Natural
%Z : 6~8%
Protection : IP55

Note)
- Including Oil supply and filling to transformer by subcontractor
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection.
- Cooling type can be changed to ONAF(Oil Natural Air Forced) if it is approved
by the Contractor.
- Including COS(Cut Out Switch)

10.2 132/33kV Tariff Metering Work

'Tariff BREB metering Work


Equipment's supply and installation for CT,PT,Cabling,etc including removal of
existing one at Substation.

10.3 33kV Switchgear


Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

Type : VCB, Outdoor, Drawout


Voltage : 38kV
Wiring : 3ph, 3W
Frequency : 50Hz
Capacity : 1200A, 25kA(for Rupturing)
Protection : IP55
Components : LA, LDS/DS, GPT/PT, CT, Power Fuse, LBS and Digital
Meter(kWatt-Hour, Ampere, Voltage, Watt, Var, Power Factor),
Digital Protection Relay(including Over Current/Ground, Over
Voltage, Under Voltage, Directional Over Current/Ground, Ratio
Differential Current Relay, etc
Note)
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection
- LDS/DS and Power Fuse will be installed at the incoming Concrete Pole
which is outside of Panel.
- 33kV receiving end of the substation shall include a drop-off fuse isolator or
ACR with isolating arrangement.

10.4 415V ACB SWITCHGEAR & MCCB Distribution

1) 415V ACB SWITCHGEAR

Type : ACB, Outdoor, Drawout


Voltage : 600V
Wiring : 3ph, 4W
Frequency : 50Hz
Capacity : 6300A, 65kA(for Rupturing)
Protection : IP55
Components : Digital Protection Relay(including Over Current/Ground, Over
Voltage, Under Voltage, Directional Over Current/Ground, Ratio
Differential Current Relay, etc), Digital Electronic Meter with
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

class of 0.2(Ampere, Voltage, Watt, Var, Watt-Hour, Power


Factor)

Note)
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection.

2) 415V MCCB Distribution Panel

Type : MCCB, Outdoor


Voltage : 600V
Wiring : 3ph, 4W
Frequency : 50Hz
Capacity : 630A, 65kA(for Rupturing)
Protection : IP55
Components : MCCBs
with Digital ‘Watt-Hour’ Meter for all MCCB feeders
( One Digital ‘Watt-Hour’ Meter for one MCCB feeder)
Note)
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection.

3) PFI Panel
Type : Outdoor
Voltage : 600V
Frequency : 50Hz
Automatic Power Factor Control : more than 95%
Protection : IP55
Components : Capacitor Bank and Power Factor control set
, Power Factor/Voltage/Ampere Meter, etc
Note)
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection.
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

4) 110V DC Battery & Battery Charger


Type : Lead or Alkali Battery
Voltage : 600V
Frequency : 50Hz
Capacity : 20[AH]
Protection : IP55
Backup time : 30[minute]
Components : Capacitor Bank for Automatic Power Factor control
, Power Factor/Voltage/Ampere Meter, etc
Note)
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection.

5) Local Distribution Panel


Type : Outdoor
Voltage : 0.415-0.24kV
Wiring : 3ph, 4W
Frequency : 50Hz
Protection : IP55
Components
Type1 : 1200A(Main, MCCB), 800A x 2EA(3ph,ELB), 630A x
2EA(3ph,ELB), 40A x 4(1ph, ELB, with concent on ),
Ampere/Voltage/Watt-Hour meter, etc
Type2 : 800A(Main, MCCB), 630A x 2EA(3ph,ELB), 400A x
2EA(3ph,ELB), 40A x 4(1ph, ELB, with concent on ),
Ampere/Voltage/Watt-Hour meter, etc
Type3 : 630A(Main, MCCB), 400A x 2EA(3ph,ELB), 225A x
2EA(3ph,ELB), 40A x 4(1ph, ELB, with concent on ),
Ampere/Voltage/Watt-Hour meter, etc
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

Type4 : 400A(Main, MCCB), 225A x 3EA(3ph,ELB), 100A x


3EA(3ph,ELB), 40A x 4(1ph, ELB, with concent on ),
Ampere/Voltage/Watt-Hour meter, etc
Type5 : 300A(Main, MCCB), 225A x 2EA(3ph,ELB), 100A x
2EA(3ph,ELB), 40A x 4(1ph, ELB, with concent on ),
Ampere/Voltage/Watt-Hour meter, etc
Type6 : 200A(Main, MCCB), 100A x 3EA(3ph,ELB), 40A x 4(1ph, ELB,
with concent on ), Ampere/Voltage/Watt-Hour meter, etc
Note)
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection.

6) Lighting Distribution Panel


Type : Outdoor
Voltage : 0.415-0.24kV
Wiring : 3ph, 4W
Frequency : 50Hz
Protection : IP55
Components : 150A(Main, MCCB), 50A x 6EA(3ph, MCCB), 20A x 30EA(1ph,
ELB), etc
Note)
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection.

7) Lighting Fixture for Road, Substation, etc


Type : LED, Outdoor
Voltage : 240V
Capacity : 200W
Wiring : 1ph, 2W
Frequency : 50Hz
Protection : IP65
Components : Lighting fixture with Lamp, Bracket/Steel Band, Bolt/nuts for
installation,, etc
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

10.5 RCP(Reinforced Concrete Pole)

1) RCP(Reinforced Concrete Pole) with electrical set

Pole Type : Reinforced Concrete Pole which contain rebars


Length : 14m or 16m
Components : ready-made concrete base, grounding, insulators including pin /
clamp/ tie, Cross arm including bands/ Racks/ Hexagon head
bolts and nuts, Overhead earth wire including supporter/
connector, guy wire including insulator/ band/ grip/ cover/ rod/
protection cover, Step Bolt, U-Bolt, Pole numbering Insignia,
Bolt/Nut totally, Shackles, Sleeves, Tapes, Insulation covers, etc.
Note)
- Instead of RCP, the wooden pole can be used if it is approved by Contractor.

2) RCP(Reinforced Concrete Pole) only

Pole Type : Reinforced Concrete Pole which contain rebars


Length : 14m or 16m
Components : guy wire and it's accessories, etc.
Note)
- Instead of RCP, the wooden pole can be used in case that it is approved by
Contractor.

10.6 Wire

1) ACSR 160mm2

Type : ACSR Outdoor wire


Size : 160mm2
Note)
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

- Including connection kits for each pole and panel of both ending points,
- Maker : BRB or equivalent

2) ACSR 60mm2

Type : ACSR Outdoor wire


Size : 60mm2
Note)
- Including connection kits for each pole and panel of both ending points,
- Maker : BRB or equivalent

3) Grounding work for Substation

Type : Mesh & Rod grounding


Components : Bare Copper Wire(185mm2), Grounding Rod(2400mm)
Sleeve/clamp, Grounding Box, GV Wire, etc
Note)
- Grounding Resistance should be less than 0.5[Ω].
- Maker : BRB or equivalent

4) Grounding work for others

Type : Rod grounding


Components : Grounding Rod(2400mm), 0.6/1kV GV Wire, connector, etc
Note)
- Grounding Resistance should be less than 0.5[Ω].
- Grounding work for RCP is included in ‘1.5.1 RCP(Reinforced Concrete Pole)
with electrical set’
- Maker : BRB or equivalent
5) Lightning works for substation

Components : Bare Copper Wire(50mm2), Grounding Rod(2400mm)


Sleeve/clamp, Earth Test Box, GV Wire, Ioniflash Air Terminal,
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

Galvanized pole & Base pole, Lightening conductor(50mm2 in


PVC)
Note)
- Grounding Resistance should be less than 5[Ω].
- Maker : BRB or equivalent

10.7 Cable
1) 33kV POWER CABLE
- Cable Spec : Fire Resistant, Water-Proof, CU/XLPE/UNARMOURED/PVC
Including Termination kit(Terminal lug, insulation tube, etc)
Note) Insulation and hi-pot test are included in bidder scope.

2) 0.6/1kV POWER CABLE


- Cable Spec : Fire Resistant, Water-Proof, CU / XLPE / UNARMOURED
Including Terminal lug, insulation tube, etc
Note) Insulation and hi-pot test are included in bidder scope.

10.8 ELP/ PVC

: Corrugated hard polyethylene pipe, Including coupling/end cap. It also include


separate support for conduit when it is installed to be exposed. General
PVC(including fittings) can be supplied and installed according to site condition or
Contractor’s request.

10.9 Civil Foundation


1) Civil work for RCP(Reinforced Concrete Pole)
: Concrete Base foundation which is enough to make the Reinforced Concrete
Pole resistible in a strong wind.

2) Civil foundation for Substation


: Reinforced Concrete PAD for Transformer & Panels Including Concrete Base with
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

Trench Work. Ending area of Base Foundation's distance must to be more than
2m for the fence.

10.10 Fence & Roof

1) Fence & Roof work for Substation


: GI Material, 2m(Height), with Door

10.11 Accessory work


1) Steel Cover for trench of substation
: 1000mmL x 550mmW x 3mmt

2) Cable Ladder(Tray) for Cable of substation


: 300mmW x 100mmH, Hot-Dip Gavanized Steel with fixing material(Anchor bolt,
plate, channel, etc)

3) Protection Cover for Cable from RCC pole to substation


: Steel or Plastic materials, minimum 3m from earth to Reinfored Concrete Pole.

4) Rubber Pad for Transformer of substation


: Rubber Pad(6mm) below the base of transformer.

5) Warning Tape to protect the embedded conduit/cable


: 300mm below the Ground Level

6) Warning Sign Sheet for ACSR wire


: Plastic plate hanging on the ACSR wire to prevent collision with machines

7) Warning Sign Sheet for Reinforced Concrete Pole


: Bright Reflexion Board' Installed on the outer wall of Reinforced Concrete Pole
which prevent collision with car/machine
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

8) Temporary fence for working area


: plastic pole and wire which is available to prevent a approach of person to the
working area

11. Common / Others


11.1 STEEL FABRICATION & ERECTION
1) Steel Plate / Channel / Angle / Pipe / etc : STS304, 2t~12t, Hot Dip
Galvanized
2) Including Zinc liquid for touch-up at site
3) Including Bolt/Nut with Washer, etc for installation/fixing

11.2 Drawings
: Detail Shop drawing for installation, Sing line Diagram, Three line Diagram,
Circuit Diagram, Layout Drawing, etc

11.3 Miscellaneous Cost


: Electrical or Firefighting Licensing Board Approval Fee, Application Fee, Deposit
Charge, Metering Charge, Miscellaneous Charge for Connection Approval, etc.

11.4 Excavation
: Excavation on the earth for embedded piping, manhole, earthing wire work,
foundation works, etc including backfill & handling remained soil
But, Q’ty counting is applied only for excavation.

11.5 Core Drill


: Core drilling work to make a hole on the concrete slab or wall.

11.6 Manhole
: concrete manhole including rebar, steel cover

11.7 Chemical Anchor Bolt


- Anchor rod : Hot Dip Galvanized, with external hexagon
- Chemical Capsule : Glass tube filled with resin, hardener and filter-material
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification

11.8 Painting
Including Power-tool, Epoxy primer, H B Epoxy Mastic Spray/Brush

11.9 Control / Instrumentation


1) Control Panel : PLC, DCS, UPS, Operation Desk, Operation Panel, etc
2) Instrument : Transmitter for Flow/Level/Pressure/Temperature/etc
3) Tube : 1/2”(or1/4”) O.D x 0.035” W/T SEAMLESS, ASTM A-269 STS304
including tube accessories such as male connector, union tee, ball valve, etc

11.10 Portable Isolating Transformer


1) portable safety transformers for hand lamps and small tools
2) with 30 m extension cable
3) transformation ratio shall be 240 VAC / 24 VAC, single-phase and the rated
output 500 VA

11.11 Fire Stop

1) FIREPROOF SEAL
2) SILICA BOARD : 300W X 610L X 30T or others
3) ROCK WOOL : 120 X 100 or others

11.12 ASS (Automatic Section Switch)

Type : Outdoor, installed on Electric Pole


Voltage : 38kV
Wiring : 3ph, 3W
Frequency : 50Hz
Capacity : 1200A, 25kA
Rupturing Current suppressing time : 0.5 / 1 sec
Protection : IP54
Including Manual Switch, Control Panel with indicator