You are on page 1of 38

Lesson 11: Job Costing

Lesson Objectives
On completion of this lesson, you will be able to

Enable and capture job costing details in Tally.ERP 9


Record the consumption of materials for each job
Generate the report for jobs carried out in multiple godowns
Compare and analyse jobs done

Job Costing applies to specific jobs undertaken according to customer requirements and specifi-
cations. Tally.ERP 9 enables the tracking of cost and revenue information down to the smallest
detail.
In order to determine the actual costs incurred, every job is assigned a job number or a job name.
Job costing systems determine the costs separately for each product or service, based on the
jobs undertaken.
In a typical job costing environment:
Many non-standard (customised) products/ service are produced/ rendered.
Orders are executed based on customer requirements.
Cost records are maintained for each distinct job.
Costs are traced or allocated to jobs.

The advantages of Job Costing are as follows.


Costs can be alloted to each element while the job is in progress.
On the completion of a job, each element of cost, selling price and profit can be compared
with estimates made earlier and other similar jobs.
Suitable methods can be used to determine the price on a cost plus contract basis.

283
Job Costing

11.1 Configuring Job Costing In Tally.ERP 9


Let us consider Computer Associates to understand the Job Costing feature of Tally.ERP 9.
Computer Associates supplies computers configured as per customer requirements and
upgrades old computers.

11.1.1 Company Setup


Create a company called Computer Associates as shown below :
The completed Company Creation screen appears as shown below:

Figure 11.1 Company Creation screen

Press Y or Enter to accept the company creation screen.

Computer Associates received two orders from SimplyC Solutions to upgrade existing
systems and deliver new systems.
The order details are given in the table.
S.No Order Description Terms of Contract Amount
1. Servicing and Upgrading of Lump sum contract, inclusive of 3,75,000
existing machines. replacement of parts
2. Installing new systems as Rate contract based on requirement 20,000
per specifications of systems

284
Job Costing

Other Details
The company has given the servicing and upgrading job collectively to Raj and Archana.
The Service Charges amounts to Rs. 62,500 and Travel Expenses for visits made onsite
are Rs. 25,000
The company has given the job of installing new systems job to Rajesh
Service Charge Rs. 62,500 and Travel Expenses for visits made onsite-Rs. 25,000
The company has a stores godown and regularly purchases items from Reliable Comput-
ers.

11.1.2 Enabling Job Costing in Tally.ERP 9


In the F11: Features (Accounting Features),
Set Maintain Cost Centres to Yes.
Set Use Cost Centre for Job Costing to Yes.

The Accounting Features screen appears as shown below:

Figure 11.2 Accounting Features screen

Press F2: Inventory Features and


Set Maintain Multiple Godowns to Yes.

285
Job Costing

Set Track Additional Costs of Purchase to Yes.


Set Use Tracking Numbers to Yes.

The Inventory Features screen appears as shown below:

Figure 11.3 Inventory Features screen

Press Y or Enter to accept the Inventory Features screen.

11.2 Creating Masters for Job Costing


The masters required for Job costing are as follows:
Cost centres used for job costing.
Sales or direct income accounts related to job revenue.
Direct and Indirect expenses related to job costs.
Suppliers, vendors and other party account.
Godowns dedicated to specific jobs necessary to assess stock consumption.
Stock items.
Voucher types and classes for stock transfer, consumption.

286
Job Costing

11.2.1 Creating Jobs as Job Cost Centres


Each job is identified with a name or number and this is used while creating the cost centre for the
job. Create Upgrading Job as a Job Cost Centre under Primary.
Go to Gateway of Tally > Accounts Info. > Cost Centres > Single Cost Centre > Create
1. Name: Upgrading Job
2. (alias): Skip field
3. Under: Select Primary from List of Cost Centres
4. Use for Job Costing: Yes
The completed Cost Centre Creation screen appears as shown below:

Figure 11.4 Cost Centre Creation – Upgrading Job

5. Press Y or Enter to accept the screen


Similarly, create the following Cost Centres
Name Alias Under Use for
Job Costing
New Systems Job Skip Field Primary Yes
Retail Trade Skip Field Primary No

The Parallel allocation of cost to regular cost centres takes place when
more than one cost category is enabled.

11.2.2 Creating Ledgers


Create the following ledger,
Name Under Inventory Cost Centres
values are are applicable
affected
Purchase Purchase Accounts Yes Yes

287
Job Costing

The completed ledger creation screen appears as shown below:

Figure 11.5 Ledger Creation – Purchases

Press Y or Enter to accept the screen.


Similarly, create the following ledgers:
Name Under Maintain Inventory Cost Centres
balances values are are applicable
bill-by-bill affected
Sales Sales Accounts — Yes Yes
Service Charges Direct Expenses — No Yes
Travel Expenses Indirect Expenses — No Yes
Reliable Computers Sundry Creditors Yes No No

Create a Capital Account under the Capital Account group and enter
Rs.10,00,000 as the Opening Balance for the Capital and alter the Cash
account to a opening balance of Rs. 10,00,000.

288
Job Costing

11.2.3 Creating Godowns dedicated to jobs


Godowns are geographical locations or persons responsible for stock handling. Whereas,
Dedicated Godowns are created to keep track of stocks transferred, consumed and manufactured
for each job.

In this lesson, godowns have been created in the names of persons respon-
sible for stock handling.

Create a Dedicated Godown allotted to holding stocks for a default job and a normal Godown,
used regularly and not assigned to any particular job.

Create Stores godown


Go to Gateway of Tally > Inventory Info. > Godowns > Create
1. Name: Stores
2. (alias): Skip field
3. Under: Primary
4. Allow Storage of materials: Yes
5. Set Job/Project Name for Job Costing: Not Applicable

Figure 11.6 Godown Creation – Stores

6. Press Enter twice to accept the screen.

Similarly, create the following Godowns with the details given below:
Godown Name Under Allow Storage Default Job Name
of materials
Raj Primary Yes Upgrading Job
Archana Primary Yes Upgrading Job
Rajesh Primary Yes New Systems Job

289
Job Costing

11.2.4 Creating Units of Measure


A Unit of Measure is created to measure the stock items. Create Units of Measure as Numbers
Go to Gateway of Tally > Inventory Info. > Units of Measure > Create
Ensure that the details are as shown in the following screen:

Figure 11.7 Unit Creation – Numbers

Press Y or Enter to accept the screen.

11.2.5 Creating Stock Item


i.Create stock item as Mother Board
Go to Gateway of Tally > Inventory Info. > Stock Items > Create
1. Name: Mother Board
2. (alias): Skip field
3. Under: Select Primary from List of Groups
4. Units: Select Nos from Units list
5. Rate of Duty: Skip Field
6. Opening Balance: Do not enter any details

The completed stock item creation screen appears as shown below :

290
Job Costing

Figure 11.8 Stock Item Creation – Mother Boards

7. Press Y or Enter to accept the screen.


ii. Similarly, create the following Stock Items.
Stock Item Under Units
Hard Disk Primary Nos
Monitor Primary Nos
CPU Primary Nos
Keyboard Primary Nos
Mouse Primary Nos

iii. Creating Stock Item with Bill of Materials


Go to Gateway of Tally > Inventory Info. > Stock Items > Create
1. Name: Computers
2. Press F12: Stock Item Configuration,
Set Allow Component list details (Bill of Materials) to Yes

The F12: Stock Item Configuration screen appears as shown below :

291
Job Costing

Figure 11.9 F12: Configuration

Accept the screen.


3. Under: Select Primary from the List of Groups
4. Units: Select Nos from the Units list
5. Set Components (BoM) to Yes
6. Rate of Duty: Skip Field
7. In the List of Components screen,
Define the Unit of Manufacture as 1
Type the name of the components and godown details as given in the following table:
Item Godown Qty
(Nos)
Monitor Rajesh 1
CPU Rajesh 1
Keyboard Rajesh 1
Mouse Rajesh 1

The Components details screen appears as shown below :

292
Job Costing

Figure 11.10 Components List

New systems jobs are despatched from the Rajesh Godown.

8. Rate of Duty: Skip Field

The completed stock item creation screen appears as shown below:

293
Job Costing

Figure 11.11 Stock Item Creation – Computers

9. Press Y or Enter to accept the screen.

11.2.6 Creating Voucher Type with Voucher Class


In Tally.ERP 9, stock journals are used for the following purposes:
To record the stages in the manufacturing process.
To record the transfer of materials between godowns.
To record the consumption of materials for Job Costing.

Create one new Voucher Type and two Voucher Classes to deal with the scenarios in a manufac-
turing as well as non-manufacturing environment.

i. Create Manufacturing Journal Voucher Type


Go to Gateway of Tally > Inventory Info. > Voucher Types > Create
1. Enter Manufacturing Journal as Name of the Voucher Type.
2. Select the Type of Voucher as Stock Journal from the list of voucher types.
3. Type the Abbr. as Mfg.
4. Select the Method of Voucher Numbering as Automatic.
5. By default Use Common narration is set to Yes.
6. Set Use as a Manufacturing Journal to Yes.

294
Job Costing

The completed Voucher Type creation screen appears as shown below:

Figure 11.12 Voucher Type Creation – Manufacturing Journal

7. Press Y or Enter to accept the screen.

ii. Create Transfer Journal Voucher Type with Voucher Class


Go to Gateway of Tally > Inventory Info. > Voucher Types > Create
1. Enter Transfer Journal as Name of the Voucher Type.
2. Select the Type of Voucher as Stock Journal from the list of voucher types.
3. Type the Abbr. as Transfer.
4. Select the Method of Voucher Numbering as Automatic.
5. By default Use Common Narration is set to Yes.
6. Set Use as a Manufacturing Journal to No.
7. Type the Name of Class as Transfer

Voucher classes are available when stock journals are not used as manu-
facturing journals. The options available are as follows:
Use class for inter Godown transfers : Create this class to record
transfer of materials from one godown to another.
Use class for Job Costing consumption : Create this class to record
the consumption of materials at godown level.

295
Job Costing

8. Press Enter and set Use Class for Inter-Godown Transfers to Yes.

Figure 11.13 Transfer Class

The completed Voucher Type Creation screen appears as shown below:

Figure 11.14 Voucher Type Creation Transfer Journal

9. Press Y or Enter to accept the screen.

iii. Create Consumption Journal Voucher Type


Go to Gateway of Tally > Inventory Info. > Voucher Types > Create
1. Enter Consumption Journal as Name of the Voucher Type.
2. Select the Type of Voucher as Stock Journal from the list of voucher types.
3. Type the Abbr. as Consumption.
4. Select the Method of Voucher Numbering as Automatic.
5. By default Use Common Narration is set to Yes.
6. Set Use as a Manufacturing Journal to No.
7. Type the Name of Class as Consumption.

296
Job Costing

8. Press Enter. Set Use Class for Inter-Godown Transfers to No and set Use Class for Job
Costing Consumption to Yes.

Figure 11.15 Consumption Class

The completed Voucher Type Creation screen appears as shown below :

Figure 11.16 Voucher Type Creation Consumption Journal

9. Press Y or Enter to accept the screen.

11.3 Recording Transactions


On the receipt of orders from SimplyC Solutions, Computer Associates planned to buy and
store the components required for the execution of jobs.

11.3.1 Creating Receipt Note


On 1-4-09, Computer Associates, placed an order with Reliable Computers for the
following items :

297
Job Costing

Name of Item Quantity Rate Value


per Unit
Mother Boards 12 3,000 36,000
Hard Disk 12 4,500 54,000
Mointors 22 7,500 1,65,000
CPU 22 2,750 60,500
Keyboard 27 725 19,575
Mouse 27 250 6,750

i. Create Receipt Note

In the F11: Inventory Features, set Yes to Use Tracking Numbers


(Delivery/Receipt Notes) and Use Rejection Inward/ Outward Notes.

Go to Gateway of Tally > Inventory Vouchers > Alt + F9 to view Receipt Note entry screen
1. Press F2 to change voucher date. Type 1-4-2009.
2. In the Party’s A/c Name select Reliable Computers from the List of Ledgers Accounts.
3. Press Enter to view the order details screen and accept the default screen.
4. In the Purchase Ledger field, select Purchases from the List of Ledger Accounts.
5. Select Mother Boards from List of Items.
6. The Item Allocation screen appears. Enter the details as shown below:
Tracking No Godowns Quantity Rate Amount
Select 1 (from List of Track- Stores 12 Nos 3,000 36,000
ing Numbers)

Tracking Numbers
Many businesses deliver stock with a delivery note or a challan and the bill
is raised later. There may be a situation where a bill is raised first and the
goods are delivered against it or the goods are received later against a pur-
chase bill.
In either case, it is important to ‘track’ the delivery or receipt of inventory
against the bill. Tally.ERP 9 provides a facility called Tracking Numbers to
achieve the same.

298
Job Costing

The completed Receipt Note appears as shown below :

Figure 11.17 Receipt Note – April 1, 2009

7. Press Y or Enter to accept the screen

11.3.2 Creating Purchase Invoice


On 2-4-09, received a purchase bill from Reliable Computers for the supply booked.

Create Purchase Invoice


Go to Gateway of Tally > Accounting Vouchers > F9: Purchase
1. Press F2 and change the date to 2-4-2009.
2. Enter the Supplier Invoice No. and Date.
3. In the Party’s A/c Name select Reliable Computers from the List of Ledgers Accounts.
4. In the Receipt Details screen, select 1 from the List of Tracking Numbers.
5. In the Purchase Ledger field select Purchases from the List of Ledgers Accounts.
6. In the Bill-Wise Details screen,
Select New Ref
Type the name as RC1
Enter the amount as Rs. 341825

299
Job Costing

The completed Purchase Invoice appears as shown below:

Figure 11.18 Purchase Invoice – April 2, 2009

If the Bill-wise Allocation screen does not appear then in F12: Configuration set
Use Defaults Bill for Allocations to No.

7. Press Y or Enter to accept the screen.

View Godown Summary


Go to Gateway of Tally > Display > Statements of Inventory > Godowns
Select Primary
Press Alt+F1 to view the Godown Summary of Stocks.

The Godown Summary appears as shown below:

300
Job Costing

Figure 11.19 Godown Summary

11.3.3 Creating Transfer Journal


Computer Associates has employed Raj and Archana. The following components have
been issued to them on 4-4-2009 for the upgrading job.

Details of Stock issued to Raj :


Name of Item Godown Quantity Rate Value
Mother Boards Stores 6 3,000 18,000
Hard Disk Stores 6 4,500 27,000

Details of Stock issued to Archana :


Name of Item Godown Quantity Rate Value
Mother Boards Stores 6 3,000 18,000
Hard Disk Stores 6 4,500 27,000

301
Job Costing

Create Transfer Journal


Go to Gateway of Tally > Inventory Vouchers > press Alt + F7
1. The Voucher Type subscreen appears as shown:

Figure 11.20 Voucher Type – Transfer Journal

2. Select Transfer Journal as Voucher Type and Class as Transfer


3. Press F2 and change the date to 4-4-2009.
4. Select Raj as the Destination Godown
5. Enter the details as shown below :

Name of Item Godown Quantity Rate Value


Mother Boards Stores 6 3,000 18,000
Hard Disk Stores 6 4,500 27,000

The completed Transfer Journal appears as shown below :

302
Job Costing

Figure 11.21 Transfer Journal – April 3, 2009

6. The Rate and Amount are automatically displayed.


7. Press Y or Enter to accept the screen.

Similarly, make an entry in a Transfer Journal, selecting Archana as the Destination Godown
and ensure that the date is 4-4-2009.

11.3.4 Creating Consumption Journal


On 5-4-2009, Raj and Archana found that 8 Systems needed a replacement of Mother
Boards and Hard Disk. The respective consumption has to be recorded as a job cost.
Name of the Item Godown Quantity Rate Value
Mother Boards Raj 4 3,000 12,000
Mother Boards Archana 4 3,000 12,000
Hard Disk Raj 4 1,000 4,000
Hard Disk Archana 4 1,000 4,000

Create Consumption Journal

303
Job Costing

Go to Gateway of Tally > Inventory Vouchers > press Alt + F7


1. Select Consumption Journal as Voucher Type
2. Select Consumption as Voucher Class
3. Press F2 to change the voucher date. Type 5-4-2009. Ensure that the screen is displayed as
shown:

Figure 11.22 Consumption Journal – April 5, 2009

4. Press Y or Enter to accept the screen.

On recording the above entry, the stock available in the godowns decrease.
This value is considered for the consumption of materials during a job work
analysis.
A Manufacturing Journal can also be used to obtain the same result, but in
this, a voucher class cannot be used and the voucher should not have any
output.

Both direct and indirect expenses can be recorded through accounting vouchers by assigning
them to job cost centres.

304
Job Costing

11.3.5 Creating Payment Voucher


On 6-4-09, Computer Associates made a cash payment of Rs. 31,250 as Service Charges
and Rs. 20,000 as Travel Expenses, collectively to Raj and Archana. The costs were
assigned to Upgrading Job.

Create Payment Voucher


Go to Gateway of Tally > Accounting Vouchers > F5: Payment

In F12 : Configuration, set Use Single Entry Mode for Pymt/Rcpt/Contra to


Yes.

1. Select Cash in the Account field.


2. Select Service Charges from List of Ledger Accounts.
3. Enter 31,250 in the Amount field
4. Press Enter to view the Cost Allocations screen
5. Select Upgrading Job from List of Cost Centres

Figure 11.23 Cost Allocations for Service Charges

6. Select Travel Expenses from List of Ledger Accounts, enter 20000 in the Amount field and
press Enter to view the Cost Allocations screen.
7. Select Upgrading Job from List of Cost Centres.
8. Press Y or Enter to accept the screen.

View Godown Summary


Go to Gateway of Tally > Display > Statement of Inventory > Godowns >

305
Job Costing

Select Primary
Press Alt+F1 to view the Godown summary in detailed format.
In the F12: Configuration, set Show All Items (incl. zero balance) to Yes.

Figure 11.24 Godown Summary

11.3.6 Creating Sales Invoice


On 6-4-2009, Raj and Archana successfully completed the upgrading job at SimplyC Solu-
tions. Computer Associates raised an invoice on 6-4-2009 for the upgrading job.
Create Sales Invoice :
Go to Gateway of Tally > Accounting Vouchers > F8: Sales

In the F12: Configuration, set Use Common Ledger A/c for Item Allocation to
No.

1. In the Party’s A/c Name select SimplyC Solutions from the List of Ledger Accounts.
2. Press Enter to view the Despatch Details screen and accept the default screen.

306
Job Costing

3. Select Sales from List of Ledger Accounts, enter 3,75,000 in the Amount field and press
Enter once to view Cost Allocations for the Sales screen.
4. Select Upgrading Job from List of Cost Centres.
5. In the Bill-Wise Details for SimplyC Solutions,
Select New Ref
Type the Name as SS-1
Enter the amount as Rs. 4,25,000
6. Press Y or Enter to accept the screen.

11.3.7 Creating Stock Journal for Returns of Materials


On 6-4-2009, Raj and Archana return the remaining components to the stores having
completed the job.

Name of the Item Godown Quantity Rate Amount


Mother Boards Raj 2 3,000 6,000
Hard Disk Raj 2 4,500 9,000
Mother Boards Archana 2 3,000 6,000
Hard Disk Archana 2 4,500 9,000

Create Stock Journal


Ensure that the Voucher Type is Transfer Journal and the Voucher Class is Transfer.
Enter the details as shown

307
Job Costing

Figure 11.25 Transfer Journal – April 6, 2009

Press Y or Enter to accept the screen.

i. The stock value remains the same, since there is no consumption involved in
the process of transfer of material. T
ii. he job work analysis will indicate a reduction of stock in the Godown from
which the transfer was made.

View Godown Summary


Go to Gateway of Tally > Display > Statements of Inventory > Godowns
Select Primary
Press Alt+F1 to view the Godown summary in detailed format.
In F12: Configuration set Show All Items (incl. zero balance) to Yes.

308
Job Costing

Figure 11.26 Godown Summary at the end of Upgrading Job

Practice Exercise
Similarly, let us record transactions for New Systems Job.
1. On 7-4-2009, the following components are issued to Rajesh from the stores. This is for the
installation of New Systems for SimplyC Solutions. The details of Stock issued to Rajesh are
given below:
Name of the Item Godown Quantity Rate Value
CPU Stores 15 2,750 41,250
Monitor Stores 15 7,500 1,12,500
Keyboard Stores 15 725 10,875
Mouse Stores 15 250 3,750

i. Make an entry of the following transaction in Stock Journal.

309
Job Costing

Ensure that the Voucher Type is a Transfer Journal and the Voucher Class is
Transfer.

Select the Destination Godown as Rajesh.


Ensure the entry is as shown in the following table:
Name of the Item Godown Quantity Rate Value
CPU Stores 15 2,750 41,250
Monitor Stores 15 7,500 1,12,500
Keyboard Stores 15 725 10,875
Mouse Stores 15 250 3,750

2. Using the above components, Rajesh produced 15 computer systems on 8-4-2009. A manu-
facturing entry was passed when the components were converted into fully assembled compu-
ter systems for the job.

Once the entry is passed:


The quantities of components get reduced from one godown while the
quantity of assembled product increases in another.
The aggregate value of the consumed components from each Godown
will be taken as the consumption value for job work analysis.
The value of the finished product (assembled computer systems) is
considered as inward.

i. Make an entry of the transaction in a Manufacturing Journal.

Go to Gateway of Tally > Inventory Vouchers > Alt + F7: Select the Voucher Type as Manu-
facturing Journal
Enter the details as shown below:

310
Job Costing

Figure 11.27 Manufacturing Stock Journal – April 8, 2009

Press Y or Enter to accept the screen.

ii. View Godown Summary


Go to Gateway of Tally > Display > Statements of Inventory > Godowns > Primary
Press Alt+F1 to view the report in detailed format.

311
Job Costing

Figure 11.28 Godown Summary after Manufacturing of Systems

3. On 8-4-2009, Computer Associates paid Rajesh Service charges of Rs. 31,250 and Travel
Expenses of Rs. 20000.

i. Make an entry of the transaction in Payment Voucher


Select Cash in the Account field.
Select Service Charges and enter the amount as Rs. 31250. Press Enter once to view
Cost Allocation for the Service Charges screen.
Select New Systems Job from List of Cost Centres and press Enter once.
Select Travel Expenses and enter the amount as Rs. 20000 and press Enter once to view
Cost Allocation for the Travel Expenses screen.
Select New Systems Job from List of Cost Centres.
Press Y or Enter to accept the screen.

312
Job Costing

4. On 8-4-2009, Rajesh delivered 15 new systems to SimplyC Solutions. The agreed price was
Rs. 20000 per system.

i. Make an entry of the following transaction in Delivery Note


Go to Gateway of Tally > Inventory Vouchers > Alt + F8: Delivery Note

In the F12: Configuration, set Use Common Ledger A/c for Item Allocation to
Yes.

In the Party’s A/c Name select SimplyC Solutions from the List of Ledger Accounts.
Press Enter to view the Order Details screen and accept the default screen.
Select Computers from List of Items and press Enter once to view the Item Allocation
screen for computers.
Select Tracking No: 1 and accept the Item Allocation screen. Ensure that the Item Alloca-
tion screen for computers is as shown:
Godown Quantity Rate Amount
Rajesh 15 Nos 20,000 3,00,000

Select Sales in the Sales Ledger field.


Press Y or Enter to Accept the Delivery Note.

5. On 8-4-2009, Computer Associates raises a sales invoice of Rs. 3,00,000 at the rate of Rs.
20,000 per system for 15 New systems delivered by Rajesh.

i. Make an entry of the transaction in a sales item invoice.

In the F12: Configuration, set Common Ledger A/c for Item Allocation to No.

In the Party’s A/c Name select SimplyC Solutions from the List of Ledger Accounts.
In the Despatch Details screen, select Delivery Note No. 1 and accept the default details.
The Item, Quantity, Rate and Amount fields are updated automatically.
Accept the default Item Allocation screen.
In the Accounting details screen select Sales from List of Ledger Accounts.

313
Job Costing

In the Cost Allocation for Sales screen, select New Systems Job.
In the Bill-Wise Details screen, select the New Ref and enter the Name as SS-2. Enter the
amount as Rs. 300000.
Press Y or Enter to accept the screen.

ii. View Godown Summary


Go to Gateway of Tally > Display > Statements of Inventory > Godowns
Select Primary
Press Alt+F1 to view the report in detailed format.

Figure 11.29 Godown Summary after completion of New Systems Job

11.4 Job Costing Reports


Job Work Analysis can be viewed for jobs resulting in deliverable products in the same way as for
jobs resulting in deliverable services. Tally.ERP 9 povides following Job work related reports to
analyse cost and revenue accumulated for any particular job at any given stage viz.,
Job Work Analysis Report
Material Consumption Summary

314
Job Costing

11.4.1 Job Work Analysis Report


Go to Gateway of Tally > Display > Statement of Accounts > Job Work Analysis
Select the Upgrading Job to view the Job Work Analysis report for Upgrading Job

The Job Work Analysis report of Upgrading Job appears as shown :

Figure 11.30 Job Work Analysis – Upgrading Job

11.4.2 Material Consumption Summary


A Material consumption summary is a report that reflects the total material consumed from a
godown alloted for a job. To arrive at the Material Consumption Summary

Go to Gateway of Tally > Display > Statement of Accounts > Job Work Analysis
Press Enter on Consumption

The Material Consumption Summary is displayed as shown below:

315
Job Costing

Figure 11.31 Material Consumption Summary

11.4.3 Godown Summary


To view Godown summary, press Enter on the required Godown

316
Job Costing

Figure 11.32 Godown Summary – Archana

The Godown Summary viewed through the menu, displays all godowns whereas
the Godown Summary viewed by drilling down from Job Work Analysis report,
displays only the godowns specific to the job.

To view Job Work Analysis report of New Systems Job, Go to Gateway of Tally > Display >
Statement of Accounts > Job Work Analysis
Select New Systems Job

The Job Work Analysis report of New Systems Job appears as shown :

317
Job Costing

Figure 11.33 Job Work Analysis – New Systems Job

Similar to the Upgrading Job, the Material Consumption Summary and the Godown
Summary can be viewed, by drilling down the report.

11.4.4 Comparative Job Work Analysis


Computer Associates would like to compare the total jobs executed by them for SimplyC Solu-
tions.
Go to Gateway of Tally > Display > Statement of Accounts > Job Work Analysis > New Sys-
tems Job >
Select New Column from the Buttons bar and select the Upgrading Job.
Select any number of jobs as required.
Press F12: Configuration and change the settings as shown below:

318
Job Costing

Figure 11.34 Configuration

Accept the Configuration screen to view the summary of Jobs performed for SimplyC
Solutions.

Figure 11.35 Summary of Jobs Performed for SimplyC Solutions

319
Job Costing

Points to Remember
Job Costing is evaluating the cost of each specific job order.
Tally.ERP 9 permits you to create a Godown / Location where you need
not store materials but treat it as a virtual godown.
Tally.ERP 9 allows a stock journal voucher type to be used as a manu-
facturing and as a non-manufacturing journal.
A Manufacturing journal voucher type is used to track the list of compo-
nents used, its value and the additional cost of manufacture associated
with each product.
A stock journal voucher type that is not used as a manufacturing jour-
nal, can be used to create voucher classes for the purpose of inter-
godown transfers and for job costing consumption records.
There are two levels of reports generated in job costing viz., Job Work
Analysis and Material Summary Report
A Godown summary displays consumption and other transfer details of
all the godowns.

320