TOTAL MATERIAL RECEIVED By YIBANG

Project M-Project

Area/Location Sub Station 4 Future Tank Area

SI.No Date Ticket No Truck No Material Net Weight / Ton

1 24/2/2019 1019105973 21266 FUJ Back Filling 73.02

2 24/2/2019 1019105974 21377 FUJ Back Filling 78.6

3 24/2/2019 1019105976 21375 FUJ Back Filling 77.12

4 25/2/2019 1019106007 21266 FUJ Back Filling 72.82

5 25/2/2019 1019106009 21377 FUJ Back Filling 72.02

6 25/2/2019 1019106010 21375 FUJ Back Filling 76.4

7 25/2/2019 1019106011 21373 FUJ Back Filling 73.02

8 27/2/2019 1019106286 21377 FUJ Back Filling 73.72

Total 596.72
TERIAL RECEIVED By YIBANG

Net Weight / Ton Date of Received

73.02 25-02-2019

78.6 25-02-2019

77.12 25-02-2019

72.82 25-02-2019

72.02 25-02-2019

76.4 25-02-2019

73.02 25-02-2019

73.72 28-02-2019

596.72