TOTAL MATERIAL RECEIVED By YIBANG

Project M-Project

Area/Location Sub Station 4 Future Tank Area

SI.No Date Ticket No Truck No Material Net Weight / Ton

1 5/3/2019 1019106771 21268 FUJ Back Filling 76.96

2 9/3/2019 1019107116 21373 FUJ Back Filling 76.28

3 9/3/2019 1019107117 21260 FUJ Back Filling 75.18

4 9/3/2019 1019107118 21268 FUJ Back Filling 74.48

5 9/3/2019 1019107119 21263 FUJ Back Filling 74.3

6 9/3/2019 1019107120 21266 FUJ Back Filling 71.72

7 10/3/2019 1019107274 21268 FUJ Back Filling 76.88

8 10/3/2019 1019107236 21376 FUJ Back Filling 73.22

9 19/3/2019 1019108087 21268 FUJ Back Filling 77.44

10 19/3/2019 1019108119 21268 FUJ Back Filling 75.08

11 19/3/2019 1019108138 21268 FUJ Back Filling 74.04

12 20/3/2019 1019108276 21268 FUJ Back Filling 74.1

Total 899.68
TERIAL RECEIVED By YIBANG

Net Weight / Ton Date of Received

76.96 5/3/2019

76.28 9/3/2019

75.18 9/3/2019

74.48 9/3/2019

74.3 9/3/2019

71.72 9/3/2019

76.88 10/4/2019

73.22 10/4/2019

77.44 19/3/2019

75.08 19/3/2019

74.04 19/3/2019

74.1 19/3/2019

899.68