Design and Building of St. Sebastian North Lock Gates and Pumping
Station
Contract No: MCUDP/SLLRDC/W/12
Feb-19 MCUDP/NLGPS/D/DOC/S/004-R2
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
2
The proposed building is a single storey building with 225m (approx.) plan area. It is composed of
ground slab, perimeter and partition walls with bricks or blocks and reinforced concrete roof slab. The
ground level in the area is planned to be raised up to +4.5m MSL and the building is therefore
supported on the filled ground. A well compacted and controlled backfill has proposed in the area.
Considering the nature of the structure which is used to install generators, a raft foundation is proposed
for the building. Ground beams are provided in the perimeter of the raft and the roof supporting
columns will be started from the ground beams.
This report presents the design of all structural components of the building.
- EN 1990 (EC0)
Basis of structural design
- EN 1991 (EC1)
Actions on structures
- EN 1992 (EC2)
Design of concrete structures
- EN 1993 (EC3)
Design of steel structures
- EN 1996 (EC6)
Design of masonry structures
- EN 1997 (EC7)
Geotechnical design
- EN 206-1:2000
Concrete - Part 1: Specification, performance, production and conformity
- EN 197-1
Cement - Part 1: Composition, specifications and conformity criteria for common cements
- Software
- PROKON 3.0
- Auto Cad 2016
- MS Excel 2013
Page 1 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
2 Design Data and Parameters
2.1 Material Properties
3
EC1-Table A.1 Density of Concrete (ϒc) = 24 kN/m
3
ERQ-VI-3-16 Density of Water (ϒw) = 10 kN/m
3
do Compacted soil density (Backfill) (ϒs) = 20 kN/m
0
FAD-Table2-6 Angle of shearing resistance for backfill material (φ k) = 30
(Type I or II soil- gravel sand mix as per ICTAD
SCA/5, Engineering classification - GW )
2.2.1 Foundation
Increasing structural class by 1 as per the recommendations given in Table 4.3N EC2
= 30 mm
SLNAEC2- Δcdev = 10 mm
Table NA.1
Nominal cover (cnom) = cmin+Δcdev
= 40 mm
Nominal cover to be provided = 50 mm
Page 2 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
2.2.2 Columns, beams and slabs (design as normal structural elements)
Increasing structural class by 1 as per the recommendations given in Table 4.3N EC2
Reducing class by 2 considering member with slab geometry and special quality control
of the concrete production
EC2-Cl.4.4.1.2 Δcdur,st = 0 mm
(7),(8) Δcdur,add = 0 mm
= 20 mm
SLNAEC2- Δcdev = 10 mm
Table NA.1
Nominal cover (cnom) = cmin+Δcdev cnom
= 30 mm 30 mm
No special calculations are required for crack width as it is generally assumed to be limited by following the
reinforcement detailing rules according to EC2.
Page 3 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
3 Main structural features of the proposed building
FIG 02 SECTIONS
Page 4 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
Page 5 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
4 Actions
IL - Imposed load
On Ground Slab
2
ERQ Total floor area = 10.00 kN/m
EC1-Table 6.1
On roof
2
EC1-1-1 Roofs not accessible except for normal maintenance = 1.00 kN/m
Table 6.10 and repair
Ultimate combinations
Page 6 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
5 Support Conditions
The raft is supported on well compacted soil and the analysis will be carried out using modulus of subgrade reaction
theory. The modulus is used to compute node springs based on the contributing plan area of an element to any node.
It is anticipated some settlement due to the fill (recommendation of geotechnical expert) and if the settlement
is uniform it will not cause any structural distress. However, to allow certain degree of differential settlement
the modulus of subgrade reactions are calculated as varied from the maximum value to the 0 over the width of base.
Calculation of modulus of subgrade reaction is based on the properties of filling material.
It is conservatively taken here the allowable bearing capacity of the filled ground is 200kN/m2 (it would be higher
as it achieve minimum 95% degree of compaction) and the values of modulus of subgrade reactions are calculated for
a settlement of 25.4mm.
Note-: The assumed value of allowable bearing capacity need to be verified by doing a plate load test upon
the completion of fill.
Therefore,
3
FAD- 9-6 ks = 40*(SF)*qa kN/m
= 40*3*200
3
= 24000 kN/m
It is assumed that the values of ks linearly vary between 24000kN/m3 and 0 across the base width of 15m.
Page 7 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
6.0 Analysis results and designs of structural components of the building
6.1 Roof
6.1.1 Analysis Results and Design of Roof Slab
Load combination C1
Page 8 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
6.1.1.2 'X' Direction
Load combination C1
Page 9 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
6.1.1.3 Deflection
Assumed worse scenario where no support at the right end. A differential settlement about 25mm allowed
Page 10 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
6.1.2 Design of Roof Slab
6.1.2.1 'Z' direction Reinforcement
Sagging Reinforcement
Parameter Value
MEd 35.00 kNm/m
b 1000.00 mm
h 200.00 mm
d 164.00 mm
2
fck 25.00 N/mm
fyk 500.00 N/mm2
2
k0 0.052 - MEd/bd fck
EC2-1-1 Cl.3.1.7 k0' 0.167 > k0 singly reinforced section
z 156.08
0.95d 155.80
zdesign 155.80 As(req)
2
As(req),bending 516.43 mm /m - MEd/0.87fykz 516.43
EC2-1-1Cl.9.3 Asmin 221.73 mm2/m OK mm2/m
Asmax 8000.00 mm2/m OK
Hogging Reinforcement
Parameter Value
MEd 73.00 kNm/m
b 1000.00 mm
h 200.00 mm
d 162.00 mm
fck 25.00 N/mm2
fyk 500.00 N/mm2
k0 0.111 - MEd/bd2fck
EC2-1-1 Cl.3.1.7 k0' 0.167 > k0 singly reinforced section
z 144.12
0.95d 153.90
zdesign 144.12 As(req)
As(req),bending 1164.42 mm2/m - MEd/0.87fykz 1164.42
EC2-1-1Cl.9.3 Asmin 219.02 mm2/m OK mm2/m
Asmax 8000.00 mm2/m OK
Page 11 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
Design for Shear
Parameter Value
VEd 40.00 kN/m
b 1000.00 mm
d 162.00 mm
vEd 0.25 N/mm2 - VEd/bd
CRd,c 0.12 - Cl. 6.2.2 EC2-1-1
k 2.00 - -do-
Asl 1340.41 mm2/m - -do-
ρl 0.008 - -do-
2
fck 25.000 N/mm
2
vRd,c 0.659 N/mm -do-
vRd,c,min 0.49 N/mm2 -do-
(vRd,c)final 0.66 N/mm2 > vEd No shear R/F OK
Parameter Value
K 1.50
ρ0 0.0050 - Cl.7.4.2 EC2-1-1
fck 25.00 N/mm2
ρ 0.0031 - Cl.7.4.2 EC2-1-1
(l/d)limit 45.18 - -do-
(l/d)provided 43.21 < (l/d)limit OK
l - Effective span = 7000 mm
Page 12 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
6.1.2.2 'X' direction Reinforcement
Sagging Reinforcement
Parameter Value
MEd 20.00 kNm/m
b 1000.00 mm
h 200.00 mm
d 152.00 mm 2
fck 25.00 N/mm
2
fyk 500.00 N/mm
2
k0 0.035 - MEd/bd fck
EC2-1-1 Cl.3.1.7 k0' 0.167 > k0 singly reinforced section
z 147.20
0.95d 144.40
zdesign 144.40 As(req)
As(req),bending 318.40 mm2/m - MEd/0.87fykz 318.40
EC2-1-1Cl.9.3 Asmin 205.50 mm2/m Provide Minimum mm2/m
Asmax 8000.00 mm2/m OK
Hogging Reinforcement
Parameter Value
MEd 60.00 kNm/m
b 1000.00 mm
h 200.00 mm
d 146.00 mm
fck 25.00 N/mm2
fyk 500.00 N/mm2
2
k0 0.113 - MEd/bd fck
EC2-1-1 Cl.3.1.7 k0' 0.167 > k0 singly reinforced section
z 129.67
0.95d 138.70
zdesign 129.67 As(req)
2
As(req),bending 1063.74 mm /m - MEd/0.87fykz 1063.74
EC2-1-1Cl.9.3 Asmin 197.39 mm2/m Provide Minimum mm2/m
Asmax 8000.00 mm2/m OK
Page 13 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
Design for Shear
Parameter Value
VEd 42.00 kN/m
b 1000.00 mm
d 146.00 mm
vEd 0.29 N/mm2 - VEd/bd
CRd,c 0.12 - Cl. 6.2.2 EC2-1-1
k 2.00 - -do-
Asl 1340.41 mm2/m - -do-
ρl 0.009 - -do-
2
fck 25.000 N/mm
2
vRd,c 0.682 N/mm -do-
vRd,c,min 0.49 N/mm2 -do-
(vRd,c)final 0.68 N/mm2 > vEd No shear R/F OK
Page 14 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
6.1.3 Design of Roof Beams
Page 15 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
6.1.3.2 Design
The design is carried out using the 'Concrete Section Design Module' in Prokon.
Page 16 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
Proposed Reinforcement Arrangement
Longitudinal Bars
At Top = 3H25 @ critical supports and 3H16
elsewhere
At Bottom = 3H16 + 1H25 at centre of span and 3H16
= elsewhere
Shear Links = H 8 @ 125 at critical regions and H8@250
elsewhere
Page 17 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
6.1.4 Columns
Only the critical columns presented
6.1.4.1 Analysis Results
Page 18 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
6.1.4.2 Design
Internal Column
Page 19 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
External Column
Page 20 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
Page 21 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
6.2 Foundation
6.2.1 Analysis Results and Design of Raft Slab
Load combination C1
Page 22 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
6.2.1.2 'X' Direction
Load combination C1
Page 23 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
6.2.2 Design of Roof Slab
6.2.2.1 'Z' direction Reinforcement
Sagging Reinforcement
Parameter Value
MEd 72.90 kNm/m
b 1000.00 mm
h 300.00 mm
d 242.00 mm
fck 25.00 N/mm2
fyk 500.00 N/mm2
2
k0 0.050 - MEd/bd fck
EC2-1-1 Cl.3.1.7 k0' 0.167 > k0 singly reinforced section
z 230.85
0.95d 229.90
zdesign 229.90 As(req)
As(req),bending 728.95 mm2/m - MEd/0.87fykz 728.95
EC2-1-1Cl.9.3 Asmin 327.18 mm2/m OK mm2/m
Asmax 12000.00 mm2/m OK
Hogging Reinforcement
Parameter Value
MEd 50.00 kNm/m
b 1000.00 mm
h 300.00 mm
d 242.00 mm
fck 25.00 N/mm2
fyk 500.00 N/mm2
2
k0 0.034 - MEd/bd fck
EC2-1-1 Cl.3.1.7 k0' 0.167 > k0 singly reinforced section
z 234.47
0.95d 229.90
zdesign 229.90 As(req)
As(req),bending 499.97 mm2/m - MEd/0.87fykz 499.97
EC2-1-1Cl.9.3 Asmin 327.18 mm2/m OK mm2/m
Asmax 12000.00 mm2/m OK
Page 24 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
Design for Shear
Parameter Value
VEd 60.00 kN/m
b 1000.00 mm
d 242.00 mm
vEd 0.25 N/mm2 - VEd/bd
CRd,c 0.12 - Cl. 6.2.2 EC2-1-1
k 1.91 - -do-
Asl 1340.41 mm2/m - -do-
ρl 0.006 - -do-
fck 25.000 N/mm2
vRd,c 0.550 N/mm2 -do-
2
vRd,c,min 0.46 N/mm -do-
(vRd,c)final 0.55 N/mm2 > vEd No shear R/F OK
Parameter Value
K 1.50
ρ0 0.0050 - Cl.7.4.2 EC2-1-1
fck 25.00 N/mm2
ρ 0.0030 - Cl.7.4.2 EC2-1-1
(l/d)limit 48.04 - -do-
(l/d)provided 28.93 < (l/d)limit OK
l - Effective span = 7000 mm
Page 25 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
6.2.2.2 'X' direction Reinforcement
Sagging Reinforcement
Parameter Value
MEd 115.70 kNm/m
b 1000.00 mm
h 300.00 mm
d 226.00 mm
fck 25.00 N/mm2
fyk 500.00 N/mm2
2
k0 0.091 - MEd/bd fck
EC2-1-1 Cl.3.1.7 k0' 0.167 > k0 singly reinforced section
z 206.19
0.95d 214.70
zdesign 206.19 As(req)
2
As(req),bending 1289.95 mm /m - MEd/0.87fykz 1289.95
EC2-1-1Cl.9.3 Asmin 305.55 mm2/m Provide Minimum mm2/m
Asmax 12000.00 mm2/m OK
Hogging Reinforcement
Parameter Value
MEd 40.00 kNm/m
b 1000.00 mm
h 300.00 mm
d 226.00 mm
fck 25.00 N/mm2
fyk 500.00 N/mm2
2
k0 0.031 - MEd/bd fck
EC2-1-1 Cl.3.1.7 k0' 0.167 > k0 singly reinforced section
z 219.57
0.95d 214.70
zdesign 214.70 As(req)
As(req),bending 428.29 mm2/m - MEd/0.87fykz 428.29
EC2-1-1Cl.9.3 Asmin 305.55 mm2/m Provide Minimum mm2/m
Asmax 12000.00 mm2/m OK
Page 26 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
Design for Shear
Parameter Value
VEd 50.00 kN/m
b 1000.00 mm
d 226.00 mm 2
vEd 0.22 N/mm - VEd/bd
CRd,c 0.12 - Cl. 6.2.2 EC2-1-1
k 1.94 - -do-
Asl 1340.41 mm2/m - -do-
ρl 0.006 - -do-
2
fck 25.000 N/mm
vRd,c 0.572 N/mm2 -do-
2
vRd,c,min 0.47 N/mm -do-
2
(vRd,c)final 0.57 N/mm > vEd No shear R/F OK
** Since all the calculated values are less than the bearing capacity of 200kN/m2 the bearing capacity check is
satisfied
Page 27 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
6.2.4 Design of Rafter Beams
Page 28 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
6.2.4.2 Design
The design is carried out using the 'Concrete Section Design Module' in Prokon.
Page 29 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
Proposed Reinforcement Arrangement
Longitudinal Bars
At Top = 4H25
At Bottom = 4H25
Page 30 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
2
The proposed building is a single storey building with 100m plan area. It is composed of ground slab,
perimeter and partition walls with bricks or blocks and steel roof supported on concrete columns. The
ground level in the area is planned to be raised up to +4.5m MSL and the building is therefore
supported on the filled ground. A well compacted and controlled backfill has proposed in the area. A
raft foundation is proposed for the building. Ground beams are provided in the perimeter of the raft and
the roof supporting columns will be started from the ground beams.
This report presents the design of all structural components of the building.
- EN 1990 (EC0)
Basis of structural design
- EN 1991 (EC1)
Actions on structures
- EN 1992 (EC2)
Design of concrete structures
- EN 1993 (EC3)
Design of steel structures
- EN 1996 (EC6)
Design of masonry structures
- EN 1997 (EC7)
Geotechnical design
- EN 206-1:2000
Concrete - Part 1: Specification, performance, production and conformity
- EN 197-1
Cement - Part 1: Composition, specifications and conformity criteria for common cements
- Software
- PROKON 3.0
- Auto Cad 2016
- MS Excel 2013
Page 1 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
2 Design Data and Parameters
2.1 Material Properties
3
EC1-Table A.1 Density of Concrete (ϒc) = 24 kN/m
3
ERQ-VI-3-16 Density of Water (ϒw) = 10 kN/m
3
do Compacted soil density (Backfill) (ϒs) = 20 kN/m
0
FAD-Table2-6 Angle of shearing resistance for backfill material (φ k) = 30
(Type I or II soil- gravel sand mix as per ICTAD
SCA/5, Engineering classification - GW )
2.2.1 Foundation
Increasing structural class by 1 as per the recommendations given in Table 4.3N EC2
= 30 mm
SLNAEC2- Δcdev = 10 mm
Table NA.1
Nominal cover (cnom) = cmin+Δcdev
= 40 mm
EN1596 Nominal cover to be provided = 50 mm
Cl.7.6.4.1
Page 2 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
2.2.2 Columns, beams and slabs (design as normal structural elements)
Increasing structural class by 1 as per the recommendations given in Table 4.3N EC2
Reducing class by 2 considering member with slab geometry and special quality control
of the concrete production
EC2-Cl.4.4.1.2 Δcdur,st = 0 mm
(7),(8) Δcdur,add = 0 mm
= 20 mm
SLNAEC2- Δcdev = 10 mm
Table NA.1
Nominal cover (cnom) = cmin+Δcdev cnom
= 30 mm 30 mm
No special calculations are required for crack width as it is generally assumed to be limited by following the
reinforcement detailing rules according to EC2.
Page 3 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
3 Main structural features of the proposed building
FIG 02 SECTIONS
Page 4 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
Page 5 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
4 Actions
2
Weight of Zn/Al roof cladding = 0.05 kN/m
IL - Imposed load
On Ground Slab
2
ERQ Total floor area = 10.00 kN/m
EC1-Table 6.1
On roof
2
EC1-1-1 Roofs not accessible except for normal maintenance = 0.40 kN/m
Table 6.10 and repair
Ultimate combinations
Page 6 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
5 Support Conditions
The raft is supported on well compacted soil and the analysis will be carried out using modulus of subgrade reaction
theory. The modulus is used to compute node springs based on the contributing plan area of an element to any node.
Note-: The assumed value of allowable bearing capacity need to be verified by doing a plate load test upon
the completion of fill.
Therefore,
3
FAD- 9-6 ks = 40*(SF)*qa kN/m
= 40*3*200
3
= 24000 kN/m
FAD- 10-5
Ki = ks * Effective Area
For 0.5m x 0.5m shell element model of the raft,
Page 7 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
6.0 Analysis results and designs of structural components of the building
2.3m
10m
Page 8 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
6.1.2 Output Results
Page 9 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
6.1.2 Design
Page 10 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
Page 11 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
Page 12 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
6.2 Concrete Structure
Page 13 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
6.2.1 Analysis Results and Design of Raft Slab
Load combination C1
Page 14 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
6.2.1.2 'X' Direction
Load combination C1
Page 15 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
6.2.1.3 Deflection
Page 16 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
6.2.1.4 Design of Raft Slab
6.2.1.4.1 'Z' direction Reinforcement
Sagging Reinforcement
Parameter Value
MEd 8.40 kNm/m
b 1000.00 mm
h 200.00 mm
d 145.00 mm
2
fck 25.00 N/mm
fyk 500.00 N/mm2
2
k0 0.016 - MEd/bd fck
EC2-1-1 Cl.3.1.7 k0' 0.167 > k0 singly reinforced section
z 142.93
0.95d 137.75
zdesign 137.75 As(req)
2
As(req),bending 140.18 mm /m - MEd/0.87fykz 140.18
EC2-1-1Cl.9.3 Asmin 196.04 mm2/m OK mm2/m
Asmax 8000.00 mm2/m OK
Hogging Reinforcement
Parameter Value
MEd 16.50 kNm/m
b 1000.00 mm
h 200.00 mm
d 145.00 mm
fck 25.00 N/mm2
fyk 500.00 N/mm2
k0 0.031 - MEd/bd2fck
EC2-1-1 Cl.3.1.7 k0' 0.167 > k0 singly reinforced section
z 140.87
0.95d 137.75
zdesign 137.75 As(req)
As(req),bending 275.36 mm2/m - MEd/0.87fykz 275.36
EC2-1-1Cl.9.3 Asmin 196.04 mm2/m OK mm2/m
2
Asmax 8000.00 mm /m OK
Page 17 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
Design for Shear
Parameter Value
VEd 35.90 kN/m
b 1000.00 mm
d 145.00 mm 2
vEd 0.25 N/mm - VEd/bd
CRd,c 0.12 - Cl. 6.2.2 EC2-1-1
k 2.00 - -do-
2
Asl 392.70 mm /m - -do-
ρl 0.003 - -do-
fck 25.000 N/mm2
vRd,c 0.454 N/mm2 -do-
2
vRd,c,min 0.49 N/mm -do-
(vRd,c)final 0.49 N/mm2 > vEd No shear R/F OK
Parameter Value
K 1.50
ρ0 0.0050 - Cl.7.4.2 EC2-1-1
2
fck 25.00 N/mm
ρ 0.0010 - Cl.7.4.2 EC2-1-1
(l/d)limit 279.18 - -do-
(l/d)provided 34.48 < (l/d)limit OK
l - Effective span = 5000 mm
Page 18 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
6.2.1.4.2 'X' direction Reinforcement
Sagging Reinforcement
Parameter Value
MEd 14.60 kNm/m
b 1000.00 mm
h 200.00 mm
d 135.00 mm 2
fck 25.00 N/mm
2
fyk 500.00 N/mm
2
k0 0.032 - MEd/bd fck
EC2-1-1 Cl.3.1.7 k0' 0.167 > k0 singly reinforced section
z 131.07
0.95d 128.25
zdesign 128.25 As(req)
As(req),bending 261.70 mm2/m - MEd/0.87fykz 261.70
EC2-1-1Cl.9.3 Asmin 182.52 mm2/m Provide Minimum mm2/m
Asmax 8000.00 mm2/m OK
Hogging Reinforcement
Parameter Value
MEd 13.40 kNm/m
b 1000.00 mm
h 200.00 mm
d 135.00 mm
fck 25.00 N/mm2
fyk 500.00 N/mm2
2
k0 0.029 - MEd/bd fck
EC2-1-1 Cl.3.1.7 k0' 0.167 > k0 singly reinforced section
z 131.40
0.95d 128.25
zdesign 128.25 As(req)
2
As(req),bending 240.19 mm /m - MEd/0.87fykz 240.19
EC2-1-1Cl.9.3 Asmin 182.52 mm2/m Provide Minimum mm2/m
Asmax 8000.00 mm2/m OK
Page 19 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
Design for Shear
Parameter Value
VEd 30.00 kN/m
b 1000.00 mm
d 135.00 mm
vEd 0.22 N/mm2 - VEd/bd
CRd,c 0.12 - Cl. 6.2.2 EC2-1-1
k 2.00 - -do-
Asl 392.70 mm2/m - -do-
ρl 0.003 - -do-
2
fck 25.000 N/mm
2
vRd,c 0.465 N/mm -do-
vRd,c,min 0.49 N/mm2 -do-
(vRd,c)final 0.49 N/mm2 > vEd No shear R/F OK
** Since all the calculated values are less than the bearing capacity of 200kN/m2 the bearing capacity check is
satisfied
Page 20 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
6.2.2 Design of Raft Beams
Page 21 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
6.2.2.2 Design
The design is carried out using the 'Concrete Section Design Module' in Prokon.
Page 22 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
Proposed Reinforcement Arrangement
Longitudinal Bars
At Top = 3H16 (=603.19mm2)
At Bottom = 3H16 (=603.19mm2)
Shear Links = H 8 @ 250
Page 23 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
6.2.3 Analysis Results and Design of Columns
Load Combination C1
Page 24 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
6.2.3.2 Design
Page 25 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
Proposed Reinforcement Arrangement
Page 26 of 26
)4.5
0
01
15 H C
W
40 A
IT
kV N
A OP
GE Y
N. -01
40 TAN HT
00 K =1
HE
L =0 .5m
FU 2
IG
02
EL
40 TAN HT
0 0 K =1
HE
L = .5m
FU 01
IG
EL
15 H
W
40 CA
IT
kV N
04
A OP
PR LE
GE Y
SI
IM NC
N. - 01
AR ER
Y
(P
04
LI
NT
H)
PR LEN
SI
IM C
AR ER
Y
SE SIL
20 NE
GE
CO EN
0K R
ND CE
VA AT
AR R
LV R
Y
O
3 GENERATOR ROOM
SE SIL
CO EN
ND CE
AR R
4
Y
5
PR LE
SI
IM NC
6
AR ER
Y
PR LEN
SI
IM C
AR ER
4 WORK SHOP
Y
W1
SE SIL
SY EI
CO
NC GH
H
F.G
W1
ND CE
PA T=2
EN
AR R
NE m
Y
L
SE SIL
L.(+
CO EN
N CE
D R
A
RY
01
)4.5
0
04
WARE HOUS
E
W1
03
D1
03
WORKSHOP W1
02
03
RD1
1:20 slope
F.G
L.(+
)4.5
0
CO-ORDINATES OF WORKSHOP & STORES CO-ORDINATES OF GENERATOR ROOM
01 - X=400999.4881 Y=495126.3193 01 - X=400997.4381 Y=495150.0143
02 - X=401007.5749 Y=495120.4368 02 - X=401000.4272 Y=495136.2860
03 - X=401013.4575 Y=495128.5235 03 - X=401014.8395 Y=495139.4239
04 - X=401005.3707 Y=495134.4061 04 - X=401011.8261 Y=495153.1470
THE ORIGINAL DRAWING IS IN A1 SIZE
C COPYRIGHT OF CHINA GEO
650
PRIMARY SECONDARY
Down pipe SILENCER SILENCER
HOT AIR DUCT
2700x3300 Wall 1540kVA
GEN 900 900 2700x3300 WALL
Opening for
4300
CANOPY OPENING FOR
fresh air intake
HOT AIR DISCHARGE
2700
4100
3000
3100
1500
1500
WALL OPENING FOR
D1 FRESH AIR INTAKE FRESH AIR HOT AIR
SIDE 100mm Thk.PLINTH SIDE
400
100
400
FOR HOT AIR
SECTION A-A
DISCHARGE
1200
SYNC PANEL
A 200KVA
1400
HEIGHT=2m
3850
LV GENERATOR
4000
AREA WALLS CEILING FLOOR
3300
WHITE COLOUR PAINTED WITH A PRIMER COAT & TWO COATS OF EMULSION
V1 PAINT.
V1
1540kVA GEN.
A 14050
3300
32
75
200 FOR DETAIL NOTES
F.F.L 4.60 SLOPE 1: 100 F.G.L
4. STRUCTURAL CONCRETE SHALL BE
1540kVA GEN. a. C25/30 FOR SLAB ,BEAMS AND COLUMNS.
VARIES
min.150
Reinforce with
WITH CANOPY-01 A142 B.R.C. d. C16/20 FOR BLINDING CONCRETE
1075 75 Steel mesh
CONCRETE COVER SHALL BE
75
4325 D2 D2 a. 50mm FOR GROUND SLAB AND BEAMS .
850
Ground Slab
(PLINTH) 350 b. 30mm FOR OTHER BEAMS AND COLUMNS.
Gauge 1000 Polythene sheet 5. THE GROUND SLAB SHALL BE FOUND ON 50mm THICK BLINDING
Gauge 1000
Polythene sheet Grade 25 Concrete with a 142 BRC CONCRETE OVERLYING GAUGE 1000 POLYTHENE SHEET .
Steel mesh and cement rendered to 6. DESIGNED BEARING CAPACITY OF SOIL IS 200kN/m2 AND THIS SHALL BE
14750 match floor tile colour VERIFIED BY A PLATE LOAD TEST AFTER COMPLETING OF BACKFILL .
FLOOR PLAN TYPICAL MASONRY WALL AND PLINTH DETAIL
1:20
1:50
THE ORIGINAL DRAWING IS IN A1 SIZE
C COPYRIGHT OF CHINA GEO
9.50 MSL
20°
Mineral fiber or
fibro cement
ceiling
7633
4600
(F.G.L.)=
4.50 MSL (F.F.L.)=4.60 MSL
1 2 3
A
10000
W1 W1
AREA WALLS CEILING FLOOR
C
SCHEDULE OF DOORS & WINDOWS
EXTERNAL WALLS ARE TO BE OF 200mm HOLLOW CEMENT BLOCK WORK.
TYPE
SIZE
DESCRIPTION A EXTERNAL WALL SURFACE ARE TO SEMI ROUGH FINISHED CEMENT PLASTER MINERAL FIBRE
POWER TROWEL
(WXH) IN CEMENT MORTAR 1:5 MIX AND FINISH WITH WHITE COLOUR PRIMER COAT OR FIBRE CEMENT
ALUM. FRAME GLAZED & ALU. DOUBLE SASH & TWO COATS OF APPROVED WEATHER RESISTANT EMULSION PAINT. TO SRI LANKAN SMOOTH FINISH.
D1 1500 x 2400 DOOR INTERNAL WALLS ARE TO BE OF 100mm SOLID CEMENT BLOCK AND STANDARDS.
A WITH FIXED ALU. LOUVERS ABOVE SURFACES ARE TO BE SMOOTH FINISHED CEMENT SAND PLASTER (OR WALL
4475
B
D1 225/200mm Brick/Block work
with 1:5 cement sand mortar
Internal plaster
with 1:5 cement sand External plaster with 1:5 cement
mix finish and panted sand mix semi rough finish and
with two coats of painted with two coats of approved
emulsion paint weather resistant emulsion paint GENERAL NOTES:
Plinth plaster with 1:3 cement sand 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS.
12mm Expansion joint fill with 3. REFER STANDARD DRAWINGS Nos. MCUDP/NLGPS/D/DWG/S/01 TO 10
Power trowel mastic filler
WORKSHOP FOR DETAIL NOTES
smooth finish 1200 4. STRUCTURAL CONCRETE SHALL BE
32
75
F.F.L 4.60 SLOPE 1: 100 200 F.G.L a. C25/30 FOR SLAB ,BEAMS AND COLUMNS.
d. C16/20 FOR BLINDING CONCRETE
VARIES
min.150
Reinforce with
75
A142 B.R.C. CONCRETE COVER SHALL BE
Steel mesh
a. 50mm FOR GROUND SLAB AND BEAMS .
75
b. 30mm FOR OTHER BEAMS AND COLUMNS.
RD1 Ground Slab
A 350 5. THE GROUND SLAB SHALL BE FOUND ON 50mm THICK BLINDING
Gauge 1000 Polythene sheet CONCRETE OVERLYING GAUGE 1000 POLYTHENE SHEET .
Gauge 1000
Polythene sheet Grade 25 Concrete with a 142 BRC 6. DESIGNED BEARING CAPACITY OF SOIL IS 200kN/m2 AND THIS SHALL BE
A
Steel mesh and cement rendered to VERIFIED BY A PLATE LOAD TEST AFTER COMPLETING OF BACKFILL .
match floor tile colour
TYPICAL MASONRY WALL AND PLINTH DETAIL
FLOOR PLAN 1:20
THE ORIGINAL DRAWING IS IN A1 SIZE
C COPYRIGHT OF CHINA GEO 1:50
CONSULTANT: CONTRACTOR : DRAWING TITLE : CLIENT :
DESIGN : DRAWN : CHECKED : THE GOVERNMENT OF THE DEMOCRATIC SOCIALIST
REPUBLIC OF SRI LANKA
CHINA GEO ENGINEERING MINISTRY OF MEGAPOLIS &WESTERN DEVELOPMENT
CORPORATION
ARCHITECTURAL DETAILS CDM
.................................... BKIJ
....................................
DAJ
....................................
DOHWA - MAHAB GHODSS JV WORKSHOP AND STORE BUILDING PROJECT :
METRO COLOMBO URBAN DEVELOPMENT PROJECT
2 THIRD ISSUE- Incorporating latest M&E revisions . 31-01-19
RECOMMENDED : APPROVED : DATE :
SECOND ISSUE- Incorporating comments MAIN OFFICE : Buiding B, No. 92, Xiangshan South Road, SHEET 01 OF 01 DESIGN AND BUILDING OF ST .SEBASTIAN
1 05-07-18 Haidian District,Beijing, China. Post Code 100093 NORTH LOCK GATES AND PUMPING STATION
Ref:DH-KOR-MCUDP-LKA-170904-133
TEL : (86-10) 82408500, FAX : (86-10) 82408544
0 FIRST ISSUE 18-12-17 RESIDENT OFFICE : 93/1,Alwitigala mawatha SCALE PLANT : FILE NAME DRAWING NO. REV.
RESIDENT OFFICE : 6th floor,meewalla building, LIULAIFU 01-12-2017
NO. DESCRIPTION DATE INITS. Colombo - 08, Sri Lanka. LULIANG .................................... ....................................
REVISION DETAILS
Colombo - 04, Sri Lanka.
TEL : +94 11 2366882 , FAX : +94 11 2367516
AS SHOWN
PAPER : A1
....................................
COMPLETED DATE
MCUDP/NLGPS/04 MCUDP/NLGPS/D/DWG/A/04/002 2
70H16-01a-150-T2
70H16-01-150-B2
1 2 3
1 2 2
7375 7375
14850
GB1 (500x600)
C
C
C1 C1 C1
8525
73H16-02a-150-T1
02a
GB2 (500x600)
GB2 (500x600)
GB2 (500x600)
14150
14050
C1 GB1 (500x600)
C1
Y Y
B
B
73H16-02-150-B1
02
01
5525
01a
GB1 (500x600)
C1
A
C1
C1 A
14750
GROUND BEAM LAYOUT PLAN
1:50
GB1 (500x600) 300 mm THK.GROUND SLAB
1 1:40 2 3
500
1:50
H25
H25
H25
H25
1 02a
4H25 4H25
H8@200
600
H25
H25
H25
300
1 SECTION 1-1
4H25 4H25 1:20 01 01
GB1 (500x600) 02
A 1:40 B C 500
SECTION Y-Y
H25
H25
H25
H25
1
4H25 4H25
H8@200
600
H8@200 H8@200
H25
H25
H25
H25
1 SECTION 1-1
THE ORIGINAL DRAWING IS IN A1 SIZE 4H25 4H25 1:20
C COPYRIGHT OF CHINA GEO
70H12-03-200-T2
1 2 3
7375 7375 1 2 2
14750
RB1 (300x500)
COLUMN SCHEDULE
C
500
C1 C1 C1 TYPE
COLUMN C
73H12-04a-200-T1
REFERENCE
1500
C1 3000
04a
03b
SFL+8.90
H8@100
1500 1500
1000
03a 03a
RB2 (300x500)
RB2 (300x500)
H8@250
4H20+ 4H25
14050
C1 A-A
14050
C1 RB1 (300x500)
Z Z
B
H8@100
1000
3226
B
SSL+4.60 73H16-04b-150-T1
04b 73H12-04-200-B1
500x600 ground beam
04
5525
COLUMN 03
STARTER
300
H25 H20 H25
RB1 (300x500)
300
C1 H20 H20
1500
C1
A 73H12-04a-200-T1
C1 H25 H20 H25
04a
SECTION A-A A
ROOF BEAM LAYOUT PLAN
1:50 500 14750
H16
H16
H16
H25
H25
H25
1 2
1500 3H16 3000 3H25 3H16 04b
H8@250 H8@125 03a 03b 03a
500
500
03c 03b 03c
03 03
H8@125 H8@250 H8@125 H8@125 H8@250 H8@125
H16
H16
H25
H16
H16
H16
H16
4000 4000
200
1 2 SECTION 1-1 SECTION 2-2
3H16 1H25 3H16 1H25 3H16 1:20 1:20 04
NOTES
RB2 (300x500) 1. PLEASE REFER STANDARD DRAWINGS Nos. MCUDP/NLGPS/D/DWG/S/01 TO 10 FOR DETAIL NOTES.
1 2 3 2. LAP LENGTHS SHOULD NOT BE LESS THAN 50 TIMES THE SMALLER BAR DIAMETER.
1:40 3. ANCHORAGE LENGTH SHOULD NOT BE LESS THAN 40 TIMES THE BAR DIAMETER UNLESS
OTHERWISE SPECIFIED.
1 2 300 300
4. CHARACTERISTIC STRENGTH OF HIGH YIELD STEEL BARS SHALL BE
1500 3H16 3000 3H25 3H16
H16
H16
H16
H25
H25
H25
500 N/mm2 .
500
2 H 20 - 01 - 250 - T1
4000 4000
H16
H16
H25
H16
H16
H16
H16
1 2 No. OF BARS
3H16 1H25 1H25 3H16 SECTION 1-1 SECTION 2-2 BAR LOCATION
1:20 1:20 BAR SPACING
TYPE OF STEEL
C
B
1 2 3
10300
5000 5000
4
GB1 (400x500)
C
COLUMN SCHEDULE
C2
C1 C1
TYPE
COLUMN
REFERENCE
C1
4475
SFL+9.50
01a 250x300 Roof beam
10300
GB2 (400x500)
H8@275
B
GB2 (400x500)
C2 C1
8H16
A-A
01
H8@100
5525
1500
02 23H10-02-200-T2&B2
SSL+4.60
6
COLUMN
STARTER
C1 C1
300
H16
H16
H16
A C2
126H10-01-200-B1
GB1 (400x500)
300
H16 H16
H16
H16
H16
COLUMN BEAM LAYOUT 126H10-01a-200-T1
SECTION A-A
1:50 200mm THICK GROUND SLAB
1:60
02
200
GB1 (400x500) 400
1:40 01a
1 2 3 H16 H16 H16 01a
1 H8@250 02
500
3H16-06
01
01 SECTION 02-02
H8@250 1:20
H16 H16 H16
SECTION 1-1 NOTES
1:16 1. PLEASE REFER STANDARD DRAWINGS Nos. MCUDP/NLGPS/D/DWG/S/01 TO 10 FOR DETAIL NOTES.
1
3H16-07 2. LAP LENGTHS SHOULD NOT BE LESS THAN 50 TIMES THE SMALLER BAR DIAMETER.
3. ANCHORAGE LENGTH SHOULD NOT BE LESS THAN 40 TIMES THE BAR DIAMETER UNLESS
OTHERWISE SPECIFIED.
GB2 (400x500) 4. CHARACTERISTIC STRENGTH OF HIGH YIELD STEEL BARS SHALL BE
A 1:40 B C 400 500 N/mm2 .
H16 H16 H16 5. NOTATION TO REINFORCEMENT IS AS FOLLOWS:
3H16-08
H8@250 2 H 20 - 01 - 250 - T1
500
THE ORIGINAL DRAWING IS IN A1 SIZE 6. DISTRIBUTION BARS OF H10@200 SHALL BE PROVIDED WHERE NECESSARY.
C COPYRIGHT OF CHINA GEO
Y
250x300 Roof beam
C
C2 C1 C2
Steel truss
101x51x1.5mm TK. 'C' 40 x 40 x 5
PURLIN (p) AT 1200 C/S ANGLE IRON
C2 C2
500
B
BOLTED TO ANGLE
CLEAT
Steel truss
0.47mm THK.
ZN-ALUM ROOFING
SHEETS 25 x 25 x 5
ANGLE IRON
Y
ROOF LAYOUT 748
1:100
748
A 12.25MSL C
5000 250
H16 H16
ROOF TRUSS
300
H8-125
SCALE:- 1 : 16
300
SECTION Y-Y 1:50
300
Zn / Al GUTTER 60 x 60 x 6 ANGLE IRON
PROVIDE SLOTTED HOLES FOR FREE END 5. MINIMUM FILLET WELDING LENGTH (h) TO BE 200mm UNLESS SHOWN OTHERWISE.
ONLY 6. DIMENSION OF STEEL STRUCTURE SHALL BE CONFIRMED AT
SITE BEFORE FABRICATION.
225 x 400 x 10 BASE PLATE
300