MINISTRY OF MEGAPOLIS & WESTERN DEVELOPMENT

METRO COLOMBO URBAN DEVELOPMENT PROJECT

Design and Building of St. Sebastian North Lock Gates and Pumping
Station
Contract No: MCUDP/SLLRDC/W/12

REPORT ON DESIGN OF ANCILLARY BUILDINGS


REVISION 02

CHINA GEO ENGINEERING CORPORATION

Feb-19 MCUDP/NLGPS/D/DOC/S/004-R2
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output

DESIGN OF GENERATOR BUILDING

2
The proposed building is a single storey building with 225m (approx.) plan area. It is composed of
ground slab, perimeter and partition walls with bricks or blocks and reinforced concrete roof slab. The
ground level in the area is planned to be raised up to +4.5m MSL and the building is therefore
supported on the filled ground. A well compacted and controlled backfill has proposed in the area.
Considering the nature of the structure which is used to install generators, a raft foundation is proposed
for the building. Ground beams are provided in the perimeter of the raft and the roof supporting
columns will be started from the ground beams.
This report presents the design of all structural components of the building.

1 References and Software

- EN 1990 (EC0)
Basis of structural design

- EN 1991 (EC1)
Actions on structures

- EN 1992 (EC2)
Design of concrete structures

- EN 1993 (EC3)
Design of steel structures

- EN 1996 (EC6)
Design of masonry structures

- EN 1997 (EC7)
Geotechnical design

- EN 206-1:2000
Concrete - Part 1: Specification, performance, production and conformity

- EN 197-1
Cement - Part 1: Composition, specifications and conformity criteria for common cements

- Sri Lnaka National Annex to EN 1991 (SLNA EC1)

- Sri Lanka National Annex to EN 1992 (SLNA EC2)

- Reinforced concrete design to Eurocodes (RCDE)


Prab Bhatt, Thomas J. MacGinley, Ban Seng Choo - 4th Edition

- Foundation Analysis and Design (FAD)


Joseph E. Bowles, P.E., S.E - Fifth Edition

- Standard Method of Detailing Structural Concrete (IstructEM)


Institution of Structural Engineers UK

- Employer's Requirements (ERQ)

- Software
- PROKON 3.0
- Auto Cad 2016
- MS Excel 2013

Page 1 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
2 Design Data and Parameters
2.1 Material Properties
3
EC1-Table A.1 Density of Concrete (ϒc) = 24 kN/m

ERQ- Cl..2.2.7.3 Type of cement = Ordinary Portland Cement


Cl.3.6.3.1 CEM I according to EN 197
G5056- P.16

3
ERQ-VI-3-16 Density of Water (ϒw) = 10 kN/m
3
do Compacted soil density (Backfill) (ϒs) = 20 kN/m
0
FAD-Table2-6 Angle of shearing resistance for backfill material (φ k) = 30
(Type I or II soil- gravel sand mix as per ICTAD
SCA/5, Engineering classification - GW )

2.2 Durability Requirements

2.2.1 Foundation

EC2-Table 4.1 Exposure class related to environmental conditions = XC2


where, concrete surfaces subject to long-term water contact - many foundations

EC2-Table E.1N Minimum strength class of concrete = C25/30


3
EN206- Table F.1 Minimum cement content = 400 kg/m
ERQ- 3.6.4.4 Maximum Water to Cement ratio = 0.55

EC2-4.4.1.2(5) Structural class for design working life of 50 years = S4

ERQ-VI-3-6 Required design life = 60 years

Increasing structural class by 1 as per the recommendations given in Table 4.3N EC2

Design structural class = S5

EC2-Table 4.4N Minimum cover with regard to durability (cmin,dur) = 30 mm

SLNAEC2- Additive safety element (Δcdur,ϒ) = 0 mm


Table NA.1
EC2-Cl.4.4.1.2 Δcdur,st = 0 mm
(7),(8) Δcdur,add = 0 mm

EC2-Table 4.2 Minimum cover with regard to bond (cmin,b) = 20 mm

Eqn 4.2 Minimum cover (cmin) = max{cmin,b;cmin,dur+Δcdur,ϒ-Δcdur,st-Δcdur,add;10 mm}

= 30 mm
SLNAEC2- Δcdev = 10 mm
Table NA.1
Nominal cover (cnom) = cmin+Δcdev
= 40 mm
Nominal cover to be provided = 50 mm

Page 2 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
2.2.2 Columns, beams and slabs (design as normal structural elements)

EC2-Table 4.1 Exposure class related to environmental conditions = XC3


Protective coating shall be applied on top of the roof slab

EC2-Table E.1N Minimum strength class of concrete = C25/30


3
EN206- Table F.1 Minimum cement content = 320 kg/m
ERQ- 3.6.4.4 Maximum Water to Cement ratio = 0.55

EC2-4.4.1.2(5) Structural class for design working life of 50 years = S4

ERQ-VI-3-6 Required design life = 60 years

Increasing structural class by 1 as per the recommendations given in Table 4.3N EC2

Reducing class by 2 considering member with slab geometry and special quality control
of the concrete production

Design structural class = S3

EC2-Table 4.4N Minimum cover with regard to durability (cmin,dur) = 20 mm

SLNAEC2- Additive safety element (Δcdur,ϒ) = 0 mm


Table NA.1

EC2-Cl.4.4.1.2 Δcdur,st = 0 mm
(7),(8) Δcdur,add = 0 mm

EC2-Table 4.2 Minimum cover with regard to bond (cmin,b) = 20 mm

Eqn 4.2 Minimum cover (cmin) = max{cmin,b;cmin,dur+Δcdur,ϒ-Δcdur,st-Δcdur,add;10 mm}

= 20 mm

SLNAEC2- Δcdev = 10 mm
Table NA.1
Nominal cover (cnom) = cmin+Δcdev cnom
= 30 mm 30 mm

Nominal cover to be provided = 30 mm

2.3 Crack width control

Maximum allowable crack width for normal reinforced = 0.3 mm


EC2-Table 7.1N concrete members with exposure class XC2 or XC3

No special calculations are required for crack width as it is generally assumed to be limited by following the
reinforcement detailing rules according to EC2.

Page 3 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
3 Main structural features of the proposed building

FIG 01 PLAN VIEW

FIG 02 SECTIONS

Page 4 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output

FIG 03 Prokon 3D model

Page 5 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
4 Actions

4.1 Load cases

DL - All permanent actions on the structure

Self weight of structural elements = This action will automatically be


calculated by the program based
on the assigned material densities

Load from 225mm thick 4.0m high brick = 22.6*225*4.0/1000


masonry wall = 20.34 kN/m

Roof finish (50mm thick sloping screed) = 20*0.05


2
= 1.00 kN/m

IL - Imposed load

On Ground Slab
2
ERQ Total floor area = 10.00 kN/m
EC1-Table 6.1

On roof
2
EC1-1-1 Roofs not accessible except for normal maintenance = 1.00 kN/m
Table 6.10 and repair

4.2 Load combinations

Ultimate combinations

COM1 - 1.35*DL + 1.5*IL

Page 6 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
5 Support Conditions
The raft is supported on well compacted soil and the analysis will be carried out using modulus of subgrade reaction
theory. The modulus is used to compute node springs based on the contributing plan area of an element to any node.
It is anticipated some settlement due to the fill (recommendation of geotechnical expert) and if the settlement
is uniform it will not cause any structural distress. However, to allow certain degree of differential settlement
the modulus of subgrade reactions are calculated as varied from the maximum value to the 0 over the width of base.
Calculation of modulus of subgrade reaction is based on the properties of filling material.
It is conservatively taken here the allowable bearing capacity of the filled ground is 200kN/m2 (it would be higher
as it achieve minimum 95% degree of compaction) and the values of modulus of subgrade reactions are calculated for
a settlement of 25.4mm.
Note-: The assumed value of allowable bearing capacity need to be verified by doing a plate load test upon
the completion of fill.

Therefore,
3
FAD- 9-6 ks = 40*(SF)*qa kN/m
= 40*3*200
3
= 24000 kN/m

It is assumed that the values of ks linearly vary between 24000kN/m3 and 0 across the base width of 15m.

X/(m) ks/(kN/m3) Ki/(kN/m) Ki = ks * Effective Area


0 24000 3000 For 0.5m x 0.5m shell element model of the raft,
0.5 23200 5800
1 22400 5600 Kcorner = ks*(0.25*0.25) kN/m
1.5 21600 5400
2 20800 5200 Kside = ks*(0.5*0.25) kN/m
2.5 20000 5000
3 19200 4800 Kinterior = ks*(0.5*0.5) kN/m
3.5 18400 4600
4 17600 4400
4.5 16800 4200
5 16000 4000
5.5 15200 3800
6 14400 3600
6.5 13600 3400
7 12800 3200
7.5 12000 3000
8 11200 2800
8.5 10400 2600
9 9600 2400
9.5 8800 2200
10 8000 2000
10.5 7200 1800
11 6400 1600
11.5 5600 1400
12 4800 1200
12.5 4000 1000
13 3200 800
13.5 2400 600
14 1600 400
14.5 800 200
15 0 0

Page 7 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
6.0 Analysis results and designs of structural components of the building

6.1 Roof
6.1.1 Analysis Results and Design of Roof Slab

6.1.1.1 'Z' Direction

Maximum ultimate moment, Mx Sagging = 35.00 kNm/m

Maximum ultimate moment, Mx Hogging = 73.00 kNm/m


Load combination C1

Maximum ultimate shear, Vy = 40.00 kN/m

Load combination C1

Page 8 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
6.1.1.2 'X' Direction

Maximum ultimate moment, My Sagging = 20.0 kNm/m

Maximum ultimate moment, My Hogging = 60 kNm/m


Load combination C1

Maximum ultimate shear, Vx = 42.00 kN/m

Load combination C1

Page 9 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
6.1.1.3 Deflection

Assumed worse scenario where no support at the right end. A differential settlement about 25mm allowed

Page 10 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
6.1.2 Design of Roof Slab
6.1.2.1 'Z' direction Reinforcement

200 mm thick section


Preliminary details and assumptions
Parameter Value
Cnom 30.00 mm
2
Z' direction Sag. R/F H 12 @ 200 565 mm /m
Z' direction Hog. R/F H 16 @ 150 1340
X' direction Sag. R/F H 12 @ 200 565 mm2/m
X' direction Hog. R/F H 16 @ 150 1340

Design for ultimate condition

Design for Bending

Sagging Reinforcement
Parameter Value
MEd 35.00 kNm/m
b 1000.00 mm
h 200.00 mm
d 164.00 mm
2
fck 25.00 N/mm
fyk 500.00 N/mm2
2
k0 0.052 - MEd/bd fck
EC2-1-1 Cl.3.1.7 k0' 0.167 > k0 singly reinforced section
z 156.08
0.95d 155.80
zdesign 155.80 As(req)
2
As(req),bending 516.43 mm /m - MEd/0.87fykz 516.43
EC2-1-1Cl.9.3 Asmin 221.73 mm2/m OK mm2/m
Asmax 8000.00 mm2/m OK

Hogging Reinforcement
Parameter Value
MEd 73.00 kNm/m
b 1000.00 mm
h 200.00 mm
d 162.00 mm
fck 25.00 N/mm2
fyk 500.00 N/mm2
k0 0.111 - MEd/bd2fck
EC2-1-1 Cl.3.1.7 k0' 0.167 > k0 singly reinforced section
z 144.12
0.95d 153.90
zdesign 144.12 As(req)
As(req),bending 1164.42 mm2/m - MEd/0.87fykz 1164.42
EC2-1-1Cl.9.3 Asmin 219.02 mm2/m OK mm2/m
Asmax 8000.00 mm2/m OK

Page 11 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
Design for Shear

Parameter Value
VEd 40.00 kN/m
b 1000.00 mm
d 162.00 mm
vEd 0.25 N/mm2 - VEd/bd
CRd,c 0.12 - Cl. 6.2.2 EC2-1-1
k 2.00 - -do-
Asl 1340.41 mm2/m - -do-
ρl 0.008 - -do-
2
fck 25.000 N/mm
2
vRd,c 0.659 N/mm -do-
vRd,c,min 0.49 N/mm2 -do-
(vRd,c)final 0.66 N/mm2 > vEd No shear R/F OK

Design for Service Condition


A wB
+0
B +C D+9 E+0. +2.
+8.
F +9.5+
+2.8
Deflection

Parameter Value
K 1.50
ρ0 0.0050 - Cl.7.4.2 EC2-1-1
fck 25.00 N/mm2
ρ 0.0031 - Cl.7.4.2 EC2-1-1
(l/d)limit 45.18 - -do-
(l/d)provided 43.21 < (l/d)limit OK
l - Effective span = 7000 mm

Page 12 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
6.1.2.2 'X' direction Reinforcement

200 mm thick section

Preliminary details and assumptions


Parameter Value
Cnom 30.00 mm
2
Z' direction Sag. R/F H 12 @ 200 565 mm /m
Z' direction Hog. R/F H 16 @ 150 1340
2
X' direction Sag. R/F H 12 @ 200 565 mm /m
X' direction Hog. R/F H 16 @ 150 1340

Design for ultimate condition

Design for Bending

Sagging Reinforcement
Parameter Value
MEd 20.00 kNm/m
b 1000.00 mm
h 200.00 mm
d 152.00 mm 2
fck 25.00 N/mm
2
fyk 500.00 N/mm
2
k0 0.035 - MEd/bd fck
EC2-1-1 Cl.3.1.7 k0' 0.167 > k0 singly reinforced section
z 147.20
0.95d 144.40
zdesign 144.40 As(req)
As(req),bending 318.40 mm2/m - MEd/0.87fykz 318.40
EC2-1-1Cl.9.3 Asmin 205.50 mm2/m Provide Minimum mm2/m
Asmax 8000.00 mm2/m OK

Hogging Reinforcement
Parameter Value
MEd 60.00 kNm/m
b 1000.00 mm
h 200.00 mm
d 146.00 mm
fck 25.00 N/mm2
fyk 500.00 N/mm2
2
k0 0.113 - MEd/bd fck
EC2-1-1 Cl.3.1.7 k0' 0.167 > k0 singly reinforced section
z 129.67
0.95d 138.70
zdesign 129.67 As(req)
2
As(req),bending 1063.74 mm /m - MEd/0.87fykz 1063.74
EC2-1-1Cl.9.3 Asmin 197.39 mm2/m Provide Minimum mm2/m
Asmax 8000.00 mm2/m OK

Page 13 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
Design for Shear

Parameter Value
VEd 42.00 kN/m
b 1000.00 mm
d 146.00 mm
vEd 0.29 N/mm2 - VEd/bd
CRd,c 0.12 - Cl. 6.2.2 EC2-1-1
k 2.00 - -do-
Asl 1340.41 mm2/m - -do-
ρl 0.009 - -do-
2
fck 25.000 N/mm
2
vRd,c 0.682 N/mm -do-
vRd,c,min 0.49 N/mm2 -do-
(vRd,c)final 0.68 N/mm2 > vEd No shear R/F OK

6.1.2.3 Design summary for Roof Slab

200mm uniform thickness

'Z' direction Sagging = H12 @ 200c/c

'Z' direction Hogging = H16 @ 150 c/c

'X' direction Sagging = H12 @ 200c/c

'X' direction Hogging = H16 @ 150c/c

Detailing will be carried out according to the EC2 guidelines

Page 14 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
6.1.3 Design of Roof Beams

6.1.3.1 Analysis Results

Bending Moment Diagram


Maximum Bending Moment (Sagging) = 174 kNm

Maximum Bending Moment (Hogging) = 225.7 kNm


Load Combination C1

Shear Force Diagram

Maximum Shear Force = 180 kN


Load Combination C1

Page 15 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
6.1.3.2 Design

The design is carried out using the 'Concrete Section Design Module' in Prokon.

Page 16 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
Proposed Reinforcement Arrangement

Longitudinal Bars
At Top = 3H25 @ critical supports and 3H16
elsewhere
At Bottom = 3H16 + 1H25 at centre of span and 3H16
= elsewhere
Shear Links = H 8 @ 125 at critical regions and H8@250
elsewhere

Page 17 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
6.1.4 Columns
Only the critical columns presented
6.1.4.1 Analysis Results

Axial Force Diagram

Design axial load for internal column = 933.1 kN


Design axial load for external column = 308.3 kN
Load Combination C1

Bending Moment Diagrams


Internal Column
Design Mx moments = 23.8 kNm At bottom
= 13.25 kNm At top

Design My moments = 14.37 kNm At bottom


= 29.28 kNm At top
External Column
Design Mx moments = -67.3 kNm At bottom
= -19.06 kNm At top

Load Combination C1 Design My moments = 8.6 kNm At bottom


= 20.38 kNm At top

Page 18 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output

6.1.4.2 Design

Internal Column

Page 19 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output

Proposed Reinforcement Arrangement

Longitudinal Bars = 4H25+4H20

Shear Links = H 8 @ 100 in critical regions and H8@300


elsewhere

External Column

Page 20 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output

Same reinforcement applicable as internal columns

Page 21 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
6.2 Foundation
6.2.1 Analysis Results and Design of Raft Slab

6.2.1.1 'Z' Direction

Maximum ultimate moment, Mx Sagging = 72.90 kNm/m

Maximum ultimate moment, Mx Hogging = 50.00 kNm/m


Load combination C1

Maximum ultimate shear, Vy = 60.00 kN/m

Load combination C1

Page 22 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
6.2.1.2 'X' Direction

Maximum ultimate moment, My Sagging = 115.7 kNm/m

Maximum ultimate moment, My Hogging = 40 kNm/m


Load combination C1

Maximum ultimate shear, Vx = 50.00 kN/m

Load combination C1

Page 23 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
6.2.2 Design of Roof Slab
6.2.2.1 'Z' direction Reinforcement

300 mm thick section


Preliminary details and assumptions
Parameter Value
Cnom 50.00 mm
Z' direction Sag. R/F H 16 @ 150 1340 mm2/m
Z' direction Hog. R/F H 16 @ 150 1340
X' direction Sag. R/F H 16 @ 150 1340 mm2/m
X' direction Hog. R/F H 16 @ 150 1340

Design for ultimate condition

Design for Bending

Sagging Reinforcement
Parameter Value
MEd 72.90 kNm/m
b 1000.00 mm
h 300.00 mm
d 242.00 mm
fck 25.00 N/mm2
fyk 500.00 N/mm2
2
k0 0.050 - MEd/bd fck
EC2-1-1 Cl.3.1.7 k0' 0.167 > k0 singly reinforced section
z 230.85
0.95d 229.90
zdesign 229.90 As(req)
As(req),bending 728.95 mm2/m - MEd/0.87fykz 728.95
EC2-1-1Cl.9.3 Asmin 327.18 mm2/m OK mm2/m
Asmax 12000.00 mm2/m OK

Hogging Reinforcement
Parameter Value
MEd 50.00 kNm/m
b 1000.00 mm
h 300.00 mm
d 242.00 mm
fck 25.00 N/mm2
fyk 500.00 N/mm2
2
k0 0.034 - MEd/bd fck
EC2-1-1 Cl.3.1.7 k0' 0.167 > k0 singly reinforced section
z 234.47
0.95d 229.90
zdesign 229.90 As(req)
As(req),bending 499.97 mm2/m - MEd/0.87fykz 499.97
EC2-1-1Cl.9.3 Asmin 327.18 mm2/m OK mm2/m
Asmax 12000.00 mm2/m OK

Page 24 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
Design for Shear

Parameter Value
VEd 60.00 kN/m
b 1000.00 mm
d 242.00 mm
vEd 0.25 N/mm2 - VEd/bd
CRd,c 0.12 - Cl. 6.2.2 EC2-1-1
k 1.91 - -do-
Asl 1340.41 mm2/m - -do-
ρl 0.006 - -do-
fck 25.000 N/mm2
vRd,c 0.550 N/mm2 -do-
2
vRd,c,min 0.46 N/mm -do-
(vRd,c)final 0.55 N/mm2 > vEd No shear R/F OK

Design for Service Condition


A wB
+0
B +C D+9 E+0. +2.
+8.
F +9.5+
+2.8
Deflection

Parameter Value
K 1.50
ρ0 0.0050 - Cl.7.4.2 EC2-1-1
fck 25.00 N/mm2
ρ 0.0030 - Cl.7.4.2 EC2-1-1
(l/d)limit 48.04 - -do-
(l/d)provided 28.93 < (l/d)limit OK
l - Effective span = 7000 mm

Page 25 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
6.2.2.2 'X' direction Reinforcement

300 mm thick section

Preliminary details and assumptions


Parameter Value
Cnom 50.00 mm
Z' direction Sag. R/F H 16 @ 150 1340 mm2/m
Z' direction Hog. R/F H 16 @ 150 1340
X' direction Sag. R/F H 16 @ 150 1340 mm2/m
X' direction Hog. R/F H 16 @ 150 1340

Design for ultimate condition

Design for Bending

Sagging Reinforcement
Parameter Value
MEd 115.70 kNm/m
b 1000.00 mm
h 300.00 mm
d 226.00 mm
fck 25.00 N/mm2
fyk 500.00 N/mm2
2
k0 0.091 - MEd/bd fck
EC2-1-1 Cl.3.1.7 k0' 0.167 > k0 singly reinforced section
z 206.19
0.95d 214.70
zdesign 206.19 As(req)
2
As(req),bending 1289.95 mm /m - MEd/0.87fykz 1289.95
EC2-1-1Cl.9.3 Asmin 305.55 mm2/m Provide Minimum mm2/m
Asmax 12000.00 mm2/m OK

Hogging Reinforcement
Parameter Value
MEd 40.00 kNm/m
b 1000.00 mm
h 300.00 mm
d 226.00 mm
fck 25.00 N/mm2
fyk 500.00 N/mm2
2
k0 0.031 - MEd/bd fck
EC2-1-1 Cl.3.1.7 k0' 0.167 > k0 singly reinforced section
z 219.57
0.95d 214.70
zdesign 214.70 As(req)
As(req),bending 428.29 mm2/m - MEd/0.87fykz 428.29
EC2-1-1Cl.9.3 Asmin 305.55 mm2/m Provide Minimum mm2/m
Asmax 12000.00 mm2/m OK

Page 26 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
Design for Shear

Parameter Value
VEd 50.00 kN/m
b 1000.00 mm
d 226.00 mm 2
vEd 0.22 N/mm - VEd/bd
CRd,c 0.12 - Cl. 6.2.2 EC2-1-1
k 1.94 - -do-
Asl 1340.41 mm2/m - -do-
ρl 0.006 - -do-
2
fck 25.000 N/mm
vRd,c 0.572 N/mm2 -do-
2
vRd,c,min 0.47 N/mm -do-
2
(vRd,c)final 0.57 N/mm > vEd No shear R/F OK

6.2.2.3 Design summary for Roof Slab

300mm uniform thickness

'Z' direction Sagging = H16 @ 150c/c

'Z' direction Hogging = H16 @ 150 c/c

'X' direction Sagging = H16 @ 150 c/c

'X' direction Hogging = H16 @ 150c/c

Detailing will be carried out according to the EC2 guidelines

6.2.3 Check for Bearing Pressure under SLS

Maximum bearing pressure at mid nodes = 20.92/(0.5*0.5)


2
= 83.68 kN/m

Maximum bearing pressure at side nodes = 10.82/(0.5*0.25)


2
86.56 kN/m

Maximum bearing pressure at corner nodes = 6.67/(0.25*0.25)


2
106.72 kN/m

** Since all the calculated values are less than the bearing capacity of 200kN/m2 the bearing capacity check is
satisfied

Page 27 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
6.2.4 Design of Rafter Beams

6.2.4.1 Analysis Results

Bending Moment Diagram


Maximum Bending Moment (Sagging) = 151 kNm

Maximum Bending Moment (Hogging) = 407.3 kNm


Load Combination C1

Shear Force Diagram

Maximum Shear Force = 238.4 kN


Load Combination C1

Page 28 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
6.2.4.2 Design

The design is carried out using the 'Concrete Section Design Module' in Prokon.

Page 29 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Buildings Date: 24.01.2019 R01
Reference Calculations Output
Proposed Reinforcement Arrangement

Longitudinal Bars
At Top = 4H25

At Bottom = 4H25

Shear Links = H8@200

Page 30 of 30
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output

DESIGN OF WORKSHOP AND WAREHOUSE BUILDING

2
The proposed building is a single storey building with 100m plan area. It is composed of ground slab,
perimeter and partition walls with bricks or blocks and steel roof supported on concrete columns. The
ground level in the area is planned to be raised up to +4.5m MSL and the building is therefore
supported on the filled ground. A well compacted and controlled backfill has proposed in the area. A
raft foundation is proposed for the building. Ground beams are provided in the perimeter of the raft and
the roof supporting columns will be started from the ground beams.
This report presents the design of all structural components of the building.

1 References and Software

- EN 1990 (EC0)
Basis of structural design

- EN 1991 (EC1)
Actions on structures

- EN 1992 (EC2)
Design of concrete structures

- EN 1993 (EC3)
Design of steel structures

- EN 1996 (EC6)
Design of masonry structures

- EN 1997 (EC7)
Geotechnical design

- EN 206-1:2000
Concrete - Part 1: Specification, performance, production and conformity

- EN 197-1
Cement - Part 1: Composition, specifications and conformity criteria for common cements

- Sri Lnaka National Annex to EN 1991 (SLNA EC1)

- Sri Lanka National Annex to EN 1992 (SLNA EC2)

- Reinforced concrete design to Eurocodes (RCDE)


Prab Bhatt, Thomas J. MacGinley, Ban Seng Choo - 4th Edition

- Foundation Analysis and Design (FAD)


Joseph E. Bowles, P.E., S.E - Fifth Edition

- Standard Method of Detailing Structural Concrete (IstructEM)


Institution of Structural Engineers UK

- Employer's Requirements (ERQ)

- Software
- PROKON 3.0
- Auto Cad 2016
- MS Excel 2013

Page 1 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
2 Design Data and Parameters
2.1 Material Properties
3
EC1-Table A.1 Density of Concrete (ϒc) = 24 kN/m

ERQ- Cl..2.2.7.3 Type of cement = Ordinary Portland Cement


Cl.3.6.3.1 CEM I according to EN 197
G5056- P.16

3
ERQ-VI-3-16 Density of Water (ϒw) = 10 kN/m
3
do Compacted soil density (Backfill) (ϒs) = 20 kN/m
0
FAD-Table2-6 Angle of shearing resistance for backfill material (φ k) = 30
(Type I or II soil- gravel sand mix as per ICTAD
SCA/5, Engineering classification - GW )

2.2 Durability Requirements

2.2.1 Foundation

EC2-Table 4.1 Exposure class related to environmental conditions = XC2


where, concrete surfaces subject to long-term water contact - many foundations

EC2-Table E.1N Minimum strength class of concrete = C25/30


3
EN206- Table F.1 Minimum cement content = 400 kg/m
ERQ- 3.6.4.4 Maximum Water to Cement ratio = 0.55

EC2-4.4.1.2(5) Structural class for design working life of 50 years = S4

ERQ-VI-3-6 Required design life = 60 years

Increasing structural class by 1 as per the recommendations given in Table 4.3N EC2

Design structural class = S5

EC2-Table 4.4N Minimum cover with regard to durability (cmin,dur) = 30 mm

SLNAEC2- Additive safety element (Δcdur,ϒ) = 0 mm


Table NA.1
EC2-Cl.4.4.1.2 Δcdur,st = 0 mm
(7),(8) Δcdur,add = 0 mm

EC2-Table 4.2 Minimum cover with regard to bond (cmin,b) = 20 mm

Eqn 4.2 Minimum cover (cmin) = max{cmin,b;cmin,dur+Δcdur,ϒ-Δcdur,st-Δcdur,add;10 mm}

= 30 mm
SLNAEC2- Δcdev = 10 mm
Table NA.1
Nominal cover (cnom) = cmin+Δcdev
= 40 mm
EN1596 Nominal cover to be provided = 50 mm
Cl.7.6.4.1

Page 2 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
2.2.2 Columns, beams and slabs (design as normal structural elements)

EC2-Table 4.1 Exposure class related to environmental conditions = XC3


where, concrete inside buildings with moderate or high air humidity

EC2-Table E.1N Minimum strength class of concrete = C25/30


3
EN206- Table F.1 Minimum cement content = 320 kg/m
ERQ- 3.6.4.4 Maximum Water to Cement ratio = 0.55

EC2-4.4.1.2(5) Structural class for design working life of 50 years = S4

ERQ-VI-3-6 Required design life = 60 years

Increasing structural class by 1 as per the recommendations given in Table 4.3N EC2

Reducing class by 2 considering member with slab geometry and special quality control
of the concrete production

Design structural class = S3

EC2-Table 4.4N Minimum cover with regard to durability (cmin,dur) = 20 mm

SLNAEC2- Additive safety element (Δcdur,ϒ) = 0 mm


Table NA.1

EC2-Cl.4.4.1.2 Δcdur,st = 0 mm
(7),(8) Δcdur,add = 0 mm

EC2-Table 4.2 Minimum cover with regard to bond (cmin,b) = 20 mm

Eqn 4.2 Minimum cover (cmin) = max{cmin,b;cmin,dur+Δcdur,ϒ-Δcdur,st-Δcdur,add;10 mm}

= 20 mm

SLNAEC2- Δcdev = 10 mm
Table NA.1
Nominal cover (cnom) = cmin+Δcdev cnom
= 30 mm 30 mm

2.3 Crack width control

Maximum allowable crack width for normal reinforced = 0.3 mm


EC2-Table 7.1N concrete members with exposure class XC2 or XC3

No special calculations are required for crack width as it is generally assumed to be limited by following the
reinforcement detailing rules according to EC2.

Page 3 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
3 Main structural features of the proposed building

FIG 01 PLAN VIEW

FIG 02 SECTIONS

Page 4 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output

FIG 03 Prokon 3D model

Page 5 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
4 Actions

4.1 Load cases

DL - All permanent actions on the structure

Self weight of structural elements = This action will automatically be


calculated by the program based
on the assigned material densities

2
Weight of Zn/Al roof cladding = 0.05 kN/m

Allowance for self weight of 'C' purlin = 5 kg/m


= 0.05 kN/m

Load from 225mm thick 3.5m high brick = 22.6*225*3.5/1000


masonry wall = 17.80 kN/m

IL - Imposed load

On Ground Slab
2
ERQ Total floor area = 10.00 kN/m
EC1-Table 6.1

On roof
2
EC1-1-1 Roofs not accessible except for normal maintenance = 0.40 kN/m
Table 6.10 and repair

4.2 Load combinations

Ultimate combinations

COM1 - 1.35*DL + 1.5*IL

Page 6 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
5 Support Conditions

The raft is supported on well compacted soil and the analysis will be carried out using modulus of subgrade reaction
theory. The modulus is used to compute node springs based on the contributing plan area of an element to any node.

Calculation of modulus of subgrade reaction is based on the properties of filling material.


It is conservatively taken here the allowable bearing capacity of the filled ground is 200kN/m2 and the value of
modulus of subgrade reaction is calculated for a 25.4mm settlement.

Note-: The assumed value of allowable bearing capacity need to be verified by doing a plate load test upon
the completion of fill.

Therefore,
3
FAD- 9-6 ks = 40*(SF)*qa kN/m
= 40*3*200
3
= 24000 kN/m
FAD- 10-5
Ki = ks * Effective Area
For 0.5m x 0.5m shell element model of the raft,

Kcorner = 1500 kN/m

Kside = 3000 kN/m

Kinterior = 6000 kN/m

Page 7 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
6.0 Analysis results and designs of structural components of the building

6.1 Steel Roof

6.1.1 Model Input

2.3m

10m

Page 8 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
6.1.2 Output Results

Page 9 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
6.1.2 Design

Page 10 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output

Page 11 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output

Page 12 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
6.2 Concrete Structure

Page 13 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
6.2.1 Analysis Results and Design of Raft Slab

6.2.1.1 'Z' Direction

Maximum ultimate moment, Mx Sagging = 8.40 kNm/m

Maximum ultimate moment, Mx Hogging = 16.50 kNm/m


Load combination C1

Maximum ultimate shear, Vy = 35.90 kN/m

Load combination C1

Page 14 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
6.2.1.2 'X' Direction

Maximum ultimate moment, My Sagging = 14.6 kNm/m

Maximum ultimate moment, My Hogging = 13.4 kNm/m


Load combination C1

Maximum ultimate shear, Vx = 30.00 kN/m

Load combination C1

Page 15 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
6.2.1.3 Deflection

Deflection not critical

Page 16 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
6.2.1.4 Design of Raft Slab
6.2.1.4.1 'Z' direction Reinforcement

200 mm thick section


Preliminary details and assumptions
Parameter Value
Cnom 50.00 mm
2
Z' direction Sag. R/F H 10 @ 200 393 mm /m
Z' direction Hog. R/F H 10 @ 200 393
X' direction Sag. R/F H 10 @ 200 393 mm2/m
X' direction Hog. R/F H 10 @ 200 393

Design for ultimate condition

Design for Bending

Sagging Reinforcement
Parameter Value
MEd 8.40 kNm/m
b 1000.00 mm
h 200.00 mm
d 145.00 mm
2
fck 25.00 N/mm
fyk 500.00 N/mm2
2
k0 0.016 - MEd/bd fck
EC2-1-1 Cl.3.1.7 k0' 0.167 > k0 singly reinforced section
z 142.93
0.95d 137.75
zdesign 137.75 As(req)
2
As(req),bending 140.18 mm /m - MEd/0.87fykz 140.18
EC2-1-1Cl.9.3 Asmin 196.04 mm2/m OK mm2/m
Asmax 8000.00 mm2/m OK

Hogging Reinforcement
Parameter Value
MEd 16.50 kNm/m
b 1000.00 mm
h 200.00 mm
d 145.00 mm
fck 25.00 N/mm2
fyk 500.00 N/mm2
k0 0.031 - MEd/bd2fck
EC2-1-1 Cl.3.1.7 k0' 0.167 > k0 singly reinforced section
z 140.87
0.95d 137.75
zdesign 137.75 As(req)
As(req),bending 275.36 mm2/m - MEd/0.87fykz 275.36
EC2-1-1Cl.9.3 Asmin 196.04 mm2/m OK mm2/m
2
Asmax 8000.00 mm /m OK

Page 17 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
Design for Shear

Parameter Value
VEd 35.90 kN/m
b 1000.00 mm
d 145.00 mm 2
vEd 0.25 N/mm - VEd/bd
CRd,c 0.12 - Cl. 6.2.2 EC2-1-1
k 2.00 - -do-
2
Asl 392.70 mm /m - -do-
ρl 0.003 - -do-
fck 25.000 N/mm2
vRd,c 0.454 N/mm2 -do-
2
vRd,c,min 0.49 N/mm -do-
(vRd,c)final 0.49 N/mm2 > vEd No shear R/F OK

Design for Service Condition


A wB
+0
B +C D+9 E+0. +2.
+8.
F +9.5+
+2.8
Deflection

Parameter Value
K 1.50
ρ0 0.0050 - Cl.7.4.2 EC2-1-1
2
fck 25.00 N/mm
ρ 0.0010 - Cl.7.4.2 EC2-1-1
(l/d)limit 279.18 - -do-
(l/d)provided 34.48 < (l/d)limit OK
l - Effective span = 5000 mm

Page 18 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
6.2.1.4.2 'X' direction Reinforcement

200 mm thick section

Preliminary details and assumptions


Parameter Value
Cnom 50.00 mm
2
Z' direction Sag. R/F H 10 @ 200 393 mm /m
Z' direction Hog. R/F H 10 @ 200 393
2
X' direction Sag. R/F H 10 @ 200 393 mm /m
X' direction Hog. R/F H 10 @ 200 393

Design for ultimate condition

Design for Bending

Sagging Reinforcement
Parameter Value
MEd 14.60 kNm/m
b 1000.00 mm
h 200.00 mm
d 135.00 mm 2
fck 25.00 N/mm
2
fyk 500.00 N/mm
2
k0 0.032 - MEd/bd fck
EC2-1-1 Cl.3.1.7 k0' 0.167 > k0 singly reinforced section
z 131.07
0.95d 128.25
zdesign 128.25 As(req)
As(req),bending 261.70 mm2/m - MEd/0.87fykz 261.70
EC2-1-1Cl.9.3 Asmin 182.52 mm2/m Provide Minimum mm2/m
Asmax 8000.00 mm2/m OK

Hogging Reinforcement
Parameter Value
MEd 13.40 kNm/m
b 1000.00 mm
h 200.00 mm
d 135.00 mm
fck 25.00 N/mm2
fyk 500.00 N/mm2
2
k0 0.029 - MEd/bd fck
EC2-1-1 Cl.3.1.7 k0' 0.167 > k0 singly reinforced section
z 131.40
0.95d 128.25
zdesign 128.25 As(req)
2
As(req),bending 240.19 mm /m - MEd/0.87fykz 240.19
EC2-1-1Cl.9.3 Asmin 182.52 mm2/m Provide Minimum mm2/m
Asmax 8000.00 mm2/m OK

Page 19 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
Design for Shear

Parameter Value
VEd 30.00 kN/m
b 1000.00 mm
d 135.00 mm
vEd 0.22 N/mm2 - VEd/bd
CRd,c 0.12 - Cl. 6.2.2 EC2-1-1
k 2.00 - -do-
Asl 392.70 mm2/m - -do-
ρl 0.003 - -do-
2
fck 25.000 N/mm
2
vRd,c 0.465 N/mm -do-
vRd,c,min 0.49 N/mm2 -do-
(vRd,c)final 0.49 N/mm2 > vEd No shear R/F OK

6.2.1.4.3 Design summary for Raft Slab

300mm uniform thickness

'Z' direction Sagging = H10 @ 200c/c

'Z' direction Hogging = H10 @ 150 c/c

'X' direction Sagging = H10 @ 200c/c

'X' direction Hogging = H10 @ 200c/c

Detailing will be carried out according to the EC2 guidelines

6.2.1.5 Check for Bearing Pressure under SLS

Maximum bearing pressure at mid nodes = 17.27/(0.5*0.5)


2
= 69.08 kN/m

Maximum bearing pressure at side nodes = 9.97/(0.5*0.25)


2
79.76 kN/m

Maximum bearing pressure at corner nodes = 5.58/(0.25*0.25)


2
89.28 kN/m

** Since all the calculated values are less than the bearing capacity of 200kN/m2 the bearing capacity check is
satisfied

Page 20 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
6.2.2 Design of Raft Beams

6.2.2.1 Analysis Results

Bending Moment Diagram


Maximum Bending Moment (Sagging) = 20 kNm

Maximum Bending Moment (Hogging) = 43.34 kNm


Load Combination C1

Shear Force Diagram

Maximum Shear Force = 42.08 kN


Load Combination C1

Page 21 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
6.2.2.2 Design

The design is carried out using the 'Concrete Section Design Module' in Prokon.

Page 22 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
Proposed Reinforcement Arrangement

Longitudinal Bars
At Top = 3H16 (=603.19mm2)
At Bottom = 3H16 (=603.19mm2)
Shear Links = H 8 @ 250

Page 23 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
6.2.3 Analysis Results and Design of Columns

6.2.3.1 Analysis Results

Axial Force Diagram

Design axial load = 75.31 kN

Load Combination C1

Bending Moment Diagrams

Design Mx moments = 19.61 kNm At bottom


= 3.91 kNm At top

Design My moments = 20.82 kNm At bottom


= 11.57 kNm At top
Load Combination C1

Page 24 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output

6.2.3.2 Design

Page 25 of 26
Project Design and Building of St. Sebastian North Lock Gates and
CHINA GEO ENGINEERING CORPORATION Pumping Station Calc by CDM
Contract.No: MCUDP/SLLRDC/W/12 Che by DAJ
Component Ancillary Building Date: 31.01.2019
Reference Calculations Output
Proposed Reinforcement Arrangement

Longitudinal Bars = 8H16


=

Shear Links = H 8 @ 275

Page 26 of 26
)4.5
0
01
15 H C
W

40 A
IT

kV N
A OP
GE Y
N. -01

40 TAN HT
00 K =1
HE

L =0 .5m
FU 2
IG
02

EL

40 TAN HT
0 0 K =1
HE

L = .5m
FU 01
IG

EL
15 H
W

40 CA
IT

kV N

04
A OP

PR LE
GE Y

SI
IM NC
N. - 01

AR ER
Y
(P
04

LI
NT
H)

PR LEN
SI
IM C
AR ER
Y

SE SIL
20 NE
GE

CO EN
0K R

ND CE
VA AT

AR R
LV R

Y
O
3 GENERATOR ROOM

SE SIL
CO EN
ND CE
AR R
4

Y
5

PR LE
SI
IM NC
6

AR ER
Y
PR LEN
SI
IM C
AR ER
4 WORK SHOP

Y
W1

SE SIL
SY EI

CO
NC GH
H
F.G
W1

ND CE
PA T=2

EN

AR R
NE m

Y
L

SE SIL
L.(+

CO EN
N CE
D R
A
RY
01

)4.5
0
04
WARE HOUS
E
W1

03
D1
03

WORKSHOP W1
02

03
RD1

1:20 slope

F.G
L.(+
)4.5
0
CO-ORDINATES OF WORKSHOP & STORES CO-ORDINATES OF GENERATOR ROOM
01 - X=400999.4881 Y=495126.3193 01 - X=400997.4381 Y=495150.0143
02 - X=401007.5749 Y=495120.4368 02 - X=401000.4272 Y=495136.2860
03 - X=401013.4575 Y=495128.5235 03 - X=401014.8395 Y=495139.4239
04 - X=401005.3707 Y=495134.4061 04 - X=401011.8261 Y=495153.1470
THE ORIGINAL DRAWING IS IN A1 SIZE
C COPYRIGHT OF CHINA GEO

CONSULTANT: CONTRACTOR : DRAWING TITLE : CLIENT :


DESIGN : DRAWN : CHECKED : THE GOVERNMENT OF THE DEMOCRATIC SOCIALIST
REPUBLIC OF SRI LANKA
CHINA GEO ENGINEERING LAYOUT PLAN FOR MINISTRY OF MEGAPOLIS &WESTERN DEVELOPMENT
CDM BKIJ DAJ
DOHWA - MAHAB GHODSS JV CORPORATION GENERATOR ROOM , .................................... .................................... ....................................
PROJECT :
METRO COLOMBO URBAN DEVELOPMENT PROJECT
MAIN OFFICE : Buiding B, No. 92, Xiangshan South Road,
WORKSHOP AND STORES RECOMMENDED : APPROVED : DATE :
DESIGN AND BUILDING OF ST .SEBASTIAN
1 2nd ISSUE- Incorporating latest M&E revisions . 31-01-19
Haidian District,Beijing, China. Post Code 100093 NORTH LOCK GATES AND PUMPING STATION
FIRST ISSUE- INCORPORATING COMMENTS
0 Ref:DH-KOR-MCUDP-LKA-170904-133 05-07-18 RESIDENT OFFICE : 93/1,Alwitigala mawatha TEL : (86-10) 82408500, FAX : (86-10) 82408544
Colombo - 08, Sri Lanka. SCALE PLANT : FILE NAME DRAWING NO. REV.
RESIDENT OFFICE : 6th floor,meewalla building, LULIANG LIULAIFU 01-12-2017
NO. DESCRIPTION DATE INITS. .................................... ....................................
REVISION DETAILS
Colombo - 04, Sri Lanka.
TEL : +94 11 2366882 , FAX : +94 11 2367516 PAPER : A1
....................................
COMPLETED DATE
MCUDP/NLGPS/001 MCUDP/NLGPS/D/DWG/G/004/01 1
Water proofing coat and sloping
cement sand rendering (1:3)for
1:150 Slope 1:150 Slope water draining SCHEDULE OF DOORS & WINDOWS
SIZE
TYPE DESCRIPTION
(WXH)

D1 2000x2100 SOUNDPROOF DOUBLE DOOR WITH FIXED ALU.


LOUVERS ABOVE

D2 900 x 1500 ALUMINIUM DOOR

V1 2700x3300 VENTILATION FOR FRESH AIR INTAKE

V2 2700x3300 VENTILATION FOR HOT AIR DISCHARGE

400 SIDE ELEVATION RCC SLAB


FRONT ELEVATION 200
1:150 Slope 1:150 Slope

650
PRIMARY SECONDARY
Down pipe SILENCER SILENCER
HOT AIR DUCT
2700x3300 Wall 1540kVA
GEN 900 900 2700x3300 WALL
Opening for

4300
CANOPY OPENING FOR
fresh air intake
HOT AIR DISCHARGE

2700
4100
3000

3100
1500

1500
WALL OPENING FOR
D1 FRESH AIR INTAKE FRESH AIR HOT AIR
SIDE 100mm Thk.PLINTH SIDE

(F.G.L.)=4.50 MSL (F.F.L.)=4.60 MSL


3600 WALL OPENING

400

100

400
FOR HOT AIR
SECTION A-A
DISCHARGE
1200

SYNC PANEL
A 200KVA
1400

HEIGHT=2m
3850

LV GENERATOR
4000
AREA WALLS CEILING FLOOR

D2 D2 EXTERNAL WALLS ARE TO BE OF 200mm HOLLOW CEMENT BLOCK WORK.


EXTERNAL WALL SURFACE ARE TO SEMI ROUGH FINISHED CEMENT PLASTER
IN CEMENT MORTAR 1:5 MIX AND FINISH WITH WHITE COLOUR PRIMER COAT
1225 12575 A & TWO COATS OF APPROVED WEATHER RESISTANT EMULSION PAINT.
INTERNAL WALLS ARE TO BE OF 100mm SOLID CEMENT BLOCK AND SURFACES
ARE TO BE SMOOTH FINISHED CEMENT SAND PLASTER (OR WALL PUTTY)
MINERAL FIBRE OR FIBRE CEMENT
TO SRI LANKAN STANDARDS. POWER TROWEL SMOOTH FINISH.
3600

3300

WHITE COLOUR PAINTED WITH A PRIMER COAT & TWO COATS OF EMULSION
V1 PAINT.
V1
1540kVA GEN.
A 14050

WITH CANOPY -01


X 4325 D2 D2 X 225/200mm Brick/Block work
with 1:5 cement sand mortar
(PLINTH) Internal plaster
1700

with 1:5 cement sand External plaster with 1:5 cement


mix finish and panted sand mix semi rough finish and
with two coats of painted with two coats of approved
D2 D2 emulsion paint weather resistant emulsion paint

1225 12575 Plinth plaster with 1:3 cement sand


mix and painted with two coats of GENERAL NOTES:
DPC with two Bitumen coat
weather resistant floor paint 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS.
12mm Expansion joint fill with 2. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH RELEVANT
Power trowel mastic filler MECHANICAL & ELECTRICAL DRAWINGS.
3600

3300

V1 V1 smooth finish 1200


A 3. REFER STANDARD DRAWINGS Nos. MCUDP/NLGPS/D/DWG/S/01 TO 10

32
75
200 FOR DETAIL NOTES
F.F.L 4.60 SLOPE 1: 100 F.G.L
4. STRUCTURAL CONCRETE SHALL BE
1540kVA GEN. a. C25/30 FOR SLAB ,BEAMS AND COLUMNS.

VARIES
min.150
Reinforce with
WITH CANOPY-01 A142 B.R.C. d. C16/20 FOR BLINDING CONCRETE
1075 75 Steel mesh
CONCRETE COVER SHALL BE

75
4325 D2 D2 a. 50mm FOR GROUND SLAB AND BEAMS .
850

Ground Slab
(PLINTH) 350 b. 30mm FOR OTHER BEAMS AND COLUMNS.
Gauge 1000 Polythene sheet 5. THE GROUND SLAB SHALL BE FOUND ON 50mm THICK BLINDING
Gauge 1000
Polythene sheet Grade 25 Concrete with a 142 BRC CONCRETE OVERLYING GAUGE 1000 POLYTHENE SHEET .
Steel mesh and cement rendered to 6. DESIGNED BEARING CAPACITY OF SOIL IS 200kN/m2 AND THIS SHALL BE
14750 match floor tile colour VERIFIED BY A PLATE LOAD TEST AFTER COMPLETING OF BACKFILL .
FLOOR PLAN TYPICAL MASONRY WALL AND PLINTH DETAIL
1:20
1:50
THE ORIGINAL DRAWING IS IN A1 SIZE
C COPYRIGHT OF CHINA GEO

CONSULTANT: CONTRACTOR : DRAWING TITLE : CLIENT :


DESIGN : DRAWN : CHECKED : THE GOVERNMENT OF THE DEMOCRATIC SOCIALIST
REPUBLIC OF SRI LANKA
CHINA GEO ENGINEERING MINISTRY OF MEGAPOLIS &WESTERN DEVELOPMENT
CORPORATION
ARCHITECTURAL DETAILS OF CDM
.................................... BKIJ
....................................
DAJ
....................................
DOHWA - MAHAB GHODSS JV GENERATOR BUILDING PROJECT :
METRO COLOMBO URBAN DEVELOPMENT PROJECT
2 THIRD ISSUE- Incorporating latest M&E revisions . 31-01-19 RECOMMENDED : APPROVED : DATE :
SECOND ISSUE- Incorporating comments MAIN OFFICE : Buiding B, No. 92, Xiangshan South Road, SHEET 01 OF 01 DESIGN AND BUILDING OF ST .SEBASTIAN
1 05-07-18 Haidian District,Beijing, China. Post Code 100093 NORTH LOCK GATES AND PUMPING STATION
Ref:DH-KOR-MCUDP-LKA-170904-133
TEL : (86-10) 82408500, FAX : (86-10) 82408544
0 FIRST ISSUE 18-12-17 RESIDENT OFFICE : 93/1,Alwitigala mawatha SCALE PLANT : FILE NAME DRAWING NO. REV.
RESIDENT OFFICE : 6th floor,meewalla building, LIULAIFU 01-12-2017
NO. DESCRIPTION DATE INITS. Colombo - 08, Sri Lanka. LULIANG .................................... ....................................
REVISION DETAILS
Colombo - 04, Sri Lanka.
TEL : +94 11 2366882 , FAX : +94 11 2367516
AS SHOWN
PAPER : A1
....................................
COMPLETED DATE
MCUDP/NLGPS/04 MCUDP/NLGPS/D/DWG/A/04/001 2
1 2 3
1 2 3
A C C

ZN/AL Roof sheet


"C" Channel
P.V.C gutter Steel truss

9.50 MSL

20°
Mineral fiber or
fibro cement
ceiling

7633
4600
(F.G.L.)=
4.50 MSL (F.F.L.)=4.60 MSL

FRONT ELEVATION REAR ELEVATION SECTION A-A 1:60

1 2 3
A

10000

W1 W1
AREA WALLS CEILING FLOOR
C
SCHEDULE OF DOORS & WINDOWS
EXTERNAL WALLS ARE TO BE OF 200mm HOLLOW CEMENT BLOCK WORK.
TYPE
SIZE
DESCRIPTION A EXTERNAL WALL SURFACE ARE TO SEMI ROUGH FINISHED CEMENT PLASTER MINERAL FIBRE
POWER TROWEL
(WXH) IN CEMENT MORTAR 1:5 MIX AND FINISH WITH WHITE COLOUR PRIMER COAT OR FIBRE CEMENT
ALUM. FRAME GLAZED & ALU. DOUBLE SASH & TWO COATS OF APPROVED WEATHER RESISTANT EMULSION PAINT. TO SRI LANKAN SMOOTH FINISH.
D1 1500 x 2400 DOOR INTERNAL WALLS ARE TO BE OF 100mm SOLID CEMENT BLOCK AND STANDARDS.
A WITH FIXED ALU. LOUVERS ABOVE SURFACES ARE TO BE SMOOTH FINISHED CEMENT SAND PLASTER (OR WALL
4475

W1 RD1 3000 x 3000 ALUMINIUM ROLLER SHUTTER


PUTTY) WHITE COLOUR PAINTED WITH A PRIMER COAT & TWO COATS OF
EMULSION PAINT.
WARE HOUSE
W1 1800 x 1650 ALUM. FRAME GLAZED & ALU. WINDOW
WITH FIXED ALU. LOUVERS ABOVE

B
D1 225/200mm Brick/Block work
with 1:5 cement sand mortar
Internal plaster
with 1:5 cement sand External plaster with 1:5 cement
mix finish and panted sand mix semi rough finish and
with two coats of painted with two coats of approved
emulsion paint weather resistant emulsion paint GENERAL NOTES:
Plinth plaster with 1:3 cement sand 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS.

A W1 DPC with two Bitumen coat


mix and painted with two coats of
weather resistant floor paint
2. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH RELEVANT
MECHANICAL & ELECTRICAL DRAWINGS.
5525

12mm Expansion joint fill with 3. REFER STANDARD DRAWINGS Nos. MCUDP/NLGPS/D/DWG/S/01 TO 10
Power trowel mastic filler
WORKSHOP FOR DETAIL NOTES
smooth finish 1200 4. STRUCTURAL CONCRETE SHALL BE

32
75
F.F.L 4.60 SLOPE 1: 100 200 F.G.L a. C25/30 FOR SLAB ,BEAMS AND COLUMNS.
d. C16/20 FOR BLINDING CONCRETE

VARIES
min.150
Reinforce with

75
A142 B.R.C. CONCRETE COVER SHALL BE
Steel mesh
a. 50mm FOR GROUND SLAB AND BEAMS .

75
b. 30mm FOR OTHER BEAMS AND COLUMNS.
RD1 Ground Slab
A 350 5. THE GROUND SLAB SHALL BE FOUND ON 50mm THICK BLINDING
Gauge 1000 Polythene sheet CONCRETE OVERLYING GAUGE 1000 POLYTHENE SHEET .
Gauge 1000
Polythene sheet Grade 25 Concrete with a 142 BRC 6. DESIGNED BEARING CAPACITY OF SOIL IS 200kN/m2 AND THIS SHALL BE
A

Steel mesh and cement rendered to VERIFIED BY A PLATE LOAD TEST AFTER COMPLETING OF BACKFILL .
match floor tile colour
TYPICAL MASONRY WALL AND PLINTH DETAIL
FLOOR PLAN 1:20
THE ORIGINAL DRAWING IS IN A1 SIZE
C COPYRIGHT OF CHINA GEO 1:50
CONSULTANT: CONTRACTOR : DRAWING TITLE : CLIENT :
DESIGN : DRAWN : CHECKED : THE GOVERNMENT OF THE DEMOCRATIC SOCIALIST
REPUBLIC OF SRI LANKA
CHINA GEO ENGINEERING MINISTRY OF MEGAPOLIS &WESTERN DEVELOPMENT
CORPORATION
ARCHITECTURAL DETAILS CDM
.................................... BKIJ
....................................
DAJ
....................................
DOHWA - MAHAB GHODSS JV WORKSHOP AND STORE BUILDING PROJECT :
METRO COLOMBO URBAN DEVELOPMENT PROJECT
2 THIRD ISSUE- Incorporating latest M&E revisions . 31-01-19
RECOMMENDED : APPROVED : DATE :
SECOND ISSUE- Incorporating comments MAIN OFFICE : Buiding B, No. 92, Xiangshan South Road, SHEET 01 OF 01 DESIGN AND BUILDING OF ST .SEBASTIAN
1 05-07-18 Haidian District,Beijing, China. Post Code 100093 NORTH LOCK GATES AND PUMPING STATION
Ref:DH-KOR-MCUDP-LKA-170904-133
TEL : (86-10) 82408500, FAX : (86-10) 82408544
0 FIRST ISSUE 18-12-17 RESIDENT OFFICE : 93/1,Alwitigala mawatha SCALE PLANT : FILE NAME DRAWING NO. REV.
RESIDENT OFFICE : 6th floor,meewalla building, LIULAIFU 01-12-2017
NO. DESCRIPTION DATE INITS. Colombo - 08, Sri Lanka. LULIANG .................................... ....................................
REVISION DETAILS
Colombo - 04, Sri Lanka.
TEL : +94 11 2366882 , FAX : +94 11 2367516
AS SHOWN
PAPER : A1
....................................
COMPLETED DATE
MCUDP/NLGPS/04 MCUDP/NLGPS/D/DWG/A/04/002 2
70H16-01a-150-T2

70H16-01-150-B2
1 2 3
1 2 2

7375 7375
14850

GB1 (500x600)
C
C
C1 C1 C1
8525

73H16-02a-150-T1
02a
GB2 (500x600)

GB2 (500x600)

GB2 (500x600)
14150

14050
C1 GB1 (500x600)
C1
Y Y
B
B

73H16-02-150-B1
02

01
5525

01a

GB1 (500x600)
C1
A
C1
C1 A

14750
GROUND BEAM LAYOUT PLAN
1:50
GB1 (500x600) 300 mm THK.GROUND SLAB
1 1:40 2 3
500
1:50

H25
H25
H25
H25
1 02a
4H25 4H25
H8@200
600

H8@200 H8@200 01a 01a


H25

H25
H25
H25

300
1 SECTION 1-1
4H25 4H25 1:20 01 01
GB1 (500x600) 02
A 1:40 B C 500

SECTION Y-Y
H25
H25
H25
H25

1
4H25 4H25
H8@200
600

H8@200 H8@200
H25

H25
H25
H25

1 SECTION 1-1
THE ORIGINAL DRAWING IS IN A1 SIZE 4H25 4H25 1:20
C COPYRIGHT OF CHINA GEO

CONSULTANT: CONTRACTOR : DRAWING TITLE : CLIENT :


DESIGN : DRAWN : CHECKED : THE GOVERNMENT OF THE DEMOCRATIC SOCIALIST
REPUBLIC OF SRI LANKA
CHINA GEO ENGINEERING MINISTRY OF MEGAPOLIS &WESTERN DEVELOPMENT
CORPORATION STRUCTURAL DETAILS OF CDM
.................................... BKIJ
....................................
DAJ
....................................
DOHWA - MAHAB GHODSS JV GENERATOR BUILDING PROJECT :
METRO COLOMBO URBAN DEVELOPMENT PROJECT
2 THIRD ISSUE- Incorporating latest M&E revisions . 31-01-19 RECOMMENDED : APPROVED : DATE :
SECOND ISSUE- Incorporating comments MAIN OFFICE : Buiding B, No. 92, Xiangshan South Road,
Haidian District,Beijing, China. Post Code 100093
Sheet 01 of 02 DESIGN AND BUILDING OF ST .SEBASTIAN
1 05-07-18 NORTH LOCK GATES AND PUMPING STATION
Ref:DH-KOR-MCUDP-LKA-170904-133
TEL : (86-10) 82408500, FAX : (86-10) 82408544
0 FIRST ISSUE 18-12-17 RESIDENT OFFICE : 93/1,Alwitigala mawatha SCALE PLANT : FILE NAME DRAWING NO. REV.
RESIDENT OFFICE : 6th floor,meewalla building, LIULAIFU 01-12-2017
NO. DESCRIPTION DATE INITS. Colombo - 08, Sri Lanka. LULIANG .................................... ....................................
REVISION DETAILS
Colombo - 04, Sri Lanka.
TEL : +94 11 2366882 , FAX : +94 11 2367516
AS SHOWN
PAPER : A1
....................................
COMPLETED DATE
MCUDP/NLGPS/04 MCUDP/NLGPS/D/DWG/C&S/04/001 2
70H16-03b-150-T2
70H12-03-200-B2
70H12-03-200-T2

70H12-03-200-T2
1 2 3

7375 7375 1 2 2

14750

RB1 (300x500)
COLUMN SCHEDULE
C

500
C1 C1 C1 TYPE
COLUMN C

73H12-04a-200-T1
REFERENCE

1500
C1 3000
04a

03b
SFL+8.90

400x500 Roof beam


8525

H8@100
1500 1500

1000
03a 03a

RB2 (300x500)

1.5 x tension lap (min.)


RB2 (300x500)

RB2 (300x500)

H8@250
4H20+ 4H25
14050

C1 A-A

14050
C1 RB1 (300x500)
Z Z
B

H8@100

1000

3226
B
SSL+4.60 73H16-04b-150-T1
04b 73H12-04-200-B1
500x600 ground beam
04
5525

COLUMN 03
STARTER

300
H25 H20 H25

RB1 (300x500)

300
C1 H20 H20

1500
C1
A 73H12-04a-200-T1
C1 H25 H20 H25
04a
SECTION A-A A
ROOF BEAM LAYOUT PLAN
1:50 500 14750

200 mm THK.ROOF SLAB


RB1 (300x500) 1:50
1 2 3
1:40
300 300 03c 03a
03a 03c

H16
H16
H16

H25
H25
H25
1 2
1500 3H16 3000 3H25 3H16 04b
H8@250 H8@125 03a 03b 03a

500

500
03c 03b 03c
03 03
H8@125 H8@250 H8@125 H8@125 H8@250 H8@125

H16

H16
H25
H16

H16
H16

H16
4000 4000

200
1 2 SECTION 1-1 SECTION 2-2
3H16 1H25 3H16 1H25 3H16 1:20 1:20 04
NOTES
RB2 (300x500) 1. PLEASE REFER STANDARD DRAWINGS Nos. MCUDP/NLGPS/D/DWG/S/01 TO 10 FOR DETAIL NOTES.
1 2 3 2. LAP LENGTHS SHOULD NOT BE LESS THAN 50 TIMES THE SMALLER BAR DIAMETER.
1:40 3. ANCHORAGE LENGTH SHOULD NOT BE LESS THAN 40 TIMES THE BAR DIAMETER UNLESS
OTHERWISE SPECIFIED.
1 2 300 300
4. CHARACTERISTIC STRENGTH OF HIGH YIELD STEEL BARS SHALL BE
1500 3H16 3000 3H25 3H16
H16
H16
H16

H25
H25
H25
500 N/mm2 .

H8@250 H8@125 5. NOTATION TO REINFORCEMENT IS AS FOLLOWS:


H8@125 H8@250 H8@125 H8@125 H8@250 H8@125
500

500
2 H 20 - 01 - 250 - T1
4000 4000
H16

H16
H25
H16

H16
H16

H16
1 2 No. OF BARS
3H16 1H25 1H25 3H16 SECTION 1-1 SECTION 2-2 BAR LOCATION
1:20 1:20 BAR SPACING
TYPE OF STEEL

BAR DIAMETER BAR MARK

6. DISTRIBUTION BARS OF H10@200 SHALL BE PROVIDED WHERE NECESSARY.

THE ORIGINAL DRAWING IS IN A1 SIZE


C COPYRIGHT OF CHINA GEO

CONSULTANT: CONTRACTOR : DRAWING TITLE : CLIENT :


DESIGN : DRAWN : CHECKED : THE GOVERNMENT OF THE DEMOCRATIC SOCIALIST
REPUBLIC OF SRI LANKA
CHINA GEO ENGINEERING STRUCTURAL DETAILS OF MINISTRY OF MEGAPOLIS &WESTERN DEVELOPMENT
CDM BKIJ DAJ
CORPORATION .................................... .................................... ....................................
DOHWA - MAHAB GHODSS JV GENERATOR BUILDING PROJECT :
METRO COLOMBO URBAN DEVELOPMENT PROJECT
2 THIRD ISSUE- Incorporating latest M&E revisions . 31-01-19
MAIN OFFICE : Buiding B, No. 92, Xiangshan South Road,
Sheet 02 of 02 RECOMMENDED : APPROVED : DATE :
DESIGN AND BUILDING OF ST .SEBASTIAN
SECOND ISSUE- Incorporating comments
1 05-07-18 Haidian District,Beijing, China. Post Code 100093 NORTH LOCK GATES AND PUMPING STATION
Ref:DH-KOR-MCUDP-LKA-170904-133
TEL : (86-10) 82408500, FAX : (86-10) 82408544
0 FIRST ISSUE 18-12-17 RESIDENT OFFICE : 93/1,Alwitigala mawatha SCALE PLANT : FILE NAME DRAWING NO. REV.
RESIDENT OFFICE : 6th floor,meewalla building, LIULAIFU 01-12-2017
NO. DESCRIPTION DATE INITS. Colombo - 08, Sri Lanka. LULIANG .................................... ....................................
REVISION DETAILS
Colombo - 04, Sri Lanka.
TEL : +94 11 2366882 , FAX : +94 11 2367516
AS SHOWN
PAPER : A1
....................................
COMPLETED DATE
MCUDP/NLGPS/04 MCUDP/NLGPS/D/DWG/C&S/04/002 2
A

C
B
1 2 3

10300

5000 5000

4
GB1 (400x500)
C
COLUMN SCHEDULE
C2
C1 C1
TYPE
COLUMN
REFERENCE
C1

4475
SFL+9.50
01a 250x300 Roof beam

10300

1.5 x tension lap (min.)


5
02 02

GB2 (400x500)

H8@275
B
GB2 (400x500)

C2 C1

8H16
A-A
01

H8@100
5525

1500
02 23H10-02-200-T2&B2
SSL+4.60

400x500 ground beam

6
COLUMN
STARTER
C1 C1
300

H16
H16
H16
A C2
126H10-01-200-B1
GB1 (400x500)

300
H16 H16

H16
H16
H16
COLUMN BEAM LAYOUT 126H10-01a-200-T1
SECTION A-A
1:50 200mm THICK GROUND SLAB
1:60

02

200
GB1 (400x500) 400
1:40 01a
1 2 3 H16 H16 H16 01a

1 H8@250 02
500

3H16-06
01
01 SECTION 02-02
H8@250 1:20
H16 H16 H16
SECTION 1-1 NOTES
1:16 1. PLEASE REFER STANDARD DRAWINGS Nos. MCUDP/NLGPS/D/DWG/S/01 TO 10 FOR DETAIL NOTES.
1
3H16-07 2. LAP LENGTHS SHOULD NOT BE LESS THAN 50 TIMES THE SMALLER BAR DIAMETER.
3. ANCHORAGE LENGTH SHOULD NOT BE LESS THAN 40 TIMES THE BAR DIAMETER UNLESS
OTHERWISE SPECIFIED.
GB2 (400x500) 4. CHARACTERISTIC STRENGTH OF HIGH YIELD STEEL BARS SHALL BE
A 1:40 B C 400 500 N/mm2 .
H16 H16 H16 5. NOTATION TO REINFORCEMENT IS AS FOLLOWS:
3H16-08
H8@250 2 H 20 - 01 - 250 - T1
500

H8@250 No. OF BARS BAR LOCATION


H16 H16 H16 BAR SPACING
TYPE OF STEEL
3H16-09 SECTION 1-1
1:16 BAR DIAMETER BAR MARK

THE ORIGINAL DRAWING IS IN A1 SIZE 6. DISTRIBUTION BARS OF H10@200 SHALL BE PROVIDED WHERE NECESSARY.
C COPYRIGHT OF CHINA GEO

CONSULTANT: CONTRACTOR : DRAWING TITLE : CLIENT :


DESIGN : DRAWN : CHECKED : THE GOVERNMENT OF THE DEMOCRATIC SOCIALIST
REPUBLIC OF SRI LANKA
CHINA GEO ENGINEERING MINISTRY OF MEGAPOLIS &WESTERN DEVELOPMENT
CORPORATION STRUCTURAL DETAILS OF CDM
.................................... BKIJ
....................................
DAJ
....................................
DOHWA - MAHAB GHODSS JV WORKSHOP AND STORE BUILDING PROJECT :
2 THIRD ISSUE- Incorporating latest M&E revisions . 31-01-19
METRO COLOMBO URBAN DEVELOPMENT PROJECT
RECOMMENDED : APPROVED : DATE :
SECOND ISSUE- Incorporating comments MAIN OFFICE : Buiding B, No. 92, Xiangshan South Road,
Haidian District,Beijing, China. Post Code 100093
Sheet 01 of 02 DESIGN AND BUILDING OF ST .SEBASTIAN
1 05-07-18 NORTH LOCK GATES AND PUMPING STATION
Ref:DH-KOR-MCUDP-LKA-170904-133
TEL : (86-10) 82408500, FAX : (86-10) 82408544
0 FIRST ISSUE 18-12-17 RESIDENT OFFICE : 93/1,Alwitigala mawatha SCALE PLANT : FILE NAME DRAWING NO. REV.
RESIDENT OFFICE : 6th floor,meewalla building, LIULAIFU 01-12-2017
NO. DESCRIPTION DATE INITS. Colombo - 08, Sri Lanka. LULIANG .................................... ....................................
REVISION DETAILS
Colombo - 04, Sri Lanka.
TEL : +94 11 2366882 , FAX : +94 11 2367516
AS SHOWN
PAPER : A1
....................................
COMPLETED DATE
MCUDP/NLGPS/04 MCUDP/NLGPS/D/DWG/C&S/04/003 2
1 2 3

SEE DETAIL 'B'

Y
250x300 Roof beam
C

C2 C1 C2

Steel truss
101x51x1.5mm TK. 'C' 40 x 40 x 5
PURLIN (p) AT 1200 C/S ANGLE IRON
C2 C2

500
B

BOLTED TO ANGLE
CLEAT

Steel truss
0.47mm THK.
ZN-ALUM ROOFING
SHEETS 25 x 25 x 5
ANGLE IRON

C2 C1 C2 SEE DETAIL 'A'


A

250x300 Roof beam

Y
ROOF LAYOUT 748
1:100
748

A 12.25MSL C
5000 250
H16 H16

ROOF TRUSS

300
H8-125
SCALE:- 1 : 16

250x300 Roof beam 9.50 MSL H16 H16


TYPICAL ROOF BEAM
1:10

300
SECTION Y-Y 1:50

10mm DIA.MS TIE ROD 1 225 x 400 x 10 BASE PLATE


A 12.25MSL C NOS.PER SPAN

300
Zn / Al GUTTER 60 x 60 x 6 ANGLE IRON

4 Nos. RAG BOLTS

BRACKET TO FIX VALENCE 6mm THK. GUSSET PLATE


BOARD WITH PURLIN IN
250x300 Roof beam 9.50 MSL ACCORDENCE WITH 2/60 x 60 x 6mm ANGLE IRON PLAN VIEW AT END 01
BOTH SIDES
MANUFACTURERS DETAILS SCALE:- 1 : 5
10mm THK. BASE PLATE
Corrugated Zn/Al Zn / Al VALANCE BOARD 6mm THK. SOLE PLATE
wall cladding
4 Nos. 16mmØ 225mm LONG
GENERAL NOTES
RAG BOLTS
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS ARE IN METRES.
0.47mm THK. ZN-ALUM
GABLE END WALL DETAIL 1:50 1000 300 CONCRETE COLUMN
2.PLEASE REFER STANDARD DRAWINGS Nos. MCUDP/NLGPS/D/DWG/S/01 TO 10 FOR DETAIL NOTES .
ROOFING SHEETS
3. ALL EXPOSED STEEL COMPONENTS SHOULD BE PROTECTED WITH
TWO COATS OF APPROVED ANTICOROSSIVE PAINT.
16mmØ BOLTS 40 x 40 x 5 ANGLE IRON DETAIL 'A' 4. ALL WELDS SHOULD BE FILLET WELDS OF 6mm LEG LENGTH HAVING STRENGTH
(03 Nos.)
300 1:10 OF 215N/mm . 2
25 x 25 x 5 ANGLE IRON

PROVIDE SLOTTED HOLES FOR FREE END 5. MINIMUM FILLET WELDING LENGTH (h) TO BE 200mm UNLESS SHOWN OTHERWISE.
ONLY 6. DIMENSION OF STEEL STRUCTURE SHALL BE CONFIRMED AT
SITE BEFORE FABRICATION.
225 x 400 x 10 BASE PLATE
300

7. ALL BOLTS SHALL BE APPROVED GRADES ACCORDING TO THE STANDARDS.


60 x 60 x 6 ANGLE IRON 8. ALL STRUCTURAL ELEMENTS , NUTS, BOLTS, etc..,SHALL BE PAINTED
WITH TWO LAYERS OF APPROVED ANTICORROSIVE PAINT. BEFORE APPLYING
4 Nos. RAG BOLTS ANTICORROSIVE PAINT ALL CORROSION, OIL etc... SHALL BE REMOVED.

9. METHOD OF ERECTION SHALL BE SUBMITTED BEFORE ERECTION OF TRUSSES


DETAIL 'B' PLAN VIEW AT END 02 TO THE APPROVAL OF ENGINEER.
THE ORIGINAL DRAWING IS IN A1 SIZE
C COPYRIGHT OF CHINA GEO 1:10 SCALE:- 1 : 5
CONSULTANT: CONTRACTOR : DRAWING TITLE : CLIENT :
DESIGN : DRAWN : CHECKED : THE GOVERNMENT OF THE DEMOCRATIC SOCIALIST
REPUBLIC OF SRI LANKA
CHINA GEO ENGINEERING MINISTRY OF MEGAPOLIS &WESTERN DEVELOPMENT
CORPORATION
STRUCTURAL DETAILS OF CDM
.................................... BKIJ
....................................
DAJ
....................................
DOHWA - MAHAB GHODSS JV WORKSHOP AND STORE BUILDING PROJECT :
2 THIRD ISSUE- Incorporating latest M&E revisions . 31-01-19
METRO COLOMBO URBAN DEVELOPMENT PROJECT
RECOMMENDED : APPROVED : DATE :
SECOND ISSUE- Incorporating comments MAIN OFFICE : Buiding B, No. 92, Xiangshan South Road, Sheet 02 of 02 DESIGN AND BUILDING OF ST .SEBASTIAN
1 05-07-18 Haidian District,Beijing, China. Post Code 100093 NORTH LOCK GATES AND PUMPING STATION
Ref:DH-KOR-MCUDP-LKA-170904-133
TEL : (86-10) 82408500, FAX : (86-10) 82408544
0 FIRST ISSUE 18-12-17 RESIDENT OFFICE : 93/1,Alwitigala mawatha SCALE PLANT : FILE NAME DRAWING NO. REV.
RESIDENT OFFICE : 6th floor,meewalla building, LIULAIFU 01-12-2017
NO. DESCRIPTION DATE INITS. Colombo - 08, Sri Lanka. LULIANG .................................... ....................................
REVISION DETAILS
Colombo - 04, Sri Lanka.
TEL : +94 11 2366882 , FAX : +94 11 2367516
AS SHOWN
PAPER : A1
....................................
COMPLETED DATE
MCUDP/NLGPS/04 MCUDP/NLGPS/D/DWG/C&S/04/004 2