Icotea/Misoa Well Review

Well Summary UD-601

Platform ICB Drilled Date Oct 97 – Nov 98 Well type Oil producer
Prod. Station MPP Completed Date Dec 98 A/Lift Jet Pump
Well Track S1 Max. Deviation 84° PDG N/A

Completion Intervals & Current Status

zone Reservoir sand excl'n interval Status Net BS&W GOR


(mah) stb/d % ft3/bbl
Icotea/ 41/2”Con
1 9150-11450 producing 600 15 43
Misoa Slot 300 m

Casing scheme

size Grade/coupling /wt set depth TOC depth Remarks


(inc) (lb/ft) (AHBDF) (mah)
133/8 K55/BTC/54.5 2017’ Surface -
95/8 L80/VAM/47 9142’ Calculated

Pressure Data

Date Type Reservoir Pressure, psia Depth, ft Remarks


Feb 01 BU Icotea-Misoa 3254 8500 Only 300 psia drawdown
applied

PVT Analysis

Date Pb, psia API Remarks


March 2001 - - Sample collected was almost 100% water

Core Analysis

Date Number of Interval, ft % Recovery Reservoir


Samples
NO CORE SAMPLE TAKEN

History

Date Activity Description Production


(bpd)
Oct 97 The original well, UD-601, was drilled as per program as a highly deviated
(80°) development well. The drill string became differentially stuck while
circulating clean at TD in the 6”hole section and the drillpipe was left
stationary in the hole. In attempts to free the drillpipe the mudweight was
lowered and the hole packed off along the drillpipe, causing loss of circulation
and final wellbore collapse. The BHA was backed off mechanically and left in
the hole. The well was plugged back to 8522 ftahbdf and suspended on
December 14th 1997.
Nov 98 The well was sidetracked as a subhorizontal well of 82° inclination through the

UD-601 (MIB03)
Last revision March 2003 1
Icotea/Misoa Well Review

Icotea and Misoa reservoirs. The hole collapsed and immediately (December
14th 1998), it was cleaned out and continued.
Dec 98 The well was completed as a commingled producer in the Icotea and Misoa
reservoirs with 41/2”Con Slot sandscreens and a 41/2” free jet pump
completion.
Dec 98 The well was hooked up on December 29 th 1998 with an initial rate of ± 1500
bbl/d. Although the well is completed commingled (Icotea and Misoa), the
principal contribution comes from the Misoa Formation according to
petrophysical parameters (~90%).
Jan 99 A PVT/PLT/Build Up program was planned, but since it was not possible to fish
the standing valve, the program was suspended.
Mar 99 The jet pump was changed.
May 00 The well was found recirculating power fluid. A slickline investigation was
carried out, in order to recover the jet pump (10c), repair it and re-install it. A
sandbailer clean out was also carried out recovering ~70 Kg of sand.
Jun 00 Another slickline investigation was done, because of the low well production.
The purpose was to check the jet pump condition and to eliminate the standing
valve (previously found full of sand). A 10c jet pump combination without cup
was installed.
Sep 00 Because of low well production, the jet pump (10c) was replaced.
Oct 00 After an MPP shutdown, the well was not receiving power fluid due to plugging
of the jet pump nozzle with sand. The jet pump was changed for a 10b
combination.
Feb 01 During the MPP shutdown, the first build up survey in this well was carried out.
After retrieving the sensors, a PVT sample was acquired. The idea was to collect
two samples as per standard procedures, but due to the well deviation, only one
chamber was able to pass, and therefore, only one fluid sample was collected.
The 550­cc sample turned out to contain only about 5 cc of oil in emulsion with
water, so PVT analysis could not be performed. Water analysis of the water was
performed   instead.     The   pressure   survey   showed   that   only   some   300   psi   of
drawdown were being applied, which suggested that the jet pump was operating
inefficiently.
Apr 01 The jet pump was pulled out and checked (HUD @ 9437ft). It was found in
good conditions and was re-installed in the well (10b). Production remained
low, after this inspection. It was suspected that pump is oversized and/or we
were experiencing power fluid losses in the well.
May 01 The jet pump was recovered and replaced for an 11a combination. Mixture API
measurements after this were around 27°. On May 24 th 2001, pressure lost was
confirmed. The well was closed in and the jet pump recovered for revision.
Jun 01 A modified 11a jet pump KOBE 2 ½ ” (previous National 3”) was installed.
This pump has a standing valve incorporated. Mixture API measurements after
this were around 21.6°.
Dec 02 Due to PDVSA production restrictions, the well was closed in.
Jan 03 The well was opened back up.

UD-601 (MIB03)
Last revision March 2003 2
Icotea/Misoa Well Review

UD-601

1800 1,6

1600 The power fluid was recirculando


Made a slickline , repaired JP 10c and it was 1,4
reistall

1400
Install the new JP 11a
1,2
KOBE 2 1/2", before it was
3"
1200

Cumulative oil (MMbls)


1

1000 See JP and it was


Qnet (bpd)

reistall
0,8
JP trough with sand
800 Change JP to 10b

Change JP to 10c
0,6
600
Try to make a BU, but Power fluid loss
they could not fish the
standing valve 0,4
400 Recover JP
and reistall it

Change JP to
200 11a PDVSA production 0,2
Run out JP and it was in good conditons restriction
It was reistlled

0 0
Jul-98 Feb-99 Ago-99 Mar-00 Oct-00 Abr-01 Nov-01 May-02 Dic-02 Jun-03

Qnet Cumulative oil

UD-601 (MIB03)
Last revision March 2003 3
Icotea/Misoa Well Review

UD-601 / MIB-03 S2 Well Status Record


GENERAL DATA FIELD DATA
Date Spudded: 12-Oct-97 D.F.E. : 55.4 ft Tbg Vol: 130 bbls Field: Urdaneta West
Date Suspended: Water Depth : 41 ft Ann Vol: 483 bbls Well N°: UD-601 / MIB-03 S2
Date Completed: 25-Dec-98 Swab : <> ft Ann Fluid: Brine (6 % NaCl, 2% KCl) Slot N°: 5
Date Recompleted: 25-Dec-98 K.O.P. : 6,000 ft Ann Fluid Wt.: 8.8 ppg Well Type: Producer
Drilling Fluid: Oil base Mud Max. Dev.: 84 degrees Perf. Footage: nil Reservoir: Misoa
Weight of Mud: 9.8 ppg Min. I.D. 2.205" @ 8,568 ft MD Ref. Log: n.a. Perforated: Uncemented Slotted Liner
Weighting Material: CaCO3 Max. Dogleg: 4.97 @ 9929ft MD Driller's TD: 11,530 ft MD/ 8,791 ft TVD
W E L L H E AD D A T A C A SI N G S C H E M E S H O E D E P TH TOC
IT E M F la n g e ( in ) R a tin g ( p s i) B O R E ( in ) S iz e ( i n ) W T ( l b /f t) G R ADE C ´P L G AH BDF T VDBD F AHBD F
X M A S tr e e 11" 5 ,0 0 0 4 1 /1 6 1 3 3 /8 " 5 4 .5 K -5 5 B TC 2,017 2 ,0 1 7 T o S u r fa c e
T HS 13 5/8" 5 ,0 0 0 9 5/8" 47 L -8 0 V a m To p 9,142 8 ,3 3 4
C HH 13 3/8" 3 ,0 0 0 4 1/2" 1 3 .5 A316 B DS 1 1 ,1 0 5 8 ,7 1 5 N o t c e m e n te d
(V e t co G ra y)
DE P TH DE P TH W ELL:U D- 60 1(M IB-0 3) M A X OD M IN ID in
AHB THF TV B D F D eep s are f rom the Ro t ary T ab le ( t o 5 5.4 ft fro m th e T H S). (in) (in )
5 5 .4 55 Tbg . H gr 1 1 "x 4 .1 /2 " 11 .000 4.000
5 P u p J o in t 4 .1 /2 " V am A c e 1 2 .6 # L -80
26 6 Tu b in g Jo in t 4 .1 /2 ", 1 2.6 # , L -8 0 V a m A ce 4. 5 0 0 3 .9 5 8

13 .3 /8 " 54 . 5 # K -5 5 B TC C asin g 1 3. 3 7 5 1 2 .6 1 5

2 ,0 1 7 13 .3 /8 " 54 . 5 # K -5 5 B TC C asin g S h o e
9.5 /8 " L -8 0 4 7 lb /f t V a m T o p Ca s ing fro m 0 ' to sid e -tra ck w in dow 9. 6 2 5 8 .6 8 1
a t 9 1 4 2 ' ( O ld 9 5/ 8 " c a sin g s h o e d e pth a t 1 0 2 8 3')

Pu p Jo in t 4 .1 /2 " V a m A ce 12 .6 # L -8 0
8 ,4 5 5 7 ,9 8 5 X-O 4 .1 /2 " V a m Ac e x 3 1 /2 " V am A ce 2 .9 9 2
X-O 3 .1 /2 " V a m Ac e x 3 " x IN S
8 ,4 5 6 7 ,9 8 6 2.8 2 4" J et P r ofile N ipp le (B ottom Hol e As s e m bl y ) 2 .8 2 4

8 ,4 6 0 7 ,9 8 8 Sta n din g V a l ve (2 .49 5 " n o-go ) 2 .4 9 5


X-o ve r 3 1 /2 "V a m A ce x 4 1 /2 "V a m A ce 3. 5 0 0 2 .9 9 2
Pu p Jo in t 4 .1 /2 " L -8 0 1 2 .6 # V a m A ce with 4 W in g g u id e s 8 .0 00 " 7. 9 6 0
8 ,4 7 2 8 ,0 0 0 Anc ho r La tc h R HR w ith do ubl e s e a l a ss e m bl y 4 .7 5 0 "

8 ,47 3 8 ,00 1 9.5 /8 " 4 0 -4 7# O m e g at riev e H yd ra u lic P a ck e r 8.4 5 2 2. 9 3 0


Pu p jo in t 3 .1 /2 " V a m A ce 9 .3 lb s/ft L 8 0
8 ,4 8 6 8 ,0 0 9 X-o ve r 3 1 /2 " 9 .2 # V a m A ce x 2 7 /8 " 6.5 lb s/ft J 5 5 - 8 R E UE

Pu p jo in t 2 .7 /8 " 6 .5 lbs /f t J5 5 - 8 R E U E 2. 8 7 5 2 .4 4 1
Tu b in g Join t 2 .7 / 8 " 6.5 lb s/ ft J5 5 - 8 R EU E
8 ,5 1 8 8 ,0 2 0 2.7 /8 " CAM -X 2 .3 1 3 " Ni ppl e 2 .3 1 3
Pu p jo in t 2 .7 /8 " 6 .5 lbs /f t J5 5 - 8 R E U E
Jo in t 2. 7 /8 " 6 .5 lb s /ft J 5 5 - 8 R E UE
8 ,5 5 5 8 ,0 5 3 2.7 /8 " P e rfor a ted P u p 6 ' x 6 .5 lb s/ ft J 5 5 - 8 R E U E 2. 8 7 5 2 .4 4 1
Pu p jo in t 2 .7 /8 " 6 .5 lbs /f t J5 5 - 8 R E U E
8 ,5 6 8 8 ,0 6 5 2.7 /8 " CAM -X N 2.3 1 3 " N ipp le No -go 2 .2 5 1 " 2 .2 0 5
Tu b in g Join t 2 .7 / 8 " 6.5 lb s/ ft J5 5 - 8 R EU E w it h 3 0 ° mu le sh o e
8 ,5 9 9 8 ,0 8 2 2 7 /8 "M ul e s hoe (1 ft)

8 ,6 1 4 8 ,0 9 4 68° 9.5 /8 " S C-1 R P a ck er 4 .1 / 2 " S c r e en s 8. 3 7 5 6 .0 0 0


8 ,6 4 4 8 ,1 1 0 Bla n k c o n S lo t join t s

8 ,9 0 0 8 ,2 3 7 co n S lo t S cre e n s
9 ,1 4 2 8 ,3 3 5 9.5 /8 " L -8 0 4 7 lb /f t V a m c a sin g s ide trac k 2 , win d o w f rom 9 1 2 6 ' to 9 142 ' 9. 6 2 5 8 .6 8 1
(9 5 /8 " ca sin g s h o e d e p th a t 1 0 2 8 3 ')

4.1 /2 ", 1 3 .5 lbs /f t, B DS , C o n S lo t S cre e n Jo in t s 4. 5 0 0 3 .8 8 0


8 0 oTa n ge nt
S E CTIO N Op e n H o le , M ax 8 4 d e g re e s 6 .0 0 0

1 1 ,1 0 5 8 ,7 1 9 Bla n ke d of botto m of Con S l ot S c r ee n

1 1 ,5 3 0 8 ,7 9 1 TD 6 .0 0 0
P E R FO RA T IO N DA T A RE M A RK S / A DDITIO N A L DE T A IL
* The re a re ;/ - 1.5 ft. in c om p re ssio n throu g h t he string (25.000 Lb s. o f Se t * T o ta l P ro d u ct io n S trin g W e ig h t +/ - 1 4 2 K lb s).
d ow n w e ig h o n the Pa rker & 117 Klb s on th e Tub in g Ha n g er).
* T h e P rod u ctio n S trin g t o th e J et P ro file Nip p le (fro m ab ov e ) we re t e ste d
to 5 ,00 0 P si, O K .
* T h e 9 5 /8 " O m eg a t rive P a c ke r f ro m a b o ve , t h e A n n ulu s 9 5/ 8 " a n d t h e
T u b in g Ha n g e r fro m b elo w we re te st ed with 4 ,0 0 0 P si. O K .
* T h e Ha n g e r f ro m ab o v e an d th e X-m as s Tre e w ere te st ed to 5 ,0 0 0 P s i. O K .
P R E P A RE D: Ra n sis K a is Jo rd i O P W /4 1 R E V IS IO N :2 C HE CK E D : E d win P u n se lie L a st R ev isio n D a te : 20 / 0 1 /1 9 9 9

UD-601 (MIB03)
Last revision March 2003 4