Platform ICB Drilled Date Oct 97 – Nov 98 Well type Oil producer
Prod. Station MPP Completed Date Dec 98 A/Lift Jet Pump
Well Track S1 Max. Deviation 84° PDG N/A
Casing scheme
Pressure Data
PVT Analysis
Core Analysis
History
UD-601 (MIB03)
Last revision March 2003 1
Icotea/Misoa Well Review
Icotea and Misoa reservoirs. The hole collapsed and immediately (December
14th 1998), it was cleaned out and continued.
Dec 98 The well was completed as a commingled producer in the Icotea and Misoa
reservoirs with 41/2”Con Slot sandscreens and a 41/2” free jet pump
completion.
Dec 98 The well was hooked up on December 29 th 1998 with an initial rate of ± 1500
bbl/d. Although the well is completed commingled (Icotea and Misoa), the
principal contribution comes from the Misoa Formation according to
petrophysical parameters (~90%).
Jan 99 A PVT/PLT/Build Up program was planned, but since it was not possible to fish
the standing valve, the program was suspended.
Mar 99 The jet pump was changed.
May 00 The well was found recirculating power fluid. A slickline investigation was
carried out, in order to recover the jet pump (10c), repair it and re-install it. A
sandbailer clean out was also carried out recovering ~70 Kg of sand.
Jun 00 Another slickline investigation was done, because of the low well production.
The purpose was to check the jet pump condition and to eliminate the standing
valve (previously found full of sand). A 10c jet pump combination without cup
was installed.
Sep 00 Because of low well production, the jet pump (10c) was replaced.
Oct 00 After an MPP shutdown, the well was not receiving power fluid due to plugging
of the jet pump nozzle with sand. The jet pump was changed for a 10b
combination.
Feb 01 During the MPP shutdown, the first build up survey in this well was carried out.
After retrieving the sensors, a PVT sample was acquired. The idea was to collect
two samples as per standard procedures, but due to the well deviation, only one
chamber was able to pass, and therefore, only one fluid sample was collected.
The 550cc sample turned out to contain only about 5 cc of oil in emulsion with
water, so PVT analysis could not be performed. Water analysis of the water was
performed instead. The pressure survey showed that only some 300 psi of
drawdown were being applied, which suggested that the jet pump was operating
inefficiently.
Apr 01 The jet pump was pulled out and checked (HUD @ 9437ft). It was found in
good conditions and was re-installed in the well (10b). Production remained
low, after this inspection. It was suspected that pump is oversized and/or we
were experiencing power fluid losses in the well.
May 01 The jet pump was recovered and replaced for an 11a combination. Mixture API
measurements after this were around 27°. On May 24 th 2001, pressure lost was
confirmed. The well was closed in and the jet pump recovered for revision.
Jun 01 A modified 11a jet pump KOBE 2 ½ ” (previous National 3”) was installed.
This pump has a standing valve incorporated. Mixture API measurements after
this were around 21.6°.
Dec 02 Due to PDVSA production restrictions, the well was closed in.
Jan 03 The well was opened back up.
UD-601 (MIB03)
Last revision March 2003 2
Icotea/Misoa Well Review
UD-601
1800 1,6
1400
Install the new JP 11a
1,2
KOBE 2 1/2", before it was
3"
1200
reistall
0,8
JP trough with sand
800 Change JP to 10b
Change JP to 10c
0,6
600
Try to make a BU, but Power fluid loss
they could not fish the
standing valve 0,4
400 Recover JP
and reistall it
Change JP to
200 11a PDVSA production 0,2
Run out JP and it was in good conditons restriction
It was reistlled
0 0
Jul-98 Feb-99 Ago-99 Mar-00 Oct-00 Abr-01 Nov-01 May-02 Dic-02 Jun-03
UD-601 (MIB03)
Last revision March 2003 3
Icotea/Misoa Well Review
13 .3 /8 " 54 . 5 # K -5 5 B TC C asin g 1 3. 3 7 5 1 2 .6 1 5
2 ,0 1 7 13 .3 /8 " 54 . 5 # K -5 5 B TC C asin g S h o e
9.5 /8 " L -8 0 4 7 lb /f t V a m T o p Ca s ing fro m 0 ' to sid e -tra ck w in dow 9. 6 2 5 8 .6 8 1
a t 9 1 4 2 ' ( O ld 9 5/ 8 " c a sin g s h o e d e pth a t 1 0 2 8 3')
Pu p Jo in t 4 .1 /2 " V a m A ce 12 .6 # L -8 0
8 ,4 5 5 7 ,9 8 5 X-O 4 .1 /2 " V a m Ac e x 3 1 /2 " V am A ce 2 .9 9 2
X-O 3 .1 /2 " V a m Ac e x 3 " x IN S
8 ,4 5 6 7 ,9 8 6 2.8 2 4" J et P r ofile N ipp le (B ottom Hol e As s e m bl y ) 2 .8 2 4
Pu p jo in t 2 .7 /8 " 6 .5 lbs /f t J5 5 - 8 R E U E 2. 8 7 5 2 .4 4 1
Tu b in g Join t 2 .7 / 8 " 6.5 lb s/ ft J5 5 - 8 R EU E
8 ,5 1 8 8 ,0 2 0 2.7 /8 " CAM -X 2 .3 1 3 " Ni ppl e 2 .3 1 3
Pu p jo in t 2 .7 /8 " 6 .5 lbs /f t J5 5 - 8 R E U E
Jo in t 2. 7 /8 " 6 .5 lb s /ft J 5 5 - 8 R E UE
8 ,5 5 5 8 ,0 5 3 2.7 /8 " P e rfor a ted P u p 6 ' x 6 .5 lb s/ ft J 5 5 - 8 R E U E 2. 8 7 5 2 .4 4 1
Pu p jo in t 2 .7 /8 " 6 .5 lbs /f t J5 5 - 8 R E U E
8 ,5 6 8 8 ,0 6 5 2.7 /8 " CAM -X N 2.3 1 3 " N ipp le No -go 2 .2 5 1 " 2 .2 0 5
Tu b in g Join t 2 .7 / 8 " 6.5 lb s/ ft J5 5 - 8 R EU E w it h 3 0 ° mu le sh o e
8 ,5 9 9 8 ,0 8 2 2 7 /8 "M ul e s hoe (1 ft)
8 ,9 0 0 8 ,2 3 7 co n S lo t S cre e n s
9 ,1 4 2 8 ,3 3 5 9.5 /8 " L -8 0 4 7 lb /f t V a m c a sin g s ide trac k 2 , win d o w f rom 9 1 2 6 ' to 9 142 ' 9. 6 2 5 8 .6 8 1
(9 5 /8 " ca sin g s h o e d e p th a t 1 0 2 8 3 ')
1 1 ,5 3 0 8 ,7 9 1 TD 6 .0 0 0
P E R FO RA T IO N DA T A RE M A RK S / A DDITIO N A L DE T A IL
* The re a re ;/ - 1.5 ft. in c om p re ssio n throu g h t he string (25.000 Lb s. o f Se t * T o ta l P ro d u ct io n S trin g W e ig h t +/ - 1 4 2 K lb s).
d ow n w e ig h o n the Pa rker & 117 Klb s on th e Tub in g Ha n g er).
* T h e P rod u ctio n S trin g t o th e J et P ro file Nip p le (fro m ab ov e ) we re t e ste d
to 5 ,00 0 P si, O K .
* T h e 9 5 /8 " O m eg a t rive P a c ke r f ro m a b o ve , t h e A n n ulu s 9 5/ 8 " a n d t h e
T u b in g Ha n g e r fro m b elo w we re te st ed with 4 ,0 0 0 P si. O K .
* T h e Ha n g e r f ro m ab o v e an d th e X-m as s Tre e w ere te st ed to 5 ,0 0 0 P s i. O K .
P R E P A RE D: Ra n sis K a is Jo rd i O P W /4 1 R E V IS IO N :2 C HE CK E D : E d win P u n se lie L a st R ev isio n D a te : 20 / 0 1 /1 9 9 9
UD-601 (MIB03)
Last revision March 2003 4