The design work for the dam will be undertaken in accordance with relevant Kenyan
Standards, International Commission on Large Dams (ICOLD) publications and other
guidelines, and current dams engineering practices, specifically “DESIGN STANDARDS NO. 13- US Bureau of Reclamation, Denver, Colorado; modified as necessary with the provisions of the “Practice Manual for Small Dams, Pans and Other Water Conservation Structures”, Ministry of Water and Irrigation