You are on page 1of 24

QUOTATION

PROJECT: Diamond Island City


BUILDING: Villa King
ITEMS: Renovation Works (Architecture and MEP) & 3F+Roof

TOTAL PROJECT AMOUNT: $ -


Date: 26-11-2018
0

UOTATION
CT: Diamond Island City
ILDING: Villa King
Works (Architecture and MEP) & 3F+Roof
Date: 26-11-2018
QUOTATION
PROJECT: Diamond Island City
BUILDING: Villa King
ITEMS: Renovation Works (Architecture and MEP) & 3F+Roof

ITEMS DESIGNATION

PROJECT: Diamond Island City


ITEMS: Renovation Works (Architecture and MEP) & 3F+Roof
BILL OF QUANTITY SUMMARY
A APPENDIX - A : PRELIMINARY WORKS
B Bridge L=60m, W=12m
C APPENDIX - C : ARCHITECTURE WORKS
D APPENDIX - D: TRAVAUX ELECTRIQUES ET MECANIQUES
E APPENDIX - E: TRAVAUX DE PLOMBERIE

TOTAL AMOUNT

Page 5
QUOTATION

Date: 26-11-2018

AMOUNT (USD)

-
-
-
-
-

Page 6
BILL OF QUANTITY
APPENDIX - A : PRELIMINARY WORKS
Unit Rate
No. Designation Unit Brand Qty.
Material Labor
1 Travaux Préliminaires
1.01 Permis de construction
1.02 Cloô ture entourant
1.03 Connexion d'eé lectriciteé d'EDC
1.04 Connexion plumberie
1.05 Utilisation temporaire d'eau et d'eé lectriciteé
1.06 Entrepoô t temporaire, camp de travail et
toilettes
1.07 Seé curiteé de site et bannieè re
1.08 Dessin de construit
1.09 Frais de gestion de projet

Page 7 of 24
L OF QUANTITY
Unit: US Dollar

Total Price
Total
Material Labor

Page 8 of 24
Group: I5-GCI-9(B)
Description of Tasks
Bridge L=60m, W=12m

No. Description of Tasks U Quantity

I Foundation Works
I-1 Surveys Works
I-2 Driven Pile
I-2-1 Install Driven Pile (75pile 1pile deep 12m) m 900
I-2-2 Remove head driven pile 1m m3 7.3
I-3 Pile cap Works
I-3-1 Soil excavation for pile cap m3 260
I-3-2 Compaction Stone m3 20.16
I-3-3 Lean Concrete 10cm m3 20.16
I-3-4 Formwork Installation Brick 10cm m3 14.4
I-3-5 Bar Installation DB25 T 9.7
Bar Installation DB16 T 3.9
I-3-6 Concrete casting for pile cap m3 187
II Substructure Works
II-1 RC Bridge Pier Column Works
II-1-1 Bar installation

Longitudinal Rebar DB36@150mm, N=69,H=5mm T 8.27


Shear Rebar DB25@200mm, L=9.84m,N=50 T 5.68
Shear Rebar DB16mm@600mm,N=54, L=0.8m T 0.2
II-1-2 Pier Formwork Installation (4400x800mm),H=5000mm m2 156
II-1-3 Concrete casting for pier m3 52.8
II-1-4 Remove formwork
II-2 Abutment Works
II-2-1 Bar installation

Longitudinal Rebar DB36, N=124,H=3.695m T 7.32


Longitudinal Rebar DB16mm,N=110,h=1.72m T 0.6
Shear Rebar DB25mm,N=38, L=11m T 3.22
Shear rebar DB12@200mm,N=24,L=11m& T 0.68
DB12@500mm, N=110,L=1.1m
RB10mm,Lt=18m T 0.02

Page 9 of 24
Group: I5-GCI-9(B)
Bridge L=60m, W=12m

No. Description of Tasks U Quantity

II-2-2 Abutment formworks installation m2 264


II-2-3 Concrete casting for abutment m3 88
II-2-4 Remove formwork
II-3 Pier Cap Works/ Headstock Works
II-3-1 Pier cap formworks installation
II-3-2 Bar installation
II-3-3 Concrete casting for pier cap
II-3-4 Remove formwork
II-4 Bridge Bearing Works
III Superstructure Works
III-1 Precast Concrete Bridge Beams Works
III-1-1 Bar installation
III-1-2 Girder/ Beam formworks
III-1-3 Concrete casting beams
III-1-4 Precast concrete beams installation
III-2 Deck Slab Bridge Works
III-2-1 Deck slab formworks installation m2 741.6
III-2-2 Bar installation
TOP
Lx: DB16@220 (12m)= (68 x 12)m x (16x16/162)kg/m = T 1.2895
1289.48Kg
Ly: DB16@220 (15m)= (55 x 15)m x (16x16/162)kg/m = T 1.3037
1303.7Kg
Bottom
Lx: DB16@200 (12m)= (75 x 12)m x (16x16/162)kg/m = T 1.423
1422.22kg
Ly: DB16@200 (12m)= (60 x 12)m x (16x16/162)kg/m = T 1.138
1137.78kg
Total DB16 T 5.1542

III-2-3 Concrete casting for deck slab: 4 x (0.2 x 12 x 15)m3= m3 144


144m3
III-2-4 Remove formwork m2 741.6

III-3 Safety Barrier Works

Page 10 of 24
Group: I5-GCI-9(B)
Bridge L=60m, W=12m

No. Description of Tasks U Quantity

III-3-1 Bar installation T 1.8816

III-3-2 Barrier formworks installation : 2 x (0.865 + 0.925)m x m2 214.8


(60)m= 214.8m2

III-3-3 Concrete casting for barrier : 2 x (0.196075)m2 x m3 23.52


(60)m=23.52m3
III-3-4 Remove formwork m2 214.8
Railing ɸRound 220 x 4.0mm ( 6m/pcs), length bridge
III-3-5 60m x 2= 120m: 120m x [(2202/162)Kg/m - T 1.292
(2162/162)Kg/m]= 1291.85Kg
III-4 Sidewalk Works
III-4-1 Bar installation

III-4-2 Formwork for sidewalk

III-4-3 concrete casting for sidewalk


III-5 Deck Asphalt Pavement Works
III-5-1 Base course work

III-5-2 Binder course work


III-5-3 Surface course work

Page 11 of 24
Pile 900 m
Remove head 7.212188 m3

Soil excaver 259.92 m2


Pile 900 m
stone 20.16 m3
lean 20.16 m3
formwork 144 m2
Bar DB25 9.690138 T
BDB16 3.833412 T
concrete 187
BILL OF QUANTITY
APPENDIX - C : ARCHITECTURE WORKS
Unit Rate
No. Description Unit Brand Qty.
Material Labor
1 Mur et Cloison
Mur des briques 10cm thk
Fournir et installer des briques 10cm thk. du sol à la
dalle inférieure
1.01
10.2

Page 13 of 24
APPENDIX - C : ARCHITECTURE WORKS
Unit Rate
No. Description Unit Brand Qty.
Material Labor

Page 14 of 24
APPENDIX - C : ARCHITECTURE WORKS
Unit Rate
No. Description Unit Brand Qty.
Material Labor

Page 15 of 24
APPENDIX - C : ARCHITECTURE WORKS
Unit Rate
No. Description Unit Brand Qty.
Material Labor

Page 16 of 24
APPENDIX - C : ARCHITECTURE WORKS
Unit Rate
No. Description Unit Brand Qty.
Material Labor

Page 17 of 24
L OF QUANTITY
Unit: US Dollar
Total Price
Total
Material Labor

Page 18 of 24
Unit: US Dollar
Total Price
Total
Material Labor

Page 19 of 24
Unit: US Dollar
Total Price
Total
Material Labor

Page 20 of 24
Unit: US Dollar
Total Price
Total
Material Labor

Page 21 of 24
Unit: US Dollar
Total Price
Total
Material Labor

Page 22 of 24
ESTIMATED PRICE FOR CONSTRUCTION
PROJECT: AIS CA

Unit Quoted Rate Total


No. Description Unit Qty.
m m2 m3 Labor Material Labor Material
1.01 Stone for pipe cap 0 25 5 m3 $ 40.00 $ 90.00
stone 4x6 m3 5.00 $ - $ 18.00 $ - $ 90.00
Labor for delivery to location of pile cap pax 5.00 $ 8.00 $ - $ 40.00 $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -

1.02 Lean concrete 0 0 3 m3 $ 32.00 $ 192.00


Lean concrete m3 3.00 $ 64.00 $ - $ 192.00
Labor pax 4.00 $ 8.00 $ 32.00 $ -
Other accessories (steel formworks) lot 1.00 $ - $ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
1.03 Sand backfill for basement 0 0 65 m3 $ 256.00 $ 390.00
Sand type 3 m3 65.00 $ 6.00 $ - $ 390.00
Labor pax 32.00 $ 8.00 $ 256.00 $ -
Other accessories (steel formworks) lot 1.00 $ - $ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
Rated for Quotation
/m /m2 /m3
Labor Material Labor Material Labor Material
#DIV/0! #DIV/0! $ 1.60 $ 3.60 8.00 18.00

#DIV/0! #DIV/0! #DIV/0! #DIV/0! 10.67 64.00

#DIV/0! #DIV/0! #DIV/0! #DIV/0! 3.94 6.00