Professional Documents
Culture Documents
Quotation: PROJECT: Diamond Island City BUILDING: Villa King
Quotation: PROJECT: Diamond Island City BUILDING: Villa King
UOTATION
CT: Diamond Island City
ILDING: Villa King
Works (Architecture and MEP) & 3F+Roof
Date: 26-11-2018
QUOTATION
PROJECT: Diamond Island City
BUILDING: Villa King
ITEMS: Renovation Works (Architecture and MEP) & 3F+Roof
ITEMS DESIGNATION
TOTAL AMOUNT
Page 5
QUOTATION
Date: 26-11-2018
AMOUNT (USD)
-
-
-
-
-
Page 6
BILL OF QUANTITY
APPENDIX - A : PRELIMINARY WORKS
Unit Rate
No. Designation Unit Brand Qty.
Material Labor
1 Travaux Préliminaires
1.01 Permis de construction
1.02 Cloô ture entourant
1.03 Connexion d'eé lectriciteé d'EDC
1.04 Connexion plumberie
1.05 Utilisation temporaire d'eau et d'eé lectriciteé
1.06 Entrepoô t temporaire, camp de travail et
toilettes
1.07 Seé curiteé de site et bannieè re
1.08 Dessin de construit
1.09 Frais de gestion de projet
Page 7 of 24
L OF QUANTITY
Unit: US Dollar
Total Price
Total
Material Labor
Page 8 of 24
Group: I5-GCI-9(B)
Description of Tasks
Bridge L=60m, W=12m
I Foundation Works
I-1 Surveys Works
I-2 Driven Pile
I-2-1 Install Driven Pile (75pile 1pile deep 12m) m 900
I-2-2 Remove head driven pile 1m m3 7.3
I-3 Pile cap Works
I-3-1 Soil excavation for pile cap m3 260
I-3-2 Compaction Stone m3 20.16
I-3-3 Lean Concrete 10cm m3 20.16
I-3-4 Formwork Installation Brick 10cm m3 14.4
I-3-5 Bar Installation DB25 T 9.7
Bar Installation DB16 T 3.9
I-3-6 Concrete casting for pile cap m3 187
II Substructure Works
II-1 RC Bridge Pier Column Works
II-1-1 Bar installation
Page 9 of 24
Group: I5-GCI-9(B)
Bridge L=60m, W=12m
Page 10 of 24
Group: I5-GCI-9(B)
Bridge L=60m, W=12m
Page 11 of 24
Pile 900 m
Remove head 7.212188 m3
Page 13 of 24
APPENDIX - C : ARCHITECTURE WORKS
Unit Rate
No. Description Unit Brand Qty.
Material Labor
Page 14 of 24
APPENDIX - C : ARCHITECTURE WORKS
Unit Rate
No. Description Unit Brand Qty.
Material Labor
Page 15 of 24
APPENDIX - C : ARCHITECTURE WORKS
Unit Rate
No. Description Unit Brand Qty.
Material Labor
Page 16 of 24
APPENDIX - C : ARCHITECTURE WORKS
Unit Rate
No. Description Unit Brand Qty.
Material Labor
Page 17 of 24
L OF QUANTITY
Unit: US Dollar
Total Price
Total
Material Labor
Page 18 of 24
Unit: US Dollar
Total Price
Total
Material Labor
Page 19 of 24
Unit: US Dollar
Total Price
Total
Material Labor
Page 20 of 24
Unit: US Dollar
Total Price
Total
Material Labor
Page 21 of 24
Unit: US Dollar
Total Price
Total
Material Labor
Page 22 of 24
ESTIMATED PRICE FOR CONSTRUCTION
PROJECT: AIS CA