You are on page 1of 4
‘raw the require fale Celing Finish line fom the fgh Foor by using Laser ine marker or Water Level Methodology - Regular Ceiling [sc No-me7o0r Dete of Release 20/08/2013 levis -02 ete of Revision -20.5.2014 | Transfer i tne on all corners of Icom. Mark ne on periphery of wall by using chak tne. Fete perimeter channet onthe periphery of wall wih suitable fasteners (600 mm ee) 7 |ifark the poston of estanare on tue [slab at 1220 mm cic both direction [Atjuncion oftwe ines ale hole with ne nolp of t2mm dia. Or ba Insert hzmm dia & 38mm tong Raw plug inside a hole 7 [Fi the oft coato he Raw paar larxarxasmm x 1.6mm) at 120mm cl, Ensure the nut of Raut pg is propery tightened with Soft cleat | [5 |Ficthe cating angie (2aetOmmy oF suitable length to the soft cleat at /220mm cle with help of M6 Nut & bot © | Fake a pipe Yor water level and transfer the perimeter top flange level Jon tothe Ceiing Ange. Then mark the |osition of Intermediate Chancel IFixthe intemediate channel (15x48x15x0.60mm) to the fange of (Celing angle 25mm) with ME. Nut & bot Ensure Intermediate channel resting on Perimeter Channel Page Pisin Cena Syte x Galing Seaton ( oxen) perpendicular to the intermediate channel by using connecting cip Ensure distance batweon wo cong section should not be moce than les7mm cle 0 [Ensure the overlapping of Caling section & Intermediate channel should not be less the 150mm, Used metal to Imetal serous [Gross Check the level ofa Fame work to ensure entre fame isn Line Level [Cut the Coting secton atthe location lof opening ke Light opening / Ac [Opening / Access pane! [Ensure adaional suppor at both leutng ends by using intermediate [channel suspended trom soft, [Put perietor channel at ho periphery lot opening [Do boarcng by using 6x4R gypsum board. Ensure that the length of board lperpencioular to Ceing Section. ( Square Joint of Board screw fx on [Ceing section) Page? Pian Caing St [Putte 2emam diywall screws on board lat 150mm on periphery of Cling & at [230mm on cang section. Staggered the board joins Ensure tal, ho drywall sow are |omm away trom tapered eage & {3mm away ftom square 2dge to avoid breakage of the aypsum board [Cut the board at opening by using board cutting saw. [Put Edge bead at periphery of Board lopening to protect expose edges of boars Used Shadow tre bead t creat Onm laroove at th periphery of Cena lattched this bead along with the edge lot Gypboard and fixed on perimeter [channel and ished with Joining |compound Finish al the joins of boards with he cing compoun & paper tape. Dont remove paper from square edge jot of Gypaum board [ile fonts of boards wih jonting [compound & embed the paper ape "Spread rat coat of compaund 70mm 150mm on tape [Aer dying do tho canding Ye vemove loxcoss material 5 (apply second coat 200mm-250mm |wice & wird coat 300-480mm wide age Pian cating Sytem

You might also like