You are on page 1of 2

PERIOD COVERED Corresponding Number of Total 0

PROJECT
FROM TO Hours of Described Training No. Of
TITLE/DESCRIPTION & LOCATION
DAY MO YR DAY MO YR A B C(FOP)
D E F Hours

A 0
23 4 2007 27 4 2007 0 B 0
30 4 2007 4 5 2007 0 C 0
E 0
TOTAL NO. OF HOURS 0 0 0 0 0 0 0 F 0

7 5 2007 11 5 2007 0
14 5 2007 18 5 2007 0
21 5 2007 25 5 2007 0

TOTAL NO. OF HOURS 0 0 0 0 0 0 0

11 6 2007 15 6 2007 0
18 6 2007 22 6 2007 0
25 6 2007 29 6 2007 0

TOTAL NO. OF HOURS 0 0 0 0 0 0 0

2 7 2007 6 7 2007 0
9 7 2007 13 7 2007 0
16 7 2007 20 7 2007 0
23 7 2007 27 7 2007 0
30 7 2007 3 8 2007 0

TOTAL NO. OF HOURS 0 0 0 0 0 0 0

6 8 2007 10 8 2007 0
13 8 2007 17 8 2007 0
20 8 2007 24 8 2007 0
27 8 2007 31 8 2007 0

TOTAL NO. OF HOURS 0 0 0 0 0 0 0

3 9 2007 7 9 2007 0
10 9 2007 14 9 2007 0
17 9 2007 21 9 2007 0
24 9 2007 28 9 2007 0

TOTAL NO. OF HOURS 0 0 0 0 0 0 0

1 10 2007 5 10 2007 0
8 10 2007 12 10 2007 0
15 10 2007 19 10 2007 0
22 10 2007 26 10 2007 0
29 10 2007 31 10 2007 0

TOTAL NO. OF HOURS 0 0 0 0 0 0 0

5 11 2007 9 11 2007 0
12 11 2007 16 11 2007 0
19 11 2007 23 11 2007 0
26 11 2007 29 11 2007 0

TOTAL NO. OF HOURS 0 0 0 0 0 0 0


3 12 2007 7 12 2007 0
10 12 2007 14 12 2007 0
17 12 2007 19 12 2007 0

TOTAL NO. OF HOURS 0 0 0 0 0 0 0


1.1 Preparation of preliminary/schematic drawings
1.2 Landscape design
1.3 Aide in preparation of:
a. Specification writings
b. Cost estimates
c. Bill of materials
2.1 Site supervision/site inspection
1.1 Gathering of data & analysis of existing structure
1.2 Preparation of preliminary/schematic drawings
1.3 Preparation of architectural plans, elevation, sections, &
1.4 Aide in preparation of:
a. Specification writings
b. Cost estimates
c. Bill of materials
d. Contract documents
1.1 Gathering of data & analysis of existing structure
1.2 Preparation of as-built/preliminary/ schematic drawings
1.3 Attend site coordination meeting with consultants
1.4 Preparation of architectural plans, elevation, sections, &
1.5 Aide in preparation of:
a. Bidding documents
b. Specification writings
c. Cost estimates
d. Bill of materials
1.6 Interior design/Detailing of furnitures
2.1 Site supervision/site inspection
1.1 Power and Lighting Layout, Schedule of Load, Detail
1.2 Plumbing Layout
1.3 Mechanical Layout
1.4 Furniture Layout
1.1 Drafting of working drawings
1.2 Estimates and specifications
1.1 Drafting of existing and proposed floor plans
1.2 Drafting of elevations and sections
1.3 Estimates and specifications of ATM
1.4 Plumbing Layout
1.5 Mechanical Layout
1.1 Drafting of working drawings
1.2 Estimates and specifications
1.1 Office space planning
1.2 Fire & Burglar Alarm Layout
1.3 Power & Lighting Layout
1.4 Mechanical Layout
1.1 Fire and Burglar Alarm Layout
1.2 Power & Lighting Layout
1.3 Plumbing Layout
1.1 Drafting of existing and proposed floor plans
1.2 Pantry, Records, Stock Room and Comfort Room Detail
1.3 Schedule of Doors and Windows
1.4 Power and Lighting Layout, Schedule of Load, Detail
1.5 Telephone and Data Line Layout & Power Diagram
1.6 Plumbing & Mechanical Layout
1.1 Office space planning
1.1 Drafting of working drawings
1.2 Estimates and specifications
1.1 Estimates and specifications of ATM
1.2 Roof Framing Plan/Detail of Roofing
1.3 Power and Lighting Layout, Schedule of Load, Detail

You might also like