and Upgradation of Maksudangath - Sironj section of NH 752B from Ker 42+510
Ref: -
1) BCWPL/ Maksudangath - Sironj/NH-752B /18-19/120, Di, 02/04/2019
Dear Sir,
With reference to your submission vide letter mentioned above, regarding
‘our review for drawing of Minor Bridge,
List of Proposal is given below: -
& No_| Description | Chainage | Size of Si._[ Type of Construction _|
1__| Minor Bridge | 424750 “| 3X20.0m — | Reconstruction
The Structural design and Hydraulic data have been reviewed in. ‘conformity with
ope of project and as per codal provisions IRC-112 (2011), IRC -6 2014)
Design and Drawing is found as per order and specification, Hence submitted
drawing is accord for execution of work at site, It is to instruct that retaining
Wall should well intact in both banks as per site requirement.
‘Thanking you and assuring you of our best services at all times,
1. Design Drawing Minor Bridge -2 Set.
Jv. Krishna Techno, Association with
Global Infra Solutions. Navi Mumbai,
Copy to: - Executive Engineer PWD NH Division Bhopal
Corporate Office: Branch Office Site Office
co Cosa Serves Bebe Solon, ir Consus isha Te wit bale,
23H, 5h, tN. 7, Pup Py, Set Pol Bach ‘62.6001 thor print! Tower,
rs 1. ken i ah
foo a Aa hoe tle ‘eg, ptt) Nese. TL2 armies ghHYDROLOGICAL ANALYSIS FOR MINOR BRIDGE AT CHAINAGE 42+750
PEAK DISCHARGE COMPUTATION BY DIFFERENT METHODS,
Existir Proposed coe ‘Design Discharge
ing ‘By Area
ee [perer| cnime | ime [ecaace xe] Ry [Es
1 [ weriioe | aieezs | ovr | season | amzaze | _zreas | aoraeo
termi OF0oRLOOCAL AO ERA CALLAN
a ae
Saas Ss
= a
Velocity [m/s) 1.59,
Average depth (m) 4.719
i wa
a oe
ae
=a oe
a
oa on
a
— =
Sromimammn | a5
semen etaICKEN METHOD
[Existing Chainage (km) 41825,
[Name of bridge/stream : Minor Bridge | 1.67
[Proposed Chainage (Km) 424750,
Catchment Area, A 55.374 iSq.Km
‘Normal Annual Rainfall 113.55. lom (es per CGWB, Vidisha)
c 14 (As per Clause 4.2, IRC SP:13-2004)
Qa xa
Qa 28419 Cumecs